正在加载视频...

视频加载失败

A robust and interconnected China during the 14th Five-Year Plan (2021–2025): ✅Over 80% of the “Eight North-South and Eight East-West” high-speed rail network completed & operational ✅160,000 km of total railways, including 48,000 km of high-speed lines ✅97% of major cities covered by high-speed railway network Building infrastructure that...

18,903 次观看 • 8 个月前 •via X (Twitter)

0 条评论

暂无评论

原始帖子的评论将显示在这里

相关视频