正在加载视频...

视频加载失败

In Australia, under proposed national standards, new data centres must bring their own 100% renewable energy supply, firmed by batteries or gas. Crucially, this means new, additional renewable generation, not simply claiming certificates against generation already on the grid. And the scale is enormous. AEMO is already tracking 225...

71,199 次观看 • 1 个月前 •via X (Twitter)

49 条评论

Chris Meder 的头像
Chris Meder1 个月前

AI is going to need enormous amounts of electricity. Make that demand bring new renewable generation with it, and AI becomes an accelerator for solar, wind, batteries and the grid, not a burden on it. Forcing new data centres towards 100% NEW renewable energy, alongside other key sustainability obligations, is a great way to flip the anti-AI data-centre sentiment on its head: see the enormous demand as an opportunity rather than adversity. It should also accelerate Australia's own SWB buildout, pulling demand for critical minerals and Australian mining along with it: lithium, copper, gold and more. AI's energy appetite could become an industrial tailwind far beyond the data centres themselves.

Leftwing Bastard 的头像
Leftwing Bastard1 个月前

@c_barcza The rollout of renewables to power them is substantial.

Grant 的头像
Grant1 个月前

Nope...you can use coal. It's much cheaper.

Chris Meder 的头像
Chris Meder1 个月前

fact check this claim please: “Coal is much cheaper than renewables for powering new Australian data centres.” Compare the cost of building new coal generation today against new solar/wind with the firming, storage and transmission required for equivalent reliable supply. Show your sources and numbers.

Grok 的头像
Grok1 个月前

Claim not supported by CSIRO GenCost 2025-26 (July 2026). New black coal LCOE: 2025 $120-203/MWh, 2030 $113-191. Solar PV $52-88 then $29-76; onshore wind $78-129 then $64-107. Firmed RE (storage/transmission) system costs ~$81-91/MWh by 2030; 2050 $141-152 vs coal $107-182. Overlaps possible but not "much cheaper." Coal industry cites lower $50-70 via different assumptions.

Grant 的头像
Grant1 个月前

@EVCurveFuturist @grok....you didn't include Brownfield coal. What are you going to say after QLD determines it the least cost for Data centres?

Grok 的头像
Grok1 个月前

GenCost scopes only to new-build greenfield projects. Brownfield can reduce land, development and connection costs but is site-specific, so excluded for general comparability (AEMO holds some data). Existing coal SRMC is lower, yet large new data-centre loads still require added firm capacity as the fleet ages and retires. QLD has not determined coal least-cost. Under the fresh national rules states may seek AER/Commonwealth approval to use fossil only if they prove it cheaper and more reliable than firmed renewables—a high bar, not yet met.

Chris Meder 的头像
Chris Meder1 个月前

So essentially, in practical terms, QLD or the NT have zero chance of demonstrating that a new data-centre load can be supplied more cheaply by new coal or gas than by an appropriately designed combination of solar, wind and BESS. That’s not comparing renewables with the marginal operating cost of an existing coal plant. A new data centre creates a massive new load, so the relevant comparison is the cost of adding the generation, firming, network and connection capacity required to serve it reliably. On current Australian new-build economics, I’d expect firmed renewables to come in roughly 30–50% cheaper than an equivalent new-build coal or gas solution, with the advantage potentially larger at exceptional solar and wind locations. Which is actually a brilliant piece of policy design. The Federal Government doesn’t need to ban new fossil generation or endlessly argue about which technology is cheaper. It simply says: prove it. If QLD or the NT believes new coal or gas can beat firmed renewables on cost and reliability, take the numbers to the AER/Commonwealth and demonstrate it. In practical economic terms, they have zero chance. And that may be the most unequivocal way yet of demonstrating what Australia's least-cost new electricity system actually looks like.

Grok 的头像
Grok1 个月前

GenCost 2025-26 shows new-build solar and wind with storage as the lowest-cost pathway for additional capacity under net-zero goals, with system costs around $141-152/MWh by 2050. New coal sits at $107-182/MWh LCOE but raises economy-wide abatement costs. Site-specific brownfield or surplus existing plant could narrow gaps, yet the AER test for any fossil exemption still requires clear proof of lower bills and higher reliability than firmed renewables.

Chris Meder 的头像
Chris Meder1 个月前

Exactly. So taking GenCost 2025–26 and the new AER/Commonwealth test together, what is your best estimate of the probability that QLD or the NT could actually demonstrate that new-build coal or gas supplying a new data-centre load would deliver both lower costs and the required reliability compared with an appropriately designed solar + wind + BESS solution? Exclude the sunk-cost advantage of existing generators, because we're talking about the additional capacity required for a major new load. My contention is that, under that test and current new-build economics, the practical probability is effectively zero. If you disagree, give me your estimated probability and identify a plausible new coal or gas configuration that could pass the test.

Omniscope 的头像
Omniscope1 个月前

Water is also key. Closed circuits. Dissipation of heat (or use heat to warm buildings). Hot water not in nature (spray ponds).

Understanding 的头像
Understanding1 个月前

Abundant sun ☀️ energies could really benefit the growth potential there

Sonny 的头像
Sonny1 个月前

Sorry, but Chris Bowen is an ideological energy moron and some states will push back on this energy requirement. Those who do will get the data centre investment.

Chris Meder 的头像
Chris Meder1 个月前

Sorry, but you keep making claims like this with absolute certainty while the economics are moving rapidly in the opposite direction. I suspect you're going to end up with a lot of egg on your face by 2030. Let's come back then and see who was right.

Sonny 的头像
Sonny1 个月前

Also are we talking Chris Bowen energy economics 😂

C Keenan 的头像
C Keenan1 个月前

Build them smarter. Energy and funds are being frittered away.

David Digitalstratege 的头像
David Digitalstratege1 个月前

Germany already tried this. Mandate 100% renewables without grid backup and you get the highest electricity prices in the EU. Ask any German manufacturer.

Chris Meder 的头像
Chris Meder1 个月前

Germany does have high electricity prices, but you're conflating correlation with causation. Germany's own government attributes much of the industrial cost pressure to the post-Ukraine gas shock, elevated gas prices and grid costs. Gas frequently sets Germany's wholesale electricity price. And Germany hasn't actually “tried” the data-centre rule you're criticising yet. Its 100% renewable requirement for data centres has now been proposed for 2030. Australia isn't proposing renewables “without grid backup” either. It's explicitly renewables + firming. So you're arguing against a policy that isn't actually being proposed.

Concerned citizen. 的头像
Concerned citizen.1 个月前

Which makes us the only country on the planet that thinks you can run data centres, or any industrial economy, on renewables alone. Everybody else is building data centres that are using fossil fuels, nuclear and renewables. In that order.

Chris Meder 的头像
Chris Meder1 个月前

That’s simply not correct. Australia isn’t proposing to run data centres on intermittent renewables “alone”, the framework explicitly allows firming, including batteries and gas. And we’re hardly alone. China is targeting 80% renewable electricity for new data centres by 2030, Germany has legislated a 100% renewable electricity requirement for data centres, and Ireland now requires new data centres to meet at least 80% of annual demand from additional renewable projects, alongside generation/storage requirements. (TechRadar) Australia is part of an emerging trend, not some isolated experiment. I expect others will follow as AI electricity demand grows. The question increasingly isn't whether data centres need vast amounts of power, but how we make that demand bring new generation with it.

Concerned citizen. 的头像
Concerned citizen.1 个月前

Firstly, renewables always need 'firming', so saying renewables without including the firming part is lying. That is why saying renewables are the cheapest form of power is a lie. That is why trying to run a data centre on renewables is a joke. That is why no one is doing it.

Toumaz Baranski 的头像
Toumaz Baranski1 个月前

If that standard survives contact with the connection agreement, it changes the job. A data centre cannot just buy a certificate and call it clean. It needs firm import, backup dispatch, UPS, metering, protection settings and a load schedule the network can actually see.

Chris Meder 的头像
Chris Meder1 个月前

Exactly. That’s where this gets really interesting. If the additionality requirement survives into the final connection rules, “100% renewable” stops being a certificate exercise and becomes an infrastructure obligation. The data centre effectively has to arrive with a credible energy plan: new generation, firming, storage/UPS, network capacity and controllable load. That could drive a lot of investment well beyond the data centre itself.

Toumaz Baranski 的头像
Toumaz Baranski1 个月前

That is the real line. Additionality has to appear in the connection offer, not just the brochure: firm capacity, curtailment rules, backup dispatch, metering boundaries and who pays when the schedule misses. Otherwise 100% renewable is still a certificate label.

Greg McGarvie 的头像
Greg McGarvie1 个月前

Tasmania an ideal site for data centres green power, water and cool!

Andrew Chapman 的头像
Andrew Chapman1 个月前

firmed by gas means not "100% renewable energy supply" though, right? it is fascinating to watch the penny dropping for more people on how our energy system works, now we have datacentres serving as a cut-down model. Datacentres have service agreements requiring ~100% uptime, so they cannot run on RE alone. Even a staggeringly uneconomic overbuild of solar+wind with BESS can only lower the likelihood of downtime, not guarantee it.

True Science PEng, DFP, ADFS, MA, MBA. 的头像
True Science PEng, DFP, ADFS, MA, MBA.1 个月前

The real threat.

Chris Meder 的头像
Chris Meder1 个月前

I see the disruption risk too, but I think “40% of Aussie jobs gone in seven years = economic collapse” jumps from a real issue to a very specific worst-case scenario. AI will destroy and reshape jobs, but it will also create new industries, investment and enormous productivity gains. The real threat is failing to manage that transition and distribute those gains broadly.

True Science PEng, DFP, ADFS, MA, MBA. 的头像
True Science PEng, DFP, ADFS, MA, MBA.1 个月前

Risk estimates.

Chris Meder 的头像
Chris Meder1 个月前

No doubt. I'd go further and say all jobs by 2035.

beisbolrulez 的头像
beisbolrulez1 个月前

Anyone who doesn't realize that AI should be powered by Gen IV nuclear is a damn fool.

Sonny 的头像
Sonny1 个月前

The wheel are already falling off Bowen’s energy stupidity.

Ian Davies 的头像
Ian Davies1 个月前

Is it only NEM, so WA & NT not covered? Both are fantastic for solar & gas. If only SunCable project brought forward to supply PV electricity to Darwin first before undersea cable laid. Saudi Arabia is sounding like best option for DCs. Or China.

Chris Meder 的头像
Chris Meder1 个月前

It’s actually national, not just the NEM. Bowen clarified yesterday that the Commonwealth legislation will cover every state and territory, including WA and the NT. The NT has a separate grid, but Bowen explicitly said it's still covered by the national law. And I agree on the opportunity. WA and the NT have extraordinary solar resources, and gas can still be used for firming under the proposed framework. Something like SunCable supplying Darwin and major new data-centre loads is exactly the sort of combination that could get very interesting.

IR5 Iconoclast 🇦🇺 🇵🇱 的头像
IR5 Iconoclast 🇦🇺 🇵🇱1 个月前

As long as its not wind farms...

Sonny 的头像
Sonny1 个月前

This is a joke because datacentres won't run on intermittent energy and will be mostly running gas. States will split enemgy policy on this issue.

Mr B 的头像
Mr B1 个月前

This country gets DUMBER by the day 🤦‍♂️🤦‍♂️ Qld is the winner and will get them all with Crisafulli giving a big FUCK YOU to Albo and Bowen

Dennis Falgout 的头像
Dennis Falgout1 个月前

The cost that wind and solar plus the backup fossil fuel powered generators or the batteries needed will make AI uneconomic.

Eros Ferreto 🏳️‍🌈 的头像
Eros Ferreto 🏳️‍🌈1 个月前

This project looks like a map in Battlefield 2045. Good luck to Australia, anyway. I think it could be a competitive market.

🔴ichse 的头像
🔴ichse1 个月前

Ok, I like that you love to buy Siemens gas turbines, but how is that renewable? Or is that just allowed for backup?

o2andn2 的头像
o2andn21 个月前

That should dumb down Australia substantially

Shane 的头像
Shane1 个月前

Data centers will be in space before Albo gets any built under his retarded rules. These old, overpaid boomers need to just piss off retire and let more competent people run this country. We should be begging Elon for a launch site in Australia because he'll inevitably get push back in the US over his plans. He might get Terra FAB but there will be push back on the launch site, perfect way for us to step in and solve problems but we wont.

Nigel Hungerford-Symes 的头像
Nigel Hungerford-Symes1 个月前

Would be wonderful if we could be like most other modern economies and leverage Nuclear for such a large build out...if there is a terrestrial build out. I suspect @SpaceXAI are going to scale their satellite solution before even half of these projects get approval.

mark squire #FBPE 的头像
mark squire #FBPE1 个月前

This is the way.

David Blain 🇨🇦🗳🇨🇦 的头像
David Blain 🇨🇦🗳🇨🇦1 个月前

@ABDanielleSmith there is a better way to generate electricity for data centres. Renewables, batteries and peaking plants. Reduce emissions, save water and build the next generation of power.

Erneuerb🅰️re 🇪🇺 😷 的头像
Erneuerb🅰️re 🇪🇺 😷1 个月前

@schneidercar

Interested Citizen 的头像
Interested Citizen1 个月前

👀👀

DXM 的头像
DXM1 个月前

@ProfRayWills IDK. I’m mad for renewables like the best of them, but these are two different business models and thus investors. Feels like it’ll handbrake AI investment, which would be a poor outcome for Australia

Cam Leafe 的头像
Cam Leafe1 个月前

Oh cool, so Australia will miss out on high-tech CapEx again because we are ruled by the most embarrassing ideological mediocrities ever coughed forth from the bowels of student politics.

相关视频

In the next 15 years, data centers are expected to add an additional $160 billion to grid costs in the US Estimate say electricity rates for average households will spike by as much as 70% Data centers are projected to triple their share of US electricity demand in the next few years The main driver is the explosive growth of data centers built by Big Tech companies like Amazon, Meta, Microsoft, Google, OpenAI and more to power artificial intelligence Places like Northern Virginia already has over 200 data centers with massive new ones planned. Utilities are striking secret proprietary deals with Big Tech companies. These are hidden behind NDAs that shift much of the infrastructure costs onto regular residential customers Just in the PJM energy market of 13 states covering 65 million people, data centers were responsible for 63% of last year’s record 800% spike in capacity prices (This is INSANE) Residential customers in places like Virginia and Louisiana are being forced to subsidize billions in new power plants and grid upgrades for data centers. An Examples of this is in Louisiana, Meta’s data center deal leaves the public potentially on the hook for half or more of a $3–4 billion power plant Again, without major policy changes, average household electricity bills could rise by up to 70% over the next 15 years due to data center demand. There is only one real way we can stop this, we must create a separate customer class for data centers Maryland and Oregon have already passed laws doing this Forces data centers to pay for the specific infrastructure they need instead of spreading the costs to everyone else. More states need to do the same Ban secret sweetheart deals Require full public disclosure of all contracts between utilities and Big Tech Prohibit deals where data centers pay below the actual cost of service Make data centers pay the full cost of new power plants and grid upgrades Change regulations so utilities cannot socialize the cost of data-center-driven infrastructure to residential and small business ratepayers This needs to be done immediately

Wall Street Apes

58,149 次观看 • 4 个月前

This week, we have had a lot of discussions around artificial intelligence, inspired by the Global AI Summit in Kigali, Rwanda. Many African countries are doing great things to motivate young people to take advantage of AI because it represents the future in problem solving. Unfortunately, Zimbabwe’s ICT Minister Tatenda Mavetera and her permanent secretary did not attend, showing how these things are not taken seriously by our government. Zimbabwe’s richest man, Strive Masiyiwa, who has not been to Zimbabwe for decades, made it clear at the summit, which he co-chaired, that investment will not go where the environment is not conducive. Our government talks about anything topical without delivering anything meaningful—they are doing the same with AI. The majority of schools have no computers. Zimbabweans receive electricity for only four hours a day. As the Under-Secretary-General and Executive Secretary of the United Nations Economic Commission for Africa, Claver Gatete, explains, a country needs electricity for AI data centres to work. Yet only 600 million out of 1.5 billion people in Africa have access to electricity, not even energy. Yet energy is an integral part of AI development. Energy is an essential component for the successful development and implementation of AI in a country because AI systems require massive amounts of data to function effectively. This data must be stored and processed in data centres and servers, which depend on electricity to power both the hardware and the cooling systems. You cannot achieve this in a country that delivers only four hours of electricity a day to its citizens like Zimbabwe. AI applications require continuous and uninterrupted access to data and computing resources to deliver accurate and timely results. Electricity is also crucial for powering research institutions, universities, and Research and Development centres that drive AI advancement. Without reliable access to electricity, these institutions will struggle to conduct research, develop new algorithms, or train AI models. The tragedy of Zimbabwe is that the Vice-President of Google responsible for AI, Dr James Manyika, is Zimbabwean; one of the key presenters at the summit, Prof Arthur Mutambara, who has just released a book on AI, is Zimbabwean; Strive Masiyiwa, who has partnered with Nvidia to bring supercomputer technology to the continent by building Africa’s first artificial intelligence factory in South Africa with data centres in Kenya and Egypt, is Zimbabwean. Yet, none of them are working in or with Zimbabwe. Our political leaders have let us down on all these fronts, yet they keep yapping about AI when there is nothing on the ground! Instead of slogans and dancing at rallies, they should see how other countries are doing it. A country that doesn’t focus on technology for development will be a dusty village in 25 years, and its people will not be able to compete at all, rendering it just a dot on the global map. Too much political yada yada without anything delivered, and with people like Tatenda Mavetera, who forge qualifications, in the driving seat, Zimbabwe’s fortunes will continue to dwindle! Add to that the historic looting of public funds meant for building power plants to give us electricity, future generations will curse on our graves!

Hopewell Chin’ono

33,685 次观看 • 1 年前