Video wird geladen...
Video konnte nicht geladen werden
Great construction work
4,097,446 Aufrufe • vor 3 Monaten •via X (Twitter)
29 Kommentare

What if you need to fix something? Just put a panel in front instead of doing this.

Not really. Pipes are laid too close together leaving too little cover for the render to stick hold and avoid hairline cracking in the future. 30mm between pipes and between the pipes and the surface should be a minimum

But

That will crack in a week

That piping layout is next level. Dude’s an artist with conduits fr

He needed to put mesh in there.

Great until someone drills a hole to hang up a painting!

Mal hecho, el cemento no aguanta y se cae en poco tiempo. Hay que cubrir con una malla metalica, ensuciarla con cemento y agua y luego revocar . Gracias

Well arranged piping,but will that cement hold?

I always thought the cables need to be easily accessible, not poured over with concrete lol ?

So as those pipes expand and contract with temperature, does that not create cracks in the coating?

No it's not. If those are electrical cables they need airflow to dissipate heat or the cables will overheat and be a fire risk.

кто то может пояснить зачем так высоко шкаф, и почему трубы не постить сразу вниз?

This is the first time I've seen such clean work

Ai

Tak kira arena jalan tamia wkwk

Bft to the game on

สุดยอด

Yes, seriously, but he needTo get plastic so that you don't get a crack

Amigo echale de a poco y que vaya tirando...

Imagine someone drills a hole through the pipes. I would assume the pipes are beneath or above the box.

Lok really nice, if this had happened in India then 2 wires would have been visible here and 2 wires here.

This dude has zero commitment issues

ngerjain ini berapa hari ya, warnanya ngeblend sempurna sama temboknya

Solid work. That framing looks built to last.

those red pipes look really neat

Omg

So intelligent 🧠🧠

Nunca, eu colocaria algo de fácil remoção.
