👷‍♀️👷‍♂️ We're working on foundations for Oxford's new Botley Road rail bridge. 🚶🚴 Now installing 40m-deep piles for the new 4-metre wide cycle/pedestrian route on the station side of the road - due to open this summer. 🎬 See our huge piling rig in action #OxfordshireConnect

12,596 Aufrufe • vor 1 Jahr •via X (Twitter)

5 Kommentare

Profilbild von Gareth Mitchell
Gareth Mitchellvor 1 Jahr

Great to see these informative videos, out of interest why would you need 40m piles for a pedestrian / cycle route?

Profilbild von Network Rail Western
Network Rail Westernvor 1 Jahr

Hi. Thanks for your query. The new bridge will carry trains over the road. The walkway/cycleway will be above road level and will pass through an open box under the bridge (as illustrated). The box and the bridge need to take the weight of the railway & trains passing over them.

Profilbild von Huw Sayer ✒️ now @huwsayer.bsky.social
Huw Sayer ✒️ now @huwsayer.bsky.socialvor 1 Jahr

Please confirm/explain need for piles each 40 metres deep. Is that usual? It's only a bridge for bikes, not heavy vehicles.

Profilbild von Network Rail Western
Network Rail Westernvor 1 Jahr

Hi. Thanks for your query. The new bridge will carry trains over the road. The walkway/cycleway will be above road level and will pass through an open box under the bridge (as illustrated). The box and the bridge need to take the weight of the railway & trains passing over them.

Profilbild von Aaron Law
Aaron Lawvor 1 Jahr

@xSnowy