正在加载视频...

视频加载失败

This tunnel boring machine breakthrough

6,814,267 次观看 • 1 年前 •via X (Twitter)

11 条评论

Waleed🧩 的头像
Waleed🧩1 年前

Fascinating power #zelena #BBMzansiumililo

Solar Heavy 的头像
Solar Heavy1 年前

this reminds me of driving through a city

Epic Posts Daily 𝕏 的头像
Epic Posts Daily 𝕏1 年前

Tunnel boring machine at work

HAPPYNESS 的头像
HAPPYNESS1 年前

Did you know ?? How a tunnel boring machine works

Jade Explorer 的头像
Jade Explorer1 年前

The Herrenknecht TBM (The Boring Machine) breaks through the 3200 meter long Belchen tunnel after 72 weeks.

HAPPYNESS 的头像
HAPPYNESS1 年前

The Herrenknecht TBM (The Boring Machine) breaks through the 3200 meter long Belchen tunnel after 72 weeks

HAPPYNESS 的头像
HAPPYNESS1 年前

The Herrenknecht TBM (Tunnel Boring Machine) breakthrough is a significant event in the construction of the Belchen renovation tunnel in Switzerland. The project involved a Herrenknecht Single Shield TBM, which is a type of machine used for digging tunnels through various geological conditions. This particular TBM was used to create a new tunnel tube parallel to the existing Belchen tunnel system, which is an essential part of the north-south road traffic route via Gotthard in Switzerland. The Belchen renovation tunnel cuts through the Jura Mountains between Basel and Lucerne and is crucial for both international and domestic Swiss traffic. Due to increasing rock pressure, the existing two-lane dual carriageway tubes of the A2 road tunnel required urgent repair for operational safety. The new refurbishment tunnel was driven through the mountain at a distance of between 40 and 116 meters from the existing tunnel system. The Herrenknecht TBM faced challenging ground conditions, including soft layers of rock alternating with up to 225 MPa hard layers, karstified and/or water-bearing transition zones, squeezing opalinus clay, and swelling gypsum keuper. Despite these challenges, the TBM crew managed to complete the tunnel breakthrough at the northern portal at Eptingen after approximately 16 months of tunnelling, which was three months ahead of the original schedule.

HAPPYNESS 的头像
HAPPYNESS1 年前

French and British workers meet while digging the Channel Tunnel that connects Britain and mainland Europe (1990)

TooFuginBad 的头像
TooFuginBad1 年前

That is such a boring company.🤣

Rumi Verses 的头像
Rumi Verses1 年前

Dutch highway tunnel built in a one weekend 😳

Dreams N Science 的头像
Dreams N Science1 年前

Wow impressive! The largest tunnel boring machine has a shield diameter of **17.63 meters** (57 feet 10 inches). This machine was used to excavate the Chek Lap Kok to Tuen Mun subsea road tunnel in Hong Kong, China.

相关视频