Loading video...

Video Failed to Load

Go Home

Patna Metro achieves another major milestone! 🚇 9th TBM breakthrough has completed the 5.2 km underground tunnelling (up line) from Moin-ul-Haq Metro Station to Patna Junction Metro Station. It also marks the final breakthrough of TBM-1 on this stretch. Another big step towards a faster, safer and better-connected Patna. 🇮🇳

101,761 views • 14 days ago •via X (Twitter)

0 Comments

No comments available

Comments from the original post will appear here

Related Videos

Your Local Metro Hub: Poisar Metro Station | Metro Line 7 | Red Line Your neighbourhood. Your Metro. Your gateway to Mumbai. Located along the Western Express Highway in Kandivali East, Poisar Metro Station connects residential neighbourhoods including Thakur Complex, Poisar, Ashok Nagar and surrounding communities with faster, more affordable and reliable Metro travel. Kandivali Railway Station is also within easy reach. From daily commutes to work and school to hospital visits and everyday errands, the station makes travelling across the city simpler and more convenient. Important destinations in the surrounding area include Mahindra & Mahindra, the Central Ordnance Depot, ESIS Hospital and the Lokhandwala Complex. Positioned on one of Mumbai's busiest north–south corridors, Poisar offers commuters a dependable alternative to road traffic, making journeys towards Goregaon, Andheri, Borivali, Dahisar and beyond quicker and more predictable. As part of Metro Line 7, Poisar links commuters to Mumbai's expanding Metro network, with interchange connectivity to Metro Line 1 at Gundavali and Metro Line 2A at Dahisar East, along with onward connectivity towards Mira Road through Metro Line 9. Whether it's heading to work, reaching essential services or travelling across the city, Poisar Metro Station makes every journey easier, faster and more connected. Poisar Metro Station isn't just another stop on the route. It's where better connectivity begins for thousands of commuters every day. #MumbaiInMinutes #MMRDA #MahaMumbaiMetro #MetroLine7 #MMRDAMovesMumbai #Poisar #ReimaginingMMR CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MMRDA MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳

Maha Mumbai Metro Operation Corporation Ltd

63,342 views • 1 month ago

Your Local Metro Hub: Chembur Metro Station 🚇 | Metro Line 2B | Yellow Line Your neighbourhood. Your Metro. Your gateway to a more connected Mumbai. Located in the heart of Chembur, the newly inaugurated Chembur Metro Station is emerging as an important multimodal transport hub for Mumbai’s eastern suburbs. With seamless connectivity to Chembur Suburban Railway Station and Chembur Monorail Station, the station brings three major public transport networks closer together, making everyday interchanges simpler and more convenient for Mumbaikars. The station also strengthens access to some of Mumbai’s key road corridors, including the Eastern Express Highway, Eastern Freeway, SCLR, Sion–Panvel Highway, Dr. C. G. Road and R. C. Marg, helping commuters navigate the eastern suburbs with greater ease. As Mumbai’s Metro network continues to expand, Chembur is set to become an important link in a more integrated metropolitan transport network, connecting neighbourhoods, workplaces and key destinations across the city. Once fully commissioned, Metro Line 2B is expected to significantly reduce travel time, ease road congestion and vehicular pollution, while strengthening connections between four Metro lines, the Monorail, and Mumbai’s Central and Western Railway networks. From daily commutes to work and school to journeys across the city, Chembur Metro Station brings multiple ways to move, all within easy reach. One station. Three transport networks. A more connected Mumbai. #KnowYourStation #MMRDA #MahaMumbaiMetro #ChemburMetroStation #MetroLine2B #YellowLine #Chembur #MumbaiInMinutes #MumbaiMetro CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR MMRDA

Maha Mumbai Metro Operation Corporation Ltd

70,574 views • 12 days ago

Phase II/CP30/TU-01/ – TBM Kolli (S 81) Breakthrough at Otteri shaft ​Chennai Metro Rail Limited has commenced the expansion of the Chennai city’s metro rail network as part of Phase II after the successful completion of the Phase I and Phase I Extension. CMRL has ventured into an extensive infrastructure development in the city comprising of three more corridors of metro rail for a total length of 116.1 km. ​Corridor 3 comprising a total alignment length of 45.4 km from MadhavaramMilk colony to Siruseri Sipcot will be spanning across the north to south direction of the Chennai city and has a total of 28 underground stations and 19 elevated stations. ​Corridor 4 is an east west alignment for a length of 26.1 km connecting the beach front from Light House station to the Depot at Poonamallee has 9 underground stations and 18 elevated stations. ​Corridor 5 also begins at Madhavaram Milk colony and connects through Koyambedu, Porur, Alandur and other residential/commercial development of the city to Shollinganallur for a total length of 44.6 km with 6 underground stations and 39 elevated stations. ​The tunnel construction for the first 9 km underground section of Corridor 3 from Madhavaram Milk Colony to Kellys is being executed through M/s Tata Projects limited and mobilized 7 TBMs for the tunnelling works. ​The TBM Kolli (S 81) tunnel drive started on 11.07.2023 from AyanavaramStation to Otteri station (Up line), covered a bored tunnel length of 903 m and break-through done at Otteri shaft on 29.08.2024. This is the 6th TBM breakthrough carried out by M/s Tata Projects Limited under TU-01 contract. As a whole, CMRL has completed 7 TBM breakthroughs in phase-2 project. ​The tunnel section between Ayanavaram and Otteri is the most complex tunnel section under the contract TU-01 with major challenges, such as the TBM S 81 (Kolli) first 500m tunnel drive negotiated with sharp 220m radius curve and the last 200m tunnel drive with 280m radius curves. Also, this tunnel drive completed with major challenges such as passing through densely populated areas and addressing more than 100 No. of bore wells along the alignment by providing alternate sources without any issue to the public. ​The complete tunnel drive was well managed within the allowable minimum settlements and extensive instrumentation and monitoring was ensured throughout the drive. ​Thiru T. Archunan, Director Projects of CMRL, Thiru. Kolli Venkata Ramana, AGM CIVIL UG, Thiru. Alper Vahit Yildiz, Project Manager/Tata Projects, Thiru. Naidu chief resident engineer of GC, other officials of CMRL, General Consultant and Tata Projects were present during the event. #chennaimetro #cmrl #chennai #metrorail #phase2 #otteri #chennaimetrorail

Chennai Metro Rail

29,092 views • 2 years ago