#masteredgeacademy
Understanding Leveling & Its Calculations - Part 1 How does leveling work in surveying? And how do you calculate HI and RL from your field readings? In this Part 1 tutorial, we go from the field observation to the actual calculations. You’ll see how a surveyor takes: ➡️ BS = 1.20 m on a TBM ➡️ IS = 1.16 m at Point 1 ➡️ IS = 2.01 m at Point 2 ➡️ FS = 1.90 m at Point 3 Then we calculate: HI = RL + BS and RL = HI − IS/FS By the end, you’ll understand why the HI remains constant when the instrument stays in the same position, while different staff readings produce different RLs. #survey #level #student #masteredgeacademy
MasterEdge Academy133,600 görüntüleme • 3 ay önce
Road Alignment Setting Out Using a Total Station Before a road is constructed, the design on paper has to be transferred accurately onto the ground and this is where surveying plays a major role. A total station is one of the key instruments surveyors use for road construction and setting out works. The process generally begins with establishing the instrument over a known control point and orienting it to another known point. Once the instrument is correctly set up and oriented, the surveyor can begin setting out the designed road alignment. The centreline is established by setting out calculated points along the alignment. Chainages such as 0+000, 0+010, 0+020 and so on help identify positions along the road. From the centreline, offsets can then be set out to establish road edges and positions for features such as drains, kerbs and other construction elements. In simple terms: The design is on the plan. The surveyor puts it on the ground. The total station helps make that transfer precise. #Surveying #TotalStation #masteredgeacademy #Engineering #Construction
MasterEdge Academy75,500 görüntüleme • 2 ay önce
Daha fazla içerik yok.

