Video wird geladen...

Video konnte nicht geladen werden

Zur Startseite

FIRST RIDE! Mumbai's first underground Metro Aqua Line 3. Let's take a ride. The platform is three floors down.

327,775 Aufrufe • vor 1 Jahr •via X (Twitter)

10 Kommentare

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

Inside the train and at Marol Naka and Aarey stations.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

Pic 1. The entry point on the main BKC Road next to IT buildings. Pic 2. Down the staircase. Pic 3 The turnstiles after which one has to go down one more floor. Pic 4 And on the lowest floor is the island platform with PSD and trains waiting.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

After this, we took a ride and reached Marol naka station where the line integrates with Blue Line One (Versova-Ghatkopar Line) at Marol.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

VIDEO1- Marol station has the second tallest escalator on the line of 18 m height. The tallest one is of 21m at CSIMA-T2 station. VIDEO2-Control room at Marol Naka station. PIC also of the control room at the station.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

Marol Naka station has been made into two boxes due to limitations. Behind the wall of this platform corridor is the pillar of Metro Blue Line 1 (Versova-Ghatkopar) line which passes above this station with station integration.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

The awesome @AlstomIndia train and various signage inside.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

And the train rises up to reach Aarey JVLR station, the only overground station on the line. One can see the trains lined up in the carshed and the seamless entry into the station.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

This is from the terrace of Aarey station. One can see the JVLR and under-construction elevated Metro Pink Line 6. (Andheri-Kanjurmarg) and the SEEPZ station. Once ready, there will be a seamless connectivity between the Aarey and SEEPZ station.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

And finally, the Aqua Metro Line 3 security 'battalion' in preparation & practice of the opening, set to happen soon.

Profilbild von Rajendra B. Aklekar
Rajendra B. Aklekarvor 1 Jahr

Unroll @threadreaderapp

Ähnliche Videos