Video wird geladen...

Video konnte nicht geladen werden

Zur Startseite

ANTHROPIC LEAKED A GRAPH WHERE ONE FILE WITH 7 ITEMS CUTS YOUR WORK FROM 8 HOURS TO 40 MINUTES AND TAKES 40 DECISIONS A DAY OFF YOU autonomy isn't a slider you drag to the right - it's a graph with 7 steps, and exactly one edge leads into...

41,920 Aufrufe • vor 1 Monat •via X (Twitter)

0 Kommentare

Keine Kommentare verfügbar

Kommentare vom Original-Post werden hier angezeigt

Ähnliche Videos

Loops vs. Graphs, clearly explained! loops are great, but they have a ceiling: a loop makes one unit of work better. it cannot decide which units exist. so you end up with a very good agent running the wrong three steps, in the wrong order, one at a time. Graph engineering fixes this by moving the decision up a layer: what runs, what runs at the same time, and what never runs at all. you need both. here's how it works: a graph splits your system into two kinds of decision. ↳ inside a unit: the loop. produce, check, correct, repeat until green ↳ between units: the graph. split, fan out, merge, gate, send back Prompts → Context → Harness → Loops → Graphs you get parallel work, isolated contexts, and steps that stop running when nothing needs them. the trick is being selective about what becomes a node. only spend a model where judgment lives. merging, ranking, deduping and schema checks are edges, and edges are code. free, instant, and they cannot be argued out of a verdict. a graph where every edge is an agent pays rent on its own wiring. one thing to know before you scale it. a graph has two return paths, and almost everyone builds one. ↳ the correction edge is short. a gate rejects one unit back to the step that produced it, and it fixes the run you are in ↳ the learning edge is long. an accepted result goes back to the splitter as a constraint, and it fixes every run after skip the second and you get a graph that is fast and never gets smarter. next week it starts from the same place with the same blind spots. and a smaller one that eats whole nights: when a unit fails, return that unit, not the batch. send back four slices because one failed and you have just rewritten three correct ones. do it twice in a run and the run never converges. below i have quoted my full guide on graph engineering. it covers the three topologies, the verifier patterns, and where the gate should actually open. save this and read it below ↓

Hanako

73,867 Aufrufe • vor 1 Monat

Orchestrators vs. Graphs, clearly explained! orchestrators are great, and everyone builds one first. here is the ceiling: an orchestrator sits above the work and routes every message. five agents report to it. it reads all five. it decides what each one does next, and reads all five replies. that is ten trips through one context, and by the fifth agent that context has read four reports, five instructions and its own reasoning about all of them. Graph engineering fixes this by removing the seat: not a better router, but no router at all. you need both, and here is the sentence that resolves the whole confusion: an orchestrator sits above the work and holds all of it. a graph is the shape of the work, and holds none of it. ↳ above the work: one context that has to see everything before anything ships ↳ inside the work: a splitter that hands out and lets go, and a merge that reads nothing Prompts → Context → Harness → Loops → Graphs the coordination did not disappear. it moved into the edges, where it costs nothing and cannot get tired. the trick is noticing what you actually built. if one node has to see every result before the run can finish, you did not remove the bottleneck. you hired it, gave it the longest context in the system, and made it the thing you were counting on to stay sharp. one thing to know before you scale it. an orchestrator degrades in the one way nothing catches. ↳ it does not crash, time out or return an error. it stays up and keeps routing ↳ it just starts routing worse, somewhere around the fifth report, and every downstream agent does exactly what it was told that last one catches careful people. you can have perfect isolation on every worker and still have one window quietly drifting at the top, and the traces will all look clean because each worker did its job. and the one that eats whole nights: the merge is where this shows up first. ranking five findings is not judgment, it is a sort. if a model is doing it, you are paying a model to read five reports so it can put them in an order that three lines of code would have got right, and now that model has read everything too. below i have quoted my full guide on graph engineering. it covers the three topologies, the verifier patterns, and where the gate should actually open. save this and read it below ↓

Hanako

44,226 Aufrufe • vor 20 Tagen

Workflows vs. Graphs, clearly explained! workflows are great, and almost everyone has one. here is the ceiling: a workflow decides every step before it runs. you drew eight boxes in March. six months later the same three fire, every single time, and the other five have never once been reached. then a case arrives that nobody drew, and it goes to the closest wrong box. quietly, with a green status, because from the inside that looks exactly like success. Graph engineering fixes this by moving the decision: not what the steps do, but when the steps get chosen. you need both, and here is the sentence that resolves the whole confusion: a workflow decides the steps before it runs. a graph decides them while it runs. ↳ drawn in advance: the boxes, the branches, the order, the error path ↳ decided at runtime: how many units exist, what each one is allowed to see, which ones get created at all Prompts → Context → Harness → Loops → Graphs branches do not make it a graph. the branches were drawn in advance too, which means every one of them is a case you already thought of. the trick is knowing which part is allowed to be fixed. the node kinds are fixed. a splitter is a splitter, a gate is a gate, a merge is code. what is not fixed is how many of them exist this run, and that is decided after something has been read. one thing to know before you scale it. a workflow fails in a way that never pages anyone. ↳ the wrong branch ran, every check inside it passed, and the output is well formed ↳ nothing errored, because routing to the wrong box is not an error, it is a route that last one catches careful people. you cannot test your way out of it either, because the test suite was written from the same diagram that has the gap in it. and the one that eats whole nights: a workflow that has never surprised you is not stable, it is narrow. if it has run four hundred times and produced the same three shapes, it is not handling your work. it is handling the part of your work that fits it, and you have quietly stopped sending it the rest. below i have quoted my full guide on graph engineering. it covers the three topologies, the verifier patterns, and where the gate should actually open. save this and read it below ↓

Hanako

16,810 Aufrufe • vor 21 Tagen