Kagadi RDC Refuses to Commission New District Offices Over Missing Documents The Kagadi RDC declined to commission the new district offices, citing a lack of the required documents (Bill of Quantities) “If anything happens in the future, I will be among those arrested. I’m sorry, I cannot commission this...

66,870 次观看 • 2 个月前 •via X (Twitter)

34 条评论

PKMasuba 的头像
PKMasuba2 个月前

And you find people still attacking balam. We need this kind of accountability from everyone

Architect Ndungu Ekiyakunzire 的头像
Architect Ndungu Ekiyakunzire2 个月前

A building is commissioned to systematically verify & document that all of its systems lk HVAC, electrical, plumbing, life safety are installed, tested, performing according to the owner's operational needs. It bridges the gap between the blueprint design & real-world performance

Hon. Arnold Ankunda 的头像
Hon. Arnold Ankunda2 个月前

Thank you Snr Architect Nobert Ndungu👏

Simon Peter Wafula 的头像
Simon Peter Wafula2 个月前

Government should avoid cash transactions in its procurement processes let everything go electronically No forgery of receipts and suppliers audited when filling returns and taxed

Gabigogo 🇺🇬 的头像
Gabigogo 🇺🇬2 个月前

Slowly by slowly we will liberate the country.

Amon Amani 的头像
Amon Amani2 个月前

Thank you @BalaamBarugahar and @JustineNameere . All this is because of your efforts. Such discipline had never happened before. Mzee should have made U Prime Minister.

@@SIMBA🦁🦁 的头像
@@SIMBA🦁🦁2 个月前

Ekomera lyobukadde nga limenya she's right

Muhangi Enock Murungi 的头像
Muhangi Enock Murungi2 个月前

Why does she want the bills of quantities ??! Is she a quantity surveyor ?! Hehehehe ,in some video Balaam claimed some pavers being less than 50sqmtrs, then measured 17x13m but 4got to tabulate those measurements...these politicians don't know anything about technical

Perseverer001 的头像
Perseverer0012 个月前

I thought she had to ask for documents days before the commission day. So kati yabadde azze kola ki?

Edward 的头像
Edward2 个月前

This is something that every leader should be doing, Even our corrupt Mps should hit the ground and roast the contractors they recommended to be awarded projects

Bonny Olobo 的头像
Bonny Olobo2 个月前

From the clip, I didn't hear anywhere where she pointed specifically BoQ. She want to look into documents relating to that project. Is that too much to ask? Why run under the technicalities if you did your work right? It would be your time to walk the lady thru' with ease!

Roosevelt 的头像
Roosevelt2 个月前

Wisdom has started coming 🤣🤣🤣🤣🤣🤣🤣

Patrick Rickie ENIGMA 的头像
Patrick Rickie ENIGMA2 个月前

Hahaha balam has taught many literates how to do what they already know

Blaize Junix 的头像
Blaize Junix2 个月前

Good job

Eng . Feezaman of Uganda 🇺🇬 的头像
Eng . Feezaman of Uganda 🇺🇬1 个月前

She was right. They were supposed to give her As built drawings and a simple brief of the scope with respective costs. Wrong is wrong. Let’s put our country and construction in order. When such simple documents are not ready then wait 😳

Moses Kamya 的头像
Moses Kamya2 个月前

Bravo... The time for plundering of public resources is narrowing

balojja@td 的头像
balojja@td2 个月前

Thank you Balam for awakening leaders on how to handle kisanja no sleep

@DJKATRANKS 的头像
@DJKATRANKS2 个月前

She's smart

Dr.Muhangi 的头像
Dr.Muhangi1 个月前

I like that. Thank you

Peter Kintu 的头像
Peter Kintu2 个月前

The Balaam effect is biting everywhere!

Gabriel Senior 的头像
Gabriel Senior2 个月前

Balam oyeeee

Judith  Acayo 的头像
Judith Acayo2 个月前

Uganda Empya etandise

Sir.Mugumya🇺🇬 的头像
Sir.Mugumya🇺🇬2 个月前

Gold gesture

Two S UG🇺🇬 的头像
Two S UG🇺🇬1 个月前

People are waking up serious. Accountability should be put on the table to a void future arrests when Balaam comes there 😂

Mufuluma Lazeri 的头像
Mufuluma Lazeri2 个月前

She was legit.

SUVIA👉 K 的头像
SUVIA👉 K2 个月前

@BalaamBarugahar has caused an alarm every where 😄 Ministry towumura 👍 👌

Obba Jerry 的头像
Obba Jerry2 个月前

The BALAAM effect.

Dismas Gavana 的头像
Dismas Gavana2 个月前

In kalungu they build a district building at a cost of 2B hardly one year the building has cracks, it cemented instead of tarazo kare u cant imagine

Architect Ndungu Ekiyakunzire 的头像
Architect Ndungu Ekiyakunzire2 个月前

Operational Handover: It includes specific line items for required manufacturer warranties, operation manuals, and facility staff training sessions.

MMRicky 的头像
MMRicky1 个月前

Thank RDC, that is the spirit. When I was head of Department in Army I refused to receive equipment because I asked for the brochures to confirm with earlier submitted technical specifications and they could not avail them to me.

Ochieng Samuel 的头像
Ochieng Samuel1 个月前

The best decision

Mugume 的头像
Mugume2 个月前

This is how it should be done

Kakuru Abel 的头像
Kakuru Abel2 个月前

Thats good kisanja no sleep

Yusufu k 的头像
Yusufu k2 个月前

Ensonga ya Balaam ne accountability, buli muntu is protecting his name..

相关视频