Morgan Stanley’s Stephen Byrd full interview on CNBC: Power is the largest bottleneck, more than chips. “Over the summer, the tech community reached out to all the U.S. time-to-power solution providers and said whatever power you have in ‘27 & ‘28, we will take it.” $CIFR $WULF $HUT $GLXY...

46,098 Aufrufe • vor 8 Tagen •via X (Twitter)

27 Kommentare

Profilbild von matthew sigel, recovering CFA
matthew sigel, recovering CFAvor 8 Tagen

I don't think thats accurate. Plenty of 2H28 megawatts which havent been leased. Average length from lease signing to energization is ~13 months so still a bit early for 2H28 leases.

Profilbild von Small Cap Snipa
Small Cap Snipavor 8 Tagen

Very fair. I’d love to see a VanEck PSP report. 👀

Profilbild von Bit Whitman
Bit Whitmanvor 8 Tagen

@matthew_sigel @matthew_sigel do I take it that $IREN's 2.3GW energized equal to roughly 10–15% of an entire year of additional supply based on your numbers?

Profilbild von matthew sigel, recovering CFA
matthew sigel, recovering CFAvor 8 Tagen

@SmallCapSnipa No. On actual usable DC capacity coming online, more like 2–3%. The 2.3GW is energized power, not finished DC capacity. Still very meaningful though.

Profilbild von Bit Whitman
Bit Whitmanvor 8 Tagen

Got it that makes sense. I was reading the research and got it mixed. In your base case what conversion rate do you assume from energized power to finished DC capacity, and what value per uncontracted MW? The gap between 2.3GW energized and what's actually built seems like the part the market isn't paying for.

Profilbild von matthew sigel, recovering CFA
matthew sigel, recovering CFAvor 8 Tagen

We don’t really assume a fixed conversion rate. It's clear that energized power is the scarce upstream asset as only ~2% of the U.S. data center power pipeline actually reached commercial operation last year, and median interconnection time is now ~5 years. Once you have the power, though, it still takes a lot of capital and 12-18 months to turn it into finished DC capacity (maybe faster for IREN given the existing infra). IREN have a huge amount of energized power relative to what’s actually built, so their bottleneck is capital + execution, now power. So I’m not dismissing the value of their secured power. If the demand and the financing keeps showing up, they’re in a very good spot. As for the value, our work suggests the market is paying almost nothing for uncontracted DC capacity today. For the powered-shell names, current leases suggest roughly $15-20M of value creation per MW once capacity is leased. For neoclouds like IREN it’s harder to put a clean $/MW on the uncontracted pipeline because they have much larger financing needs and generally shorter-duration customer contracts.

Profilbild von matthew sigel, recovering CFA
matthew sigel, recovering CFAvor 8 Tagen

@SmallCapSnipa Meant to write *not power instead of *now power

Profilbild von BitcoinAIGuy
BitcoinAIGuyvor 8 Tagen

FEW

Profilbild von keelmonger
keelmongervor 8 Tagen

This is a national emergency in my opinion $KEEL 😂

Profilbild von Small Cap Snipa
Small Cap Snipavor 8 Tagen

It sure is. If we don’t figure out the power shortfall, then the pace of adoption and improvement will not happen the way we want it to.

Profilbild von bc8Sooners
bc8Soonersvor 8 Tagen

Sounds like IREN's Canada, Spain and Australia sites are undervalued.

Profilbild von Small Cap Snipa
Small Cap Snipavor 8 Tagen

Especially Aussie

Profilbild von Zeek | Insights 📊
Zeek | Insights 📊vor 8 Tagen

Shorter than we thought 😶

Profilbild von Small Cap Snipa
Small Cap Snipavor 8 Tagen

I don’t think anyone could have imagined this nor prepared for it

Profilbild von Zeek | Insights 📊
Zeek | Insights 📊vor 8 Tagen

Crazy how this is the beginning stages of AI.

Profilbild von Black Panther Capital
Black Panther Capitalvor 8 Tagen

I so much agree and been saying this for a while. No AI without POWER.

Profilbild von BTC ⚡️ USD Strategy
BTC ⚡️ USD Strategyvor 8 Tagen

@grok pros and cons for $CIFR ?

Profilbild von Garett Senez
Garett Senezvor 8 Tagen

$APLD

Profilbild von T.E.Lawrence
T.E.Lawrencevor 8 Tagen

Sounds like Byrd @MorganStanley is talking about $IREN even though he doesn't cover it! @Agrippa_Inv @CNBC

Profilbild von UNREAL
UNREALvor 8 Tagen

My evolving thesis is that the bottleneck has not fully shifted to power and that power pricing continues to improve through 2027 as the scarcity fully prices in. Recall Elon said 2027 is the lower bottleneck - think he is right. Corollary to the thesis is that many major projects will face delays further shifting the pricing power as desperation/FOMO peak Expect a few things: 1) colocation rates continue to improve into the 3M/MW regime 2) Neocloud GPU rates continue to improve towards 50M/MW (1yr) 3) Premiums will be paid for large sites with ready power and fiber connectivity

Profilbild von Philip Raymond Caldwell
Philip Raymond Caldwellvor 8 Tagen

Good read, thanks. Your breakdown is practical and easy to grasp. You and @JasonKMiller_ stand out.

Profilbild von Arch_Angel
Arch_Angelvor 8 Tagen

BE

Profilbild von T.E.Lawrence
T.E.Lawrencevor 8 Tagen

@CNBC @stephenbyrd doesnt cover @IREN_Ltd How can Byrd put out a 50-page note without covering $IREN ??? Absurd!

Profilbild von Small Cap Snipa
Small Cap Snipavor 8 Tagen

@CNBC @stephenbyrd @IREN_Ltd Yeah it’s odd. I never see $IREN coverage from MS. Only critique have because the research is fantastic.

Profilbild von T.E.Lawrence
T.E.Lawrencevor 8 Tagen

@MorganStanley - still pissy at @IREN_Ltd ? @stephenbyrd needs to grow up.

Profilbild von Ryan
Ryanvor 8 Tagen

@WC25B Gpus stock!

Profilbild von RiskOn24x7
RiskOn24x7vor 8 Tagen

Nvidia will still sell chips to get the most out of existing infrastructure.