🚧 STRR Update: Hoskote–Hosur Road Interchange is now open, boosting connectivity between Hoskote ↔…
@hosurupdates5.2K followers
61,323 views
22 Comments
Comments from the original post on X (Twitter)

@AgantukBlr
Its nowhere near open. See in your update itself, they havent paved the entry ramp points to STRR from BCE. I think someone removed a few barriers to allow temporary entry. I go there every week so this is first hand information.
29 likes

@akki_anila
Is the malur ROB done? If not a fake update
13 likes

@infrablr
Is the work completed till malur Rob.? Land acquisition was pending at 2-3 locations
11 likes

@mindTumult
Don't spread false information. The entry/exit points aren't open, and the ROB work near Malur is still incomplete.
7 likes

@aka_fayas
Will this reduce the load on SH-35 ( varthur road ) ?
5 likes

@CJShashank
It's still not completed. This post deserves a community note
4 likes

@Apexzm5r
This is false. Deserves a community note. ROB near Malur is not operational yet, I suffer everytime I have to head to the airport from Chikkatirupathi
2 likes

@manjunathabe
Malur bridge is stopped rite ? @ChristinMP_
1 like

@Nrk1401
STRR is now open between Hosur- Hoskote strech. Much needed to divert Out-Bound vehicles. Now BLR & Tamil Nadu traffic to direct out-bound vehicles to use this road at Hosur & Dobaspet. Thanks to NHAI. Next Hosur-Mysore Road-Tumukur road should be completed as early as possible.
1 like

@senthp
How is this possible? Malur rob is nowhere near completion.
1 like

@RagnarokHammer
Railway over bridge permission pending from railways was the last update. Pls update with prood on ROB
1 like

@k_suparna
Amazing 😻

@ashocas
Is it True???

@anilkumarmo
@hosurupdates do not post misleading updates . If your info is correct please clarify

@Ram97061060
No I guess

@AVINASHABHI1
Thanks to Nehru,🙏

@SVKrishna521
Fake update

@unmanagedbean
Can you show it to me in a map on how I can enter strr from Hosur?

@madhanmannar
Can we use this road

@SushmaSp165918
False news