Lisan al Gaib's banner
Lisan al Gaib's profile picture

Lisan al Gaib

@scaling0157,128 subscribers

lead them to paradise LisanBench: https://t.co/vorVk7Oks6 Impressum & Datenschutz: https://t.co/lFLgiu9cqs

Shorts

Ox Alpha one-shotted the GPU accelerated fluid simulation in a single 1000 line html file it looks absolutely stunning and is 1000x better than what Qwen3.8 27B or Opus 4.5 did when I tested them earlier this week

Ox Alpha one-shotted the GPU accelerated fluid simulation in a single 1000 line html file it looks absolutely stunning and is 1000x better than what Qwen3.8 27B or Opus 4.5 did when I tested them earlier this week

248,222 просмотров

Andrej Karpathy calls AI Agents slop "Overall, the models they are not there. And I feel like the industry [...] it's making too big of a jump and it's trying to pretend that this is amazing. And it's not—it's slop! And I think they are not coming to terms with it. And maybe they are trying to fundraise or something like that, I'm not sure what's going on."

Andrej Karpathy calls AI Agents slop "Overall, the models they are not there. And I feel like the industry [...] it's making too big of a jump and it's trying to pretend that this is amazing. And it's not—it's slop! And I think they are not coming to terms with it. And maybe they are trying to fundraise or something like that, I'm not sure what's going on."

3,130,101 просмотров

Sora-2 counting the R's

Sora-2 counting the R's

310,483 просмотров

Sora-2 brainrot: a cat walking on the ceiling as if it were the floor

Sora-2 brainrot: a cat walking on the ceiling as if it were the floor

306,977 просмотров

Stargate Abilene - overview, progress and speculation + satellite pics Power: 1.2 GW total for 8 buildings ~44,600 m² (~8+ American football fields)., 4 halls each Timeline: Construction began June 2024 (Phase 1: 2 buildings). June 2025 the first two buildings were completed and the campus began early training/inference. Phase 2 adds 6 more buildings; full campus mid-2026 GPU count (planned): March 2025: ~400k GB200 chips (~50k/building). Oct 2025 (Larry Ellison): >450k GPUs (>56.25k/building) Cooling approach: Direct-to-chip, closed-loop, zero-evaporation liquid cooling. Water: ~1,000,000 gallon one-time fill per building; ~12,625 gallons/year per building for maintenance and quality Chillers: 80 per building. Building 1 in red: smaller frames (something like Vertiv LVZ170), up to ~2.7 MW each. Newer buildings in green: 20% larger frames (something like Vertiv LVZ230), up to ~3.1 MW each. Usually around 2 MW/unit and only 50-60 during normal operation. The rest are for backup or extreme heat. -> likely increased cooling capacity to accomodate 50k more GPUs over 8 buildings On-site generation: Parker Hannifin supplying 29 dual-fuel GE Vernova LM2500XPRESS turbines (~35 MW each) for ~1.015 GW on-site capacity. Currently 9 deployed at 315 MW with 10th one in progress Speculation: - Compute: 196 racks/hall → 784 racks/building → 56,448 GPUs/building → 451,584 GPUs campus-wide - Power: 784 × 132 kW = 103.488 MW IT/building → at PUE 1.15 ≈ 119 MW/building → ~952 MW campus total (leaving headroom under 1.2 GW) - Site status as of October 30th 2025: Construction started for all buildings in phase 2 and a third building appears nearly complete with chillers installed

Stargate Abilene - overview, progress and speculation + satellite pics Power: 1.2 GW total for 8 buildings ~44,600 m² (~8+ American football fields)., 4 halls each Timeline: Construction began June 2024 (Phase 1: 2 buildings). June 2025 the first two buildings were completed and the campus began early training/inference. Phase 2 adds 6 more buildings; full campus mid-2026 GPU count (planned): March 2025: ~400k GB200 chips (~50k/building). Oct 2025 (Larry Ellison): >450k GPUs (>56.25k/building) Cooling approach: Direct-to-chip, closed-loop, zero-evaporation liquid cooling. Water: ~1,000,000 gallon one-time fill per building; ~12,625 gallons/year per building for maintenance and quality Chillers: 80 per building. Building 1 in red: smaller frames (something like Vertiv LVZ170), up to ~2.7 MW each. Newer buildings in green: 20% larger frames (something like Vertiv LVZ230), up to ~3.1 MW each. Usually around 2 MW/unit and only 50-60 during normal operation. The rest are for backup or extreme heat. -> likely increased cooling capacity to accomodate 50k more GPUs over 8 buildings On-site generation: Parker Hannifin supplying 29 dual-fuel GE Vernova LM2500XPRESS turbines (~35 MW each) for ~1.015 GW on-site capacity. Currently 9 deployed at 315 MW with 10th one in progress Speculation: - Compute: 196 racks/hall → 784 racks/building → 56,448 GPUs/building → 451,584 GPUs campus-wide - Power: 784 × 132 kW = 103.488 MW IT/building → at PUE 1.15 ≈ 119 MW/building → ~952 MW campus total (leaving headroom under 1.2 GW) - Site status as of October 30th 2025: Construction started for all buildings in phase 2 and a third building appears nearly complete with chillers installed

143,745 просмотров

Videos

scaling01's profile picture

Mythos made something a little bit more exciting

Lisan al Gaib

631,766 просмотров • 2 месяцев назад

scaling01's profile picture

my last two brain cells when i have to perform well

Lisan al Gaib

54,747 просмотров • 12 дней назад

scaling01's profile picture

GPT-5.4 is special LisanBench: GPT-5.4 vs Opus 4.6 vs Gemini 3.1 Pro

Lisan al Gaib

265,203 просмотров • 6 месяцев назад

scaling01's profile picture

and so it begins

Lisan al Gaib

36,020 просмотров • 6 месяцев назад

Больше нет контента для загрузки