
Zoru Bhathena
@zoru75 • 12,964 subscribers
Shorts
Videos

Missing Link Once again under repair Using Space Age Technology
Zoru Bhathena120,535 Aufrufe • vor 2 Monaten

VVIP With 45 car cavalcade No wonder these people are so out of touch with ground reality
Zoru Bhathena513,085 Aufrufe • vor 2 Jahren

Mumbai Metro2A Carrying capacity of 1800 people per train Was carrying about 200 (seats were available) Took over 2 mins for all passengers to exit the station at last stop at Andheri W / DN Nagar interchange Imagine what will happen when 1800 people try to exit together
Zoru Bhathena206,680 Aufrufe • vor 10 Monaten

Brand New Delisle Bridge, Lower Parel. Where BMC shamelessly forgot to make a pathway for pedestrians.
Zoru Bhathena528,201 Aufrufe • vor 2 Jahren

Santacruz Station Platform 2 Escalator Built as a reminder not to take the easy way out
Zoru Bhathena176,125 Aufrufe • vor 1 Jahr

Amazing! 85 Traffic Police vehicles All taking U turn Where U turn is prohibited
Zoru Bhathena114,861 Aufrufe • vor 1 Jahr

Rain Water Harvesting explained Allow rain water to drain into Harvesting Well Well absorbs max water into ground & naturally filters dirt When Rain exceeds well absorption capacity - it will fill up These Wells fill up @ 100mm rain/hour More Wells = more absorption capacity
Zoru Bhathena28,572 Aufrufe • vor 3 Monaten

London Metro - get off Metro - exit station - run to next station - enter next station - catch same train All in 1 min 36 seconds Mumbai Metro - get off Metro - exit station And that itself takes 4 min 36 seconds My Mumbai Metro It's a long long trek down there
Zoru Bhathena64,930 Aufrufe • vor 10 Monaten