Video yükleniyor...

Video Yüklenemedi

Ana Sayfaya Dön

While Ship 38 aborted its first two attempts at a pre-Flight 11 Static Fire test, NSF conducted a flyover of Starbase's facilities, showing progress on Pad 2 construction, and Massey's repairs, along with the growing production site. ➡️

38,409 görüntüleme • 8 ay önce •via X (Twitter)

0 Yorum

Yorum bulunmuyor

Orijinal gönderinin yorumları burada görünecek

Benzer Videolar