Professional Stepping Stone Installation
Professional Stepping Stone Installation
1. Plan the Path – Walk the route naturally and mark the layout.
2. Measure Spacing – Measure 18–24 inches between each step for consistent, comfortable strides.
3. Mark Locations – Outline each stone to lock in alignment before digging.
4. Excavate – Dig each spot 2–3 inches deeper than the stone thickness.
5. Set the Base – Install and compact paver base, then add leveling sand.
6. Place Stones – Set each stone, level it, and tap into place.
7. Re-Measure Each Step – Confirm spacing before setting the next stone for precision.
8. Backfill & Secure – Fill edges, compact, and clean up.
9. Final Walk-Through – Test comfort, make adjustments, and review with the customer.
#landscape #howto #tip #pavers #stepbystep
Comments
Comments from the original post on Instagram
No comments yet