17 August 2026 Giga Texas Snapshots! Many interesting changes today including a complete revision of the E secondary glass entrance to the main factory along with a large section of wall panels removed. The Optimus factory continues to grow & may have some floors poured with concrete. The E...

21,093 просмотров • 6 дней назад •via X (Twitter)

Комментарии: 0

Нет доступных комментариев

Здесь появятся комментарии из оригинального поста

Похожие видео

17 June 2026 Giga Texas Snapshots! I’m back after a few weeks away in Europe & visiting Giga Berlin (a fantastic factory too!) so today I decided to try and get a good overall look at the activity & changes here since I was away, and there is really a lot to cover … almost too much! Cybercab production continues with many of these vehicles lined up at the factory exit point & more int the outbound lot. I saw a Model Y production going strong too, with several in the new shades of blue recently announced too! The 4680 battery cell portion of the factory was getting concrete delivered inside where I’ve observed demolition & expansion work underway to increase production capacity & this is backed up with several new permits filed over the past few days! The Test track has had more work on it including paint marks, dedicated lanes w/ dividers & a Cybercab testing office & vehicles that have been recently observed driving on the track for some kind of testing. The E side where the new joint venture with SpaceX Advanced Chip fab is being constructed was getting GeoPier work, while more preparations were underway to relocate active workshops & recycling yards further to the N to clear space for additional construction. Cortex 2 part 2 chiller system fan tower seems nearly completed structurally, while more pipes, vale’s & wrapped items remain to be installed. The N Optimus factory shows significant work with steel erection (up to 4 floors), GeoPier work on the N end, grade work on the S end, land reclamation on the extreme S & footing construction in the middle. This will truly be a massive factory once completed w/ floor space a significant % of the main factory! Much more going on today! It’s great to be back!

Joe Tegtmeyer 🚀 🤠🛸😎

14,419 просмотров • 2 месяцев назад