
Aalo Atomics
@AaloAtomics • 18,985 subscribers
We build mass-manufactured nuclear plants that will power anything from a datacenter to a large city.
Videos

Aalo was founded 3 years ago. On July 4th, we turned on our first nuclear reactor. Today, we're issuing an open call to technical and non-technical talent: help us unlock global energy abundance. Over the coming years, we will scale assembly-line manufacturing of modular power plants, starting with powering data centers and ending with energy abundance. View over 50 open roles spanning engineering, regulatory, manufacturing, software, and more at
Aalo Atomics624,696 просмотров • 2 месяцев назад

"The best way to power AI is with nuclear power. Advanced nuclear needs no water, uses a small amount of land, is clean baseload... [and] thanks to the choice of sodium as our coolant, we will have a very compact, mass-manufacturable design." - Matt Loszak at Energy Subcommittee Hearing: Powering the Nuclear Renaissance:
Aalo Atomics44,520 просмотров • 18 дней назад

"Criticality to commercialization" means the next phase of advanced nuclear deployment begins: building the Aalo-X power plant, securing an NRC license, and standing up a gigawatt-scale factory. We're hiring across every team. Be a part of unlocking energy abundance:
Aalo Atomics77,184 просмотров • 1 месяц назад

Aalo Atomics brought a commercial-scale advanced reactor to initial criticality on July 4, 2026 at 12:20 AM (MT). This means the President’s goal of at least three criticalities by July 4 has been surpassed, making "4 by the 4th" a reality. Read more ⬇️
Aalo Atomics115,231 просмотров • 2 месяцев назад

"Few people realize that there is as much energy contained in US nuclear waste as there is in global known oil and gas reserves... we can extend the usable lifespan of nuclear fuel on Earth from one to two hundred years to millions of years." - Matt Loszak at Energy Subcommittee Hearing: Powering the Nuclear Renaissance:
Aalo Atomics22,777 просмотров • 18 дней назад

Today, we unveiled our completed Critical Test Reactor facility. This commercial-scale reactor with fuel to produce 10 MW of electricity was assembled on site from modular components to conclude a net ~70 day timeline from a desert plot to a reactor, reactor facility, and command & control center. Nuclear fuel will arrive soon and, pending final DOE approval, we will go critical before the President Donald J. Trump July 4th deadline. Here's a first look at some of the work that has gone into this unveiling:
Aalo Atomics151,973 просмотров • 6 месяцев назад

"What we're doing next is helping the US to regain its mastery of sodium as a coolant... one of the best reactors that the US ever built was EBR-II. It demonstrated incredible passive safety... unfortunately, due to political reasons, that reactor was discontinued. So what we are trying to do is take what's left of that talent and knowledge in the country and rebuild that muscle." — Matt Loszak | Aalo Atomics, CEO of Aalo Atomics, testifying at the Energy Subcommittee hearing "Powering the Nuclear Renaissance"
Aalo Atomics16,765 просмотров • 18 дней назад

Matt Loszak | The Next Commercial Era of Nuclear Energy
Aalo Atomics23,938 просмотров • 1 месяц назад

See behind the scenes of Aalo's advanced reactor criticality, occuring at 12:20 a.m. MT on July 4th. This is a first-of-its-kind, uncut five-hour stream showcasing the technical process of starting up a nuclear reactor for the first time. Programming includes previously unreleased videos, interviews with Aalo engineers, and remarks from Matt Loszak and Yasir Arafat. We will release key segments (1-10 minute duration) with commentary throughout this week. Part 1/2 - preshow to final fuel assembly:
Aalo Atomics25,308 просмотров • 2 месяцев назад

Seth Cohen | Driving the Nuclear Renaissance Recorded at Criticality to Commercialization.
Aalo Atomics10,635 просмотров • 1 месяц назад

US Secretary of Energy Wright: "The whole idea of small modular [nuclear] reactors is everything in our lifetimes that is built in a factory has become cheaper and faster to build. When you stick-build something on location, those things have become more expensive and slower... the more you can build in quantity in manufacturing facilities, we're very good at driving the cost of those down. To build nuclear systems and nuclear supply chain at scale, that's the road to lower cost." From Relentless pod with Ti Morse.
Aalo Atomics17,668 просмотров • 3 месяцев назад

Here's a first look inside our Critical Test Reactor Facility, housing Aalo's first nuclear reactor. The CTR is a milestone in developing Aalo-X, our demonstration nuclear power plant purpose-built to power AI data centers. Take a tour with our CTO Yasir Arafat and learn how the facility works.
Aalo Atomics12,709 просмотров • 4 месяцев назад
Больше нет контента для загрузки

