📏Tile layout📏 . Part 2: where we layout the tile and install the back wall. .
📏Tile layout📏
.
Part 2: where we layout the tile and install the back wall.
.
This was about 5 hrs of work.
.
Super important to take the time to layout your tile before starting install so you have a game plan in place to set you up for success.
.
Equal cutoffs on both the right side and left side of the wall is a must. Also nice to have your top & bottom.rows to be the same width. So figure that out and start with a ripper that's going to be the same height as the top row ripper.
.
Clean your grout lines as you go and keep the thin set behind the tile. Not in the grout line. Huge pain in the butt to clean after the thin set cures.
.
#finishedbasement
#tileshower