Загрузка видео...

Не удалось загрузить видео

На главную

Ship 42 has completed both its single- and six-engine static fire tests, paving the way for Flight 15 in November. These events occurred during a busy period at Starbase that included Ship 43 testing ahead of Flight 16. ➡️

30,992 просмотров • 4 дней назад •via X (Twitter)

Комментарии: 14

Фото профиля Lindsay
Lindsay4 дней назад

Hope we get to see that SpaceX drone footage from last night

Фото профиля Brandon Burruss
Brandon Burruss4 дней назад

Ship 43 testing right behind Ship 42 is the real story. Two ships in the pipeline is how the flight cadence picks up.

Фото профиля Mehmet Ozcelik
Mehmet Ozcelik4 дней назад

Great coverage as always 👏🏼 Ship 42 is ready. 💦 📸 @cnunezimages

Фото профиля SPCX Journey🚀
SPCX Journey🚀4 дней назад

Two ships in test at the same time is the quiet headline. Ship 42 done, Ship 43 already lining up for Flight 16. If that overlap holds, the gap between flights shrinks without anyone announcing it.

Фото профиля Ricky camacho
Ricky camacho4 дней назад

Flight 14 on Sept 28 was Starship's first orbital flight and deployed all 26 Starlink V3 sats. Elon said Oct 10 he hopes Flight 15 catches the ship, so a November launch lands right in his 4-6 week window.

Фото профиля KPlitt
KPlitt4 дней назад

Ok when catch?

Фото профиля Mission Status🚀🛰️🪐💫⭐
Mission Status🚀🛰️🪐💫⭐4 дней назад

Looked like a clean burn 👍🔥

Фото профиля 머스크 생태계 분석가
머스크 생태계 분석가4 дней назад

Ship 42 정적 연소 두 번 다 끝났어요. Flight 15는 11월이라고만 했고 날짜는 아직이에요.

Фото профиля Next Billion Labs
Next Billion Labs4 дней назад

The parallel testing is the real story here. When two ships move through test campaigns at once, the bottleneck shifts from the vehicle to the pad, the range, and the turnaround crew. Is Starbase's pace now limited more by operations than by hardware?

Фото профиля David King
David King4 дней назад

The 60s static fire is next? And then they can stack?

Фото профиля Mike Larson
Mike Larson4 дней назад

Ship 42 wrapping both static fires while Ship 43 is already testing for the flight after it is the part I love. That's not a test program anymore, that's a production line. Cadence is the whole game for Mars.

Фото профиля Ledge Andary
Ledge Andary4 дней назад

Both Flight 15 stages have fired now, and Ship 43 is already testing right behind it. That's what a real cadence looks like.

Фото профиля Chris_Equinox 📯
Chris_Equinox 📯4 дней назад

Wen liftoff?

Фото профиля Thomas Shaffer
Thomas Shaffer4 дней назад

ship 42 and ship 43 testing in the same week is the part that feels new. flights used to wait on one vehicle at a time

Похожие видео