#systems

As of yesterday, #Rooppur NPP unit-1 in #Bangladesh reached nominal #design #parameters of #pressure and #temperature in the primary circuit. Currently, last check are made of the sub #systems and re-evaluation of the core diagnostic #calibration. If everything met the design requirements, the #reactor is ready to start up to its first #criticality, the lowest controllable power level. Video: Рупор Руппура Source: on-site staff
Dirk Egelkraut19,090 Aufrufe • vor 28 Tagen
Keine weiteren Inhalte verfügbar