正在加载视频...

视频加载失败

My second interview with Isaiah Taylor (Isaiah Taylor - making nuclear reactors) founder of Valar Atomics Valar Atomics wants to make the world’s energy with mass-manufactured nuclear reactors. They just built their thermal prototype in record time, from first hire to operations in only 10 months. Now, they’re working...

26,214 次观看 • 1 年前 •via X (Twitter)

8 条评论

Ti Morse 的头像
Ti Morse1 年前

Youtube:

Range ETFs 的头像
Range ETFs1 年前

Nuclear innovation is surging. $NUKZ focuses on companies engaged in cutting-edge nuclear reactor technology, designed to provide investors exposure to the forefront of a cleaner energy landscape. Consider investing in the potential growth of nuclear energy.

Molly O’Shea 的头像
Molly O’Shea1 年前

@isaiah_p_taylor edit is so clean

Turner Novak 🍌🧢 的头像
Turner Novak 🍌🧢1 年前

@isaiah_p_taylor Can we please get a Studio Ghibli filter on the third interview?

Emmet Halm 的头像
Emmet Halm1 年前

@isaiah_p_taylor Awesome interview, but where's the @drink_AG1 promo?

Ti Morse 的头像
Ti Morse1 年前

@isaiah_p_taylor @drink_AG1 @bryan_johnson doesn't approve of AG1

Brad Barbin 的头像
Brad Barbin1 年前

@isaiah_p_taylor 😂 i can't wait to use this line! "if you want an ERP you have three options: Russia, China, or Carbon"

Dhiraj Wohra (Dk) 的头像
Dhiraj Wohra (Dk)1 年前

@isaiah_p_taylor Amazing stuff both if you.. thanks.. 🫡🫡.. I loved the details around SiC.. on a lighter note SiC is used in power semiconductors for the same reason..

相关视频

BREAKING | The American Atomic Age: Valar Atomics, Fuse, Not Boring Isaiah Taylor (Valar Atomics), JC Btaiche (Fuse), & Packy McCormick (Not Boring) dive into how nuclear energy - fission & fusion - is at the heart of America's industrial resurgence & the race for AI dominance. Bonus: Packy covers The Great Differentiation Highlights: (00:00) The American Atomic Age (01:15) Isaiah Taylor on U.S. nuclear industry (03:34) Why modular reactors are the key to scale (06:47) China’s nuclear lead (08:32) Valar’s path to criticality & DOE testing (11:06) Foreign funding & misinformation campaigns (13:01) Nuclear myths: “It wouldn’t fill an Olympic pool” (15:29) Why Gen IV reactors are meltdown-proof (17:29) AI as a tailwind for nuclear infrastructure (19:21) Misconceptions in nuclear & energy performance (21:13) Pressure to deliver in this presidency term (22:59) The future of global energy (24:26) JC Btaiche: Building the world’s highest-power pulse system (26:41) Fuse’s strategy: revenue today, power tomorrow (28:34) Fusion’s role in reindustrialization (33:12) The AI-power constraint: “Energy = Intelligence” (35:31) Can we catch up to China in energy? (38:13) Packy McCormick on vertical integration (41:11) The Great Differentiation: Why brand matters in the age of AI This conversation is part of Sourcery’s “Made in America” Mini-Series recorded at REINDUSTRIALIZE SUMMIT 2025 Isaiah Taylor - making nuclear reactors | JC B | Packy McCormick

Molly O’Shea

122,324 次观看 • 11 个月前

We’ve gone critical. At 12:20 am on July 4th, Aalo sustained a controlled fission chain reaction for the first time. We have officially surpassed the goal of President Trump’s Executive Order 14301, achieving 4 advanced nuclear reactor criticalities by America’s 250th birthday. This is a zero-power criticality to validate our supply chain, reactor physics and control systems for our 10 MWe full-powered reactor, the Aalo-X, targeting power operations next year. Everything was built at full scale: fuel, moderator, control systems, etc., so we understand system performance at its commercial scope. That also meant tackling four of the most difficult things in nuclear with this criticality milestone: ✅ Ground-up construction of our reactor facility ✅ Manufacturing the reactor in our factory and shipping them by road ✅ Assembling our own fuel assemblies using commercial UO2 ✅ Standing up training, safety, and operational programs to become our own nuclear operator I am proud to say we have accomplished all four goals, along with achieving criticality. The reactor building was constructed in 36 days and construction to criticality was achieved in under 8 months. That’s the fastest nuclear build in the last 80 years. A massive congratulations to the Aalo Atomics team and our partners. Many thanks to Idaho National Laboratory, the DOE-Idaho Operations Office, and the Office of Nuclear Energy for their immense support in enabling this milestone and dedicated to the American nuclear resurgence.

Yasir Arafat

99,083 次观看 • 20 天前

Google inks historic US deal to buy Gen IV nuclear power for data centers | Neetika Walter Kairos Power’s Hermes 2 reactor will deliver 50 MW of carbon-free power by 2030, with TVA channeling the energy to Google’s data centers. Google has announced the first power purchase agreement (PPA) between a U.S. utility and an advanced nuclear developer. Through the deal, the Tennessee Valley Authority (TVA) will buy electricity from Kairos Power’s Hermes 2 demonstration plant in Oak Ridge, Tennessee. The 50-megawatt reactor is expected to begin operations in 2030, sending power to TVA’s grid and supporting Google’s data centers in Tennessee and Alabama. One-of-a-kind milestone This marks the first time a U.S. utility has committed to purchasing electricity from a Generation IV nuclear plant. For Google, it represents an early step in a longer-term collaboration with Kairos Power to unlock as much as 500 megawatts of nuclear capacity over the next decade. The Hermes 2 project also carries symbolic weight, reviving Oak Ridge’s historic role as a hub for nuclear innovation. Google has steadily expanded its presence in the Tennessee Valley over the past decade and has worked closely with TVA to add clean energy to the region. With artificial intelligence workloads and cloud services driving demand for reliable electricity, the company is now betting on advanced nuclear as part of its strategy to secure 24/7 carbon-free energy. The U.S. grid is under growing strain as AI, electrification, and population growth push power demand to new highs. Traditional sources of clean power, such as wind and solar, cannot always deliver around the clock, while large nuclear plants face long timelines and high costs. Small and modular nuclear reactors offer a potential solution, providing carbon-free capacity with more flexibility. Trump push gives nuclear fresh momentum The move comes as the Trump administration has accelerated support for advanced nuclear. In May, the White House signed executive orders to streamline licensing for micro-reactors and small modular reactors, to triple or even quadruple U.S. nuclear output by mid-century. Federal agencies have also launched pilot projects to test more than a dozen small reactors, many on federal land to avoid permitting delays. These steps have helped renew investor interest in nuclear technology and created room for private-sector deals like Google’s. Energy startups such as Oklo have seen their shares climb after securing government partnerships, underscoring the link between policy reform and commercial appetite. Google’s nuclear partnership reflects this broader momentum. The deal highlights how next-generation technologies can find a pathway to market by combining utility-scale, regulatory support, and private-sector demand. For Oak Ridge, the project could deliver economic benefits alongside energy breakthroughs. Kairos Power plans to train a new generation of nuclear workers in partnership with the University of Tennessee and other institutions. The Hermes 2 plant will also anchor efforts to re-establish the city as a center of nuclear innovation. In signing on to the project, Google is not only securing clean power for its data centers but also helping to push advanced nuclear toward commercial reality. Read more:

Owen Gregorian

31,255 次观看 • 11 个月前

My first interview with Scott Nolan, Co-Founder and CEO of General Matter. 0:48 What if Russia stopped selling uranium to the US 4:47 The history of uranium enrichment 10:44 What if he was given $25 billion to turn on reactors as fast as possible 13:37 The US doesn’t have the capability to make fuel for Small Modular Reactors today 14:43 How Founders Fund decides to start companies 19:28 Why you shouldn’t start a company 26:02 Working at SpaceX in 2003 28:10 How Elon drove urgency in the early days of SpaceX 30:28 How it felt when the first three Falcon launches failed 32:41 Figuring out what to work on after leaving SpaceX 34:26 How Peter Thiel convinced him to join Founders Fund 38:53 The most unintuitive thing he learned from Peter Thiel 44:03 Lowering the cost of uranium enrichment 47:32 The idiot index for enrichment 50:18 Vertically integrating vs using existing supply chains 53:44 The idiot index for timelines 59:13 Taking risk to pull in schedule: current burn vs future revenue 1:02:44 Choosing where to put their first enrichment facility 1:05:42 Maintaining maniacal urgency with multi-decade timelines 1:09:10 How a war with China will impact our ability to produce energy 1:14:06 What conventional wisdom gets wrong about building this type of company 1:17:48 The AI data center boom requires nuclear 1:21:02 Why SpaceX switched from an ablative engine to a regeneratively cooled all metal engine 1:25:08 How Elon makes nonobvious decisions 1:29:59 Don’t focus on problems that are already getting solved

Ti Morse

28,058 次观看 • 4 个月前