Bitcoin Successfully Mines 975,000th Block
@DocumentingBTC1.1M followers
29,424 views
15 Comments
Comments from the original post on X (Twitter)

@williamclay
975k means 75,000 blocks to the next halving at 1,050,000. at ten minutes a block that's about 520 days, so the supply cut is still a 2028 story.
1 like

@O4SI5
975,000 blocks puts the next halving at block 1,050,000 about 75,000 blocks away, roughly 17 months at the 10-minute target. That schedule has not slipped once, which is the whole product. The more interesting test for the next cycle is whether fee revenue can carry a bigger share of miner income as the subsidy steps down to 1.5625 BTC.

@ZeroMazed
975,000 blocks and my portfolio still acting like it's block 1

@Web3Counsels
Block one million lands around September at the current cadence. Twenty-five thousand blocks from now, and the supply schedule still will not have asked anyone's permission.

@vovweb3
975k blocks, my $BTC bag nods!

@shitcoinzillion
Good till the last drop!!

@Kael1632108
从 2009 年创世到现在这 975000 个块,平均出块大约 9.6 分钟,比设定的 10 分钟要快一截。这个块是北京时间今天早上 7:36 由 Foundry USA 挖出来的,里面 2710 笔交易,手续费大约 0.034 个比特币。

@getalphacharts
75,000 blocks to go until the next halving at block 1,050,000, around April 2028 at 10 minutes a block.

@TheDeFiGravity
75k blocks to the next halving. spring 2028 at the current pace

@oneminvin
almost a million

@Coin_Scoop
Block after block, right on schedule. That steady rhythm is the quiet strength of the network.

@harvey8112
975,000 blocks and not one of them checked the price before turning up to work

@menghung741209
975,000 blocks in. No bailouts, no downtime, no permission asked. That's the whole point.

@thybead
25k blocks to go till a million

@Ginnn_toniccc
75k blocks left until the next halving, the clock keeps ticking
