
DRM Mumbai CR
@drmmumbaicr • 108,448 subscribers
Official account of Divisional Railway Manager, Mumbai division, Central Railway.
Shorts
Videos

Fortress ticket checking conducted at DOMBIVALI station on Friday 07/08/26. TTEs deployed- 15. RPF Staff- 6 Commercial officer- 1 Total without tickets passengers found- 362. Total penalty imposed on them- Rs. 1,82,310/- 1) Without ticket in AC coaches- 4. Penalty- 2410/- 2) Without ticket in 1st class- 51. Penalty- 28795/- 3) Without ticket in 2nd class- 234. Penalty- 119425/- 4) Unbooked luggage- 61. Penalty- 7680/- 5) Illegal Hawker- 1. Penalty- 2000/- 6) Travelling in Divyangjan coaches- 11. Penalty- 22000/-
DRM Mumbai CR94,556 görüntüleme • 1 gün önce

FORTRESS TICKET CHECKING DRIVE conducted today 04/08/26 at Ghatkopar station. Total 265 without ticket passengers penalised with ₹ 1,26,330 penalty. 1) 2 Without AC Ticket passengers penalised with ₹ 1,155 penalty. 2) 16 First Class Without Ticket passengers penalised with ₹ 9,095. 3) 15 Difference Fare passengers penalised with ₹ 8,420. 4) 192 Second Class Without ticket passengers penalised with ₹ 97,870. 5) 38 Unbooked Luggage cases penalised with ₹ 5,790. 6) 1 Hawker and 1 Handicap Misuse penalised with ₹ 2,000 penalty each. Total 15 TTEs and 5 RPF participated in the drive.
DRM Mumbai CR147,538 görüntüleme • 6 gün önce

On 13.03.2026, a special fortress check was conducted at Vashi station during evening peak hrs. 393 ticketless passengers were caught, and A ₹ 1,02,260/- penalty was imposed. Passengers are requested to travel with proper tickets for a smooth and hassle-free journey.
DRM Mumbai CR51,304 görüntüleme • 5 ay önce

Extension of platforms for EMU suburban 15 car work in progress at Thane PF 1, 2 & 3 (CSMT end) and at Dombivali PF 1A, 1 & 2, such as- 1) Dismantling and Insertion of point 125W. 2) Connection of new 125W crossover with newly laid 150 Mtr plain track by slewing it by 4-5 mtr. 3) 7 OHE mast/portal dismantling, shifting all main cabling and creating space for track slewing and extension. 4) Loading of scrap & unloading of 13 mtr rails using 11 BRN rake. 5) Dismantling and insertion of crossover 148 A/B by shifting 60 mtr using hydra/JCB & poclain machine. 6) PCTM machine turnout & crossover tamping of Point 135B, 146A, 148A & 148B. 7) Space creation to shift turnout ladder of point 149 A/B and further space creation for platform extension.
DRM Mumbai CR10,892 görüntüleme • 4 ay önce
Daha fazla içerik yok.