This is Mwache Dam; an engineering marvel coming up in the heart of Kwale County - Part 2
Eng. Eric Mugaa229,652 görüntüleme • 21 gün önce

Public participation on Water Resources Authority Water Abstraction Tariffs and the misconceptions - Part 1
Eng. Eric Mugaa13,122 görüntüleme • 15 gün önce

This is Mwache Dam; an engineering marvel coming up in the heart of Kwale County - Part 1
Eng. Eric Mugaa16,305 görüntüleme • 22 gün önce

Sunday fitness for better living. Health is your greatest asset!
Eng. Eric Mugaa159,661 görüntüleme • 1 yıl önce

We need to make some key changes to deliver projects within stripulated timelines, otherwise value for money is lost in the process. It’s tough, but we need to embrace the challenges that come with Engineering projects! Inspection of Kajogu and Thambo Dams
Eng. Eric Mugaa29,149 görüntüleme • 8 ay önce

Water storage to Control Flooding and Boost Irrigation
Eng. Eric Mugaa55,993 görüntüleme • 1 yıl önce

Kirandich Catchment Conservation in Baringo County, silt and sedimentation control using check dams. It is key to note that water comes from the catchment and not a tap and has a cost implication to get it to consumer’s residence. Payment of water bills guarantee sustainability.
Eng. Eric Mugaa18,461 görüntüleme • 7 ay önce

Seed cane production in Bura Irrigation Scheme and Plans for Mechanized farming in future
Eng. Eric Mugaa17,848 görüntüleme • 6 ay önce

Today, I conducted a thorough inspection of the Galana Kulalu Food Security Project in Kilifi and Tana River Counties. The project comprises several components, each at varying stages of completion. The project includes the construction of intake works, consisting of an intake well, a pump house, five low-lift pumps (four operational and one standby), and a 1600 mm delivery pipe connected to the canal inlet structure. Additionally, it involves the development of a 753-meter-long inlet canal, a reservoir with a storage capacity of 450,000 cubic meters, a 1,210-meter-long outlet canal designed for a normal flow of 6.94 cubic meters per second and a full flow of 9.32 cubic meters per second, and an off-take sump with a capacity of 20,000 cubic meters. Overall progress stands at 99.7%, with the remaining tasks being expedited to meet the established timelines. Upon completion, the project will bolster national food security by optimizing productivity on the ranches through targeted investments in crop and livestock production, aligning with the Bottom-Up Economic Transformation Agenda (BETA). Following the site visit, I convened a consultative meeting with key stakeholders and agencies involved in the project’s implementation. These included government institutions such as the National Irrigation Authority (NIA), Agricultural Development Corporation (ADC), Kenya Rural Roads Authority (KeRRA), and Rural Electrification and Renewable Energy Corporation (REREC), as well as private entities like Selu, the Korean Solar Power Consortium, contractors CRBC and Irrico, consultants BeAssociates, and other investors. We agreed that each team would accelerate their respective components to ensure completion as scheduled. Additionally, we committed to conducting regular site visits to monitor progress as we prepare to commence cropping in mid-May.
Eng. Eric Mugaa26,478 görüntüleme • 1 yıl önce

Happy New Year 2026 friends. We are officially back and our priorities are ordered. Maji ni uhai.
Eng. Eric Mugaa14,383 görüntüleme • 8 ay önce