Loading video...

Video Failed to Load

Go Home

🚉 The Sabarmati Multimodal Hub ✅ Integrated seamless connectivity - Bullet Train, Metro, BRTS and present Railway networks.

63,274 views • 9 months ago •via X (Twitter)

0 Comments

No comments available

Comments from the original post will appear here

Related Videos

Transforming Mumbai’s Commute...🚇 Mumbai Metro Route 3, Phase 2-A : A new era of Seamless, World-Class Connectivity! Flagged off 'Phase 2A of Mumbai Metro 3 from BKC to Acharya Atre Chowk (9.77 km)' today at BKC, Mumbai today. Under Hon PM Narendra Modi Ji's leadership, the metro network across India—particularly in Maharashtra—is expanding rapidly. Metro Line 3, the country’s longest underground line, stands as an 'Engineering Marvel'. Launched in 2017, the project is nearing completion at remarkable speed. The final phase, from Acharya Atre Chowk to Cuffe Parade, is expected to open to the public this August, with an inauguration by the Hon PM Narendra Modi Ji. The newly inaugurated route includes 26 stations, each with multiple entry points. Notably, Metro Line 3 will link directly to the airport, allowing passengers to travel seamlessly by metro. Construction on other lines is progressing rapidly, with 50 km of new routes set to be added this year and next. Soon, commuters across the Mumbai Metropolitan Region (MMR) will be able to travel by metro, monorail, local train, and bus using a single integrated ticket. Mumbai Metro Route 3, Phase 2-A Highlights: ✅ Total stations: 6 (All underground) ✅ Route length: 9.77 km ✅ Headway: Every 6 minutes 20 seconds ✅Fares: ₹10 – ₹40 ✅Trains in service: 8 Top Features of the New Metro Line: ✅Fully air-conditioned trains and stations ✅Reserved coaches for women passengers ✅Advanced baggage scanning and passenger screening ✅Well-lit, secure stations and platforms ✅24x7 surveillance with CCTV and security staff ✅Seamless mobile connectivity across trains and stations ✅Accessible restrooms with baby diaper-changing facilities ✅Multilingual passenger guidance system ✅LCD screens for infotainment and ads ✅Dynamic digital route maps ✅Full wheelchair access for PwDs ✅Fire and smoke suppression systems in every coach ✅Emergency communication systems between passengers and control room Connectivity : ✅Seamless connectivity to major business hubs like BKC and Worli ✅Future integration of BKC station with Metro Line 2B and Bullet Train ✅Easy access to religious places like Siddhivinayak Temple, Mahim Dargah & Church ✅Direct metro access to popular entertainment hubs including Shivaji Park, Yashwant Natya Mandir, Ravindra Natya Mandir, and Plaza Cinema Mumbai’s other metro lines have been well received by the public. This project marks another key step in making the city’s transport faster, smarter, and more inclusive. Eknath Shinde - एकनाथ शिंदे Ashwini Bhide MumbaiMetro3 Maha Mumbai Metro Operation Corporation Ltd #Maharashtra #Mumbai #MumbaiMetro3

Devendra Fadnavis

33,579 views • 1 year ago

Mahalaxmi to Get India's First Travellator-Equipped Skywalk Linking Monorail, Metro 3 and Suburban Railway MMRDA has completed approximately 90% of the Mahalaxmi Multimodal Connectivity Project, a landmark initiative that will seamlessly connect Sant Gadge Maharaj Chowk Monorail Station, Metro Line 3 and Mahalaxmi Suburban Railway Station through India's first travellator-equipped skywalk, making travel across Mumbai faster, safer and more convenient. Once operational, the integrated interchange will reduce transfer time by approximately 20 minutes, improve access to the Mumbai Monorail from South Mumbai and Worli, and encourage greater use of public transport through seamless multimodal connectivity. Project Highlights: • Approximately 283-metre-long integrated pedestrian bridge • 11-metre-wide structure for smooth passenger movement • Six travellators with a combined length of 176 metres • Two passenger lifts for universal accessibility • Capacity to accommodate approximately 4,500 passengers every hour Built in one of Mumbai's most utility-congested corridors, the project reflects MMRDA's engineering expertise. A 1,800 mm diameter storm water drain was safely relocated before foundation works began, while adjacent water supply and sewer pipelines remained undisturbed, ensuring uninterrupted civic services throughout construction. The project was also executed without felling a single tree, with traffic managed in close coordination with the Traffic Police and the annual Ganesh Visarjan processions along Sane Guruji Marg continuing without disruption. More than a pedestrian bridge, this is another step towards a truly integrated public transport ecosystem where Metro, Monorail and suburban rail work together as one seamless network for Mumbai. CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Maha Mumbai Metro Operation Corporation Ltd MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 PIB India #MMRDA #MumbaiInMinutes #MultimodalConnectivity #IndiasFirst #TravellatorSkywalk #MumbaiMonorail #MetroLine3 #MumbaiSuburbanRailway #UrbanMobility #Infrastructure #SeamlessConnectivity #SmartCities #Mahalaxmi #RebootingMumbai #PublicTransport

MMRDA

61,452 views • 13 days ago