Morgan Stanley’s Stephen Byrd full interview on CNBC: Power is the largest bottleneck, more than chips. “Over the summer, the tech community reached out to all the U.S. time-to-power solution providers and said whatever power you have in ‘27 & ‘28, we will take it.” $CIFR $WULF $HUT $GLXY...

46,098 次观看 • 8 天前 •via X (Twitter)

27 条评论

matthew sigel, recovering CFA 的头像
matthew sigel, recovering CFA8 天前

I don't think thats accurate. Plenty of 2H28 megawatts which havent been leased. Average length from lease signing to energization is ~13 months so still a bit early for 2H28 leases.

Small Cap Snipa 的头像
Small Cap Snipa8 天前

Very fair. I’d love to see a VanEck PSP report. 👀

Bit Whitman 的头像
Bit Whitman8 天前

@matthew_sigel @matthew_sigel do I take it that $IREN's 2.3GW energized equal to roughly 10–15% of an entire year of additional supply based on your numbers?

matthew sigel, recovering CFA 的头像
matthew sigel, recovering CFA8 天前

@SmallCapSnipa No. On actual usable DC capacity coming online, more like 2–3%. The 2.3GW is energized power, not finished DC capacity. Still very meaningful though.

Bit Whitman 的头像
Bit Whitman8 天前

Got it that makes sense. I was reading the research and got it mixed. In your base case what conversion rate do you assume from energized power to finished DC capacity, and what value per uncontracted MW? The gap between 2.3GW energized and what's actually built seems like the part the market isn't paying for.

matthew sigel, recovering CFA 的头像
matthew sigel, recovering CFA8 天前

We don’t really assume a fixed conversion rate. It's clear that energized power is the scarce upstream asset as only ~2% of the U.S. data center power pipeline actually reached commercial operation last year, and median interconnection time is now ~5 years. Once you have the power, though, it still takes a lot of capital and 12-18 months to turn it into finished DC capacity (maybe faster for IREN given the existing infra). IREN have a huge amount of energized power relative to what’s actually built, so their bottleneck is capital + execution, now power. So I’m not dismissing the value of their secured power. If the demand and the financing keeps showing up, they’re in a very good spot. As for the value, our work suggests the market is paying almost nothing for uncontracted DC capacity today. For the powered-shell names, current leases suggest roughly $15-20M of value creation per MW once capacity is leased. For neoclouds like IREN it’s harder to put a clean $/MW on the uncontracted pipeline because they have much larger financing needs and generally shorter-duration customer contracts.

matthew sigel, recovering CFA 的头像
matthew sigel, recovering CFA8 天前

@SmallCapSnipa Meant to write *not power instead of *now power

BitcoinAIGuy 的头像
BitcoinAIGuy8 天前

FEW

keelmonger 的头像
keelmonger8 天前

This is a national emergency in my opinion $KEEL 😂

Small Cap Snipa 的头像
Small Cap Snipa8 天前

It sure is. If we don’t figure out the power shortfall, then the pace of adoption and improvement will not happen the way we want it to.

bc8Sooners 的头像
bc8Sooners8 天前

Sounds like IREN's Canada, Spain and Australia sites are undervalued.

Small Cap Snipa 的头像
Small Cap Snipa8 天前

Especially Aussie

Zeek | Insights 📊 的头像
Zeek | Insights 📊8 天前

Shorter than we thought 😶

Small Cap Snipa 的头像
Small Cap Snipa8 天前

I don’t think anyone could have imagined this nor prepared for it

Zeek | Insights 📊 的头像
Zeek | Insights 📊8 天前

Crazy how this is the beginning stages of AI.

Black Panther Capital 的头像
Black Panther Capital8 天前

I so much agree and been saying this for a while. No AI without POWER.

BTC ⚡️ USD Strategy 的头像
BTC ⚡️ USD Strategy8 天前

@grok pros and cons for $CIFR ?

Garett Senez 的头像
Garett Senez7 天前

$APLD

T.E.Lawrence 的头像
T.E.Lawrence8 天前

Sounds like Byrd @MorganStanley is talking about $IREN even though he doesn't cover it! @Agrippa_Inv @CNBC

UNREAL 的头像
UNREAL8 天前

My evolving thesis is that the bottleneck has not fully shifted to power and that power pricing continues to improve through 2027 as the scarcity fully prices in. Recall Elon said 2027 is the lower bottleneck - think he is right. Corollary to the thesis is that many major projects will face delays further shifting the pricing power as desperation/FOMO peak Expect a few things: 1) colocation rates continue to improve into the 3M/MW regime 2) Neocloud GPU rates continue to improve towards 50M/MW (1yr) 3) Premiums will be paid for large sites with ready power and fiber connectivity

Philip Raymond Caldwell 的头像
Philip Raymond Caldwell8 天前

Good read, thanks. Your breakdown is practical and easy to grasp. You and @JasonKMiller_ stand out.

Arch_Angel 的头像
Arch_Angel8 天前

BE

T.E.Lawrence 的头像
T.E.Lawrence8 天前

@CNBC @stephenbyrd doesnt cover @IREN_Ltd How can Byrd put out a 50-page note without covering $IREN ??? Absurd!

Small Cap Snipa 的头像
Small Cap Snipa8 天前

@CNBC @stephenbyrd @IREN_Ltd Yeah it’s odd. I never see $IREN coverage from MS. Only critique have because the research is fantastic.

T.E.Lawrence 的头像
T.E.Lawrence8 天前

@MorganStanley - still pissy at @IREN_Ltd ? @stephenbyrd needs to grow up.

Ryan 的头像
Ryan8 天前

@WC25B Gpus stock!

RiskOn24x7 的头像
RiskOn24x78 天前

Nvidia will still sell chips to get the most out of existing infrastructure.