
Avid Space
@LabPadre • 97,576 subscribers
Bringing you live views and updates from Starbase and Cape Canaveral 🚀
Shorts
Videos

The USS Vicksburg is being towed toward the port of Brownsville, for final dismantling and scrapping. Commissioned in 1992, she served in the United States Navy until being decommissioned in 2024 following a costly program that failed to achieve operational readiness. 🫡
Avid Space234,417 просмотров • 7 дней назад

Booster 13 has arrived at the Launch Pad. Flight 6 is expected on 11/18.
Avid Space48,218,033 просмотров • 1 год назад

Booster 22 has conducted a Static Fire test today on Pad-2.
Avid Space33,497 просмотров • 4 дней назад

There's been a lot of arcs and sparks on the top of Gigabay tonight. There seems to be some serious electrical issues.
Avid Space61,250 просмотров • 16 дней назад

Ship 40 has relocated to the ring yard. Come and watch with us to see what happens next.
Avid Space41,034 просмотров • 17 дней назад

The forward section for Ship 45 has been moved into Megabay2 and sleeved over the Pez Dispenser mechanism.
Avid Space15,356 просмотров • 6 дней назад

The first bridgecrane in the Gigabay is being lifted into position.
Avid Space22,511 просмотров • 13 дней назад

Quite the celebrity welcome on return to the build site, with SpaceX employees cheering and clapping B12 home.
Avid Space717,691 просмотров • 2 лет назад

This week crews installed 8 large hvac units on the 2 mechanical roof areas of giga bay. On Monday the first 4 were installed, followed by the other 4 this morning. Our friends at RGV Aerial Photography got a great shot of these areas from above in their flyover yesterday, which you can see over on their page.
Avid Space38,009 просмотров • 1 месяц назад

Ship 42 has been rolled back to Megabay 2 after spending a couple of days down at the Pad for Chopstick integration tests.
Avid Space37,525 просмотров • 1 месяц назад

Ship 36 has sadly experienced an anomaly at the test site.
Avid Space219,546 просмотров • 1 год назад

After testing with Ship 42 on pad 2 chopsticks yesterday, there is some more testing today. Ship 42 was lifted to the top of the tower, the ship quick disconnect arm moved into position and the ship slowly moved back down to meet with the arm. The SQD got connected a few times. Testing is still ongoing. Watch live:
Avid Space27,091 просмотров • 1 месяц назад

Ship 42 has arrived at Massey's for a second round of testing.
Avid Space27,411 просмотров • 1 месяц назад

The full Pad-2 Deluge system has been activated for the first time. That's insane!
Avid Space102,995 просмотров • 8 месяцев назад

