AI builders need computing capacity they can put to work sooner. We introduced DSX POD at NVIDIA GTC Berlin: AI factories integrated and tested before delivery, enabling deployment at prepared sites in as little as 14 days.

126,147 просмотров • 4 дней назад •via X (Twitter)

Комментарии: 25

Фото профиля NVIDIA
NVIDIA4 дней назад

Read the news from GTC Berlin ⬇️

Фото профиля Ardullo
Ardullo4 дней назад

AI factories ready to deploy in 14 days, that's fast 🏭 Groklet already called dibs on the first rack ⚡ @grok

Фото профиля Tem (buys traffic)
Tem (buys traffic)3 дней назад

pre-integrated and tested before shipping means the hard part was never the chips, it was everything around them

Фото профиля leviii
leviii3 дней назад

14 days is the easy number. The slow part is everything outside the box. Getting a big grid hookup approved can take years in a lot of places, so the prepared site is doing the heavy lifting. Compute is quietly turning into a power and permitting business.

Фото профиля 剑的 AI 实验室
剑的 AI 实验室4 дней назад

14 days is the headline, but what does "prepared site" include? Grid power and cooling already in place? Site readiness looks like the real bottleneck now, not the racks.

Фото профиля Laosun
Laosun3 дней назад

14 days once the site is ready. The harder part now is getting a site with grid power at all, and that can take years.

Фото профиля Diego Viteri
Diego Viteri4 дней назад

data centers got the meal kit treatment, 14 days and you're cooking

Фото профиля ArcyDev
ArcyDev4 дней назад

NVIDIA DSX POD is a pre-integrated and tested AI infrastructure solution that can be deployed in as little as 14 days at a prepared data center.

Фото профиля Bernard Oakwood
Bernard Oakwood4 дней назад

14 days from delivery to a live AI factory, versus 18+ months for a classic build. Pretested compute moves the bottleneck to power and permits. By 2031, prepared sites will be the real moat.

Фото профиля Ethan | Startup Autopsy
Ethan | Startup Autopsy3 дней назад

14 days from truck to tokens is wild. the real bottleneck is still the utility approving the power hookup tho

Фото профиля Zeii Dude
Zeii Dude4 дней назад

The AI race is becoming a race to build the infrastructure first, and NVIDIA wants to sell the picks and shovels, the factory and the assembly line Deploying an AI factory in 14 days sounds impressive, but it also shows how quickly the industry is normalizing enormous computing demands, energy consumption and infrastructure costs just to keep up with the next wave of AI

Фото профиля Petr Aman
Petr Aman3 дней назад

An AI factory in a shipping container, plug it in and it runs in 14 days. Basically IKEA for data centers, except it arrives fully assembled 😎

Фото профиля why
why4 дней назад

Pre-integrated and tested before delivery sounds like the key here. Cutting site deployment to 14 days could change how teams plan capacity.

Фото профиля Dimss | Crypto × AI
Dimss | Crypto × AI4 дней назад

Now the neuro-shovel will become many times larger

Фото профиля lewington
lewington4 дней назад

damnn your 6 month build really jus turned into a 14 day plug and play pod 💀

Фото профиля Stelnora
Stelnora3 дней назад

Pre-delivery integration and testing could make deployment more predictable, too. For AI teams planning their next training run, knowing when the compute will be ready is a big deal.

Фото профиля 馒头不是程序员
馒头不是程序员4 дней назад

Fourteen days from order to running is wild. Lead time is everything.

Фото профиля saietta
saietta3 дней назад

14 days from delivery is nice but in most of europe just getting a grid connection approved for a site like that takes years

Фото профиля Kenneth Alvseike
Kenneth Alvseike4 дней назад

14 days?! That is wild

Фото профиля Nick
Nick4 дней назад

Integrated and tested before delivery is the part that matters. The hard part of an AI factory was never buying the chips, it was the months between the truck arriving and the first job running.

Фото профиля Velv
Velv4 дней назад

14 days for an ai factory??? the future feels way too close rn

Фото профиля Zentrion
Zentrion4 дней назад

Fourteen days on a ready site is the part that stands out, because it implies the integration and testing already happened before shipping. That moves a lot of the schedule risk off the customer's site and into the factory.

Фото профиля Macro Bombastic
Macro Bombastic3 дней назад

14 days is wild tbh, integration done before it even ships

Фото профиля AI Daily Tools
AI Daily Tools3 дней назад

14 days only counts if the site is truly prepared. Power, cooling and networking are usually the long pole, not the racks. Still, shipping pre-integrated, pre-tested factories shifts the bottleneck upstream, which is exactly where buyers feel it most.

Фото профиля Avi.Marius 🪩
Avi.Marius 🪩4 дней назад

For those who don't know NVIDIA introduced DSX POD a ready to use computing system designed for AI. Instead of spending months setting everything up companies can get it running in as little as 14 days if the site is ready. This means faster AI development and less time waiting for the infrastructure to be ready.🧠