Video wird geladen...

Video konnte nicht geladen werden

Zur Startseite

This 37-storey tower in Manhattan has been evacuated after at least two structural columns buckled on its 21st floor. Formerly the headquarters of pharmaceutical giant Pfizer, the building at 235 East 42nd Street had been undergoing renovation work to convert it from office space to more than 1,600 high-end...

22,805 Aufrufe • vor 1 Monat •via X (Twitter)

0 Kommentare

Keine Kommentare verfügbar

Kommentare vom Original-Post werden hier angezeigt

Ähnliche Videos

Businesses in Mombasa have been at a standstill for the better part of Wednesday as military personnel took control of the area surrounding a nine-storey building along Abdel Nasser Road, which is set for controlled demolition. A 1.2km buffer zone has been set up around the building as authorities finalize preparations for its demolition. The building was declared structurally unsound after a partial collapse last week, which raised immediate safety issues for nearby residents and surrounding structures. In response, all residents have been evacuated, with precautionary measures in place to ensure their safety. Patients from Coast General Teaching & Referral Hospital have also been advised to seek medical services in alternative hospitals during the affected period to avoid any risks associated with the operation. The public has been urged to stay clear of the vicinity for the next eight hours, as the demolition is carried out. Emergency services, including ambulances and fire trucks, are on standby to handle any unforeseen events during the controlled explosion. The collapse is believed to have been caused by the addition of extra floors, which added more weight than the foundation could support. The drilling of a borehole near the building led to the floor columns sinking by three meters and further compromised the structure's integrity. As a result, the decision was made to bring the building down using controlled explosions.

Cyprian, Is Nyakundi

68,833 Aufrufe • vor 1 Jahr