Загрузка видео...
Не удалось загрузить видео
The Key Bridge Response Unified Command is scheduled to use precision cuts made with small charges to remove a large section of the #FSKBridge wreckage from on top of the M/V DALI.
36,143 просмотров • 2 лет назад •via X (Twitter)
Комментарии: 3

USACE Baltimore2 лет назад
The small charges, a standard controlled demolition tool, will split the large section of truss at specific locations to create multiple, smaller sections, allowing salvors to use cranes/barges already on scene to remove sections of the bridge and M/V DALI from the channel.

USACE Baltimore2 лет назад
The exact time of the precision cuts will depend on multiple environmental and operational factors. Read the full release:

Ken&Eddie2 лет назад
@ALFORDtech 🤔
