Video yükleniyor...

Video Yüklenemedi

Ana Sayfaya Dön

A 120-km coastal corridor that will transform how Mumbai moves. The Mumbai Metropolitan Region is set for its biggest mobility leap yet — a high-speed coastal corridor that will supercharge the region’s growth. The Government of Maharashtra has cleared the Uttan–Virar Sea Link and its extension to Vadhavan Port,...

17,521 görüntüleme • 9 ay önce •via X (Twitter)

0 Yorum

Yorum bulunmuyor

Orijinal gönderinin yorumları burada görünecek

Benzer Videolar

Soon: South Mumbai–Thane in just 25 minutes MMRDA has commenced construction of the Elevated Eastern Freeway Extension, a 13.9 km, fully elevated 6-lane high-speed corridor that will dramatically reduce travel time between South Mumbai and Thane to 25–30 minutes, while easing daily congestion on the Eastern Express Highway (EEH)—one of Mumbai’s busiest arterial routes serving lakhs of commuters every day. The corridor will run from Anand Nagar, Thane to Chheda Nagar, Ghatkopar, with key links at Mulund, Airoli, JVLR, Vikhroli, Kanjurmarg, Mankhurd and Ghatkopar. In Thane, the corridor will merge seamlessly with the Anand Nagar–Saket Elevated Road near the erstwhile Mulund Octroi Naka, forming a continuous high-speed route. It will also provide seamless onward connectivity to the Samruddhi Expressway. Once completed, the project will significantly improve traffic flow, lower emissions, and offer a faster, more reliable and greener commute to lakhs of citizens, while boosting economic activity across the MMR. As part of MMRDA’s commitment to sustainable development, and in consultation with experts and green activists, the Vikhroli–Ghatkopar stretch was realigned to save 127 Pink Trumpet trees. A total of 4,175 new trees will be planted as compensatory green cover. Key Highlights: ✔️ Construction of 2.5 m diameter monopiles, robust piers, 40-m spans, and a 25-m single-segment superstructure ✔️ Single-pile, single-pier system — first-of-its-kind for an elevated road in MMR ✔️ Up–down ramps near Mulund Check Naka, Airoli Junction & Vikhroli Junction ✔️ 3+3 lane elevated toll plaza near Navghar Flyover ✔️ Designed for uninterrupted, safe, high-speed movement Status Update: • Preliminary survey works completed • Test piles completed • Geotechnical investigation mostly done • Utility identification substantially completed • Working piles and pier casting in progress A faster, greener and more connected Mumbai Metropolitan Region is taking shape — one pillar at a time. #MMRDA #EasternFreewayExtension #MumbaiToThane #25MinuteCommute #MumbaiInfrastructure #ViksitMMR #UrbanMobility #NextGenConnectivity #MumbaiDevelopment #SeamlessConnectivity #HighSpeedCorridor #MumbaiInMinutes #FutureReadyMumbai #SustainableMumbai #TransformingMMR #MMRGrowth #MumbaiMetropolitanRegion #TransformingMMR #ReimaginingMMR #RebootingMumbai #ReshapingMMR CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR PIB India

MMRDA

84,063 görüntüleme • 9 ay önce

Major Project Update: Thane Coastal Road hits fast forward In just eight months since construction began, Thane Coastal Road-1 has crossed a major milestone, with over 50% of the foundation work for the elevated viaduct now complete and pier cap and I-girder erection progressing rapidly. 👉 The 13.45 km, six-lane, access-controlled greenfield corridor is being built using cutting-edge engineering. For the first time in India, a greenfield road project is using a single-pile, single-pier system with monopile foundations on land. 👉 Designed as a strategic freight corridor, the project will decongest Ghodbunder Road and improve connectivity between NH-160 (Mumbai–Nashik Highway) and Gaimukh along the Thane Creek coastline, with major stretches on viaducts and bridges to safeguard the sensitive mangrove ecosystem. 👉 At Gaimukh, the road will directly connect with the upcoming Gaimukh–Fountain Hotel Tunnel, enabling seamless Thane–Bhayander connectivity. Together, these projects will significantly decongest Ghodbunder Road, transform urban mobility in Thane, and strengthen freight movement towards Wadhawan Port, JNPT, South Maharashtra, and Karnataka. 👉 The corridor will also integrate with key future infrastructure projects including the Thane Ring Metro, Thane Coastal Road-2, the Saket–Amane Elevated Corridor, and the Kasarvadavali–Kharbhav Road, cementing its role as a critical backbone of the region’s next-generation transport network. #ThaneCoastalRoad #MMRDA #InfrastructureIndia #ReimaginingMMR #TransformingMMR #UrbanMobility #BuildingTheFuture #MumbaiMetropolitanRegion #MegaProjects #Maharashtra #TransportInfrastructure #FastForward CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR PIB India Infra News India (INI) Indian Tech & Infra Thane Municipal Corporation - ठाणे महानगरपालिका

MMRDA

26,177 görüntüleme • 6 ay önce

Palghar is becoming Maharashtra's next growth engine. This district is not just a part of Maharashtra's growth story. It is the chapter that will define it. Under the visionary leadership of Hon. PM Shri Narendra Modi Ji, projects that once seemed distant possibilities are today taking concrete shape. Reviewed key aspects of the proposed Vadhavan Port at Chinchani Beach, including internal road network, forest clearances, power supply, rail connectivity, land acquisition, water supply, skill development and compensation for fishermen. Spread over 1,448 hectares with an estimated cost of ₹76,220 crore, this greenfield port will handle next-generation vessels with a 20-metre deep draft, making it capable of berthing the world's largest ships, something no Indian port can offer today. At three times the capacity of JNPA, it will rank among the world's top 10 ports and is expected to generate 10 lakh jobs. What matters equally to me is how we build this. Through open dialogue, fair rehabilitation, ITI upgradation, skill training and a dedicated fisheries institute, we are committed to ensuring that the people of this land, our tribal communities, our fishermen, our youth, are not just witnesses to this progress but its primary beneficiaries. Also inspected the ongoing construction work and reviewed the project layout of the Boisar Station under the Mumbai-Ahmedabad Bullet Train Project. Work is progressing well and officials have been instructed to maintain pace and quality within the decided timelines. Once operational, Boisar will connect to BKC in under thirty minutes, opening up this entire region economically. This is a project that will genuinely change the character of Palghar. Also reviewed the site of the proposed offshore Airport in Palghar district, which is going to be India's first offshore airport. This project adds a critical third dimension to this connectivity picture. Situated in proximity to the Dedicated Freight Corridor, the Bullet Train, the Uttan-Virar Sea Link, the Mumbai-Vadodara Expressway and the Mumbai-Ahmedabad National Highway, it will significantly improve connectivity while easing the growing passenger load on Mumbai Airport. The pre-feasibility report has confirmed the site as viable and the DPR has been ordered today. Also discussed the MMRDA-developed Narangi Creek Bridge, a ₹850 crore, 4.10 km project that will directly connect Vasai-Virar with Saphale, Palghar and Boisar, reducing travel distance by nearly 40 km and travel time by around 45 minutes. Also held detailed discussions on the Uttan-Virar Sea Link, a proposed six-lane project worth approximately ₹58,754 crore that once complete will directly connect to the Mumbai-Ahmedabad National Highway, making travel between South Mumbai and Ahmedabad faster, safer and more convenient. Inspected the construction and reviewed progress on the Vadodara-Mumbai section of the Delhi-Mumbai Expressway, one of India's most ambitious infrastructure undertakings. A defining feature of this 8-lane greenfield corridor is its direct connectivity to JNPA, enabling faster, more efficient and cost-effective freight movement from North India and giving a major boost to the country's logistics chain. It will also offer a reliable alternative to the congested Thane-Bhiwandi-Ghodbunder routes, with travel time between Vadodara and Mumbai set to reduce from 8 hours to approximately 4 once complete. Vadhavan Port, Bullet Train, Offshore Airport, Delhi-Mumbai Expressway, Uttan-Virar Sea Link, Narangi Creek Bridge, Virar-Alibaug Corridor. Each project is significant on its own. Together, they are building the Fourth Mumbai, a new economic centre of gravity rising in Palghar, under the visionary leadership of Hon PM Shri Narendra Modi Ji and the resolve of a government that has cleared decades of stalled decisions. Palghar is emerging as a major growth engine for Maharashtra, opening new opportunities in ports, transport, industry, exports and employment.This is the Maharashtra we are building, and Palghar is leading the way. Minister Ganesh Naik ji, Minister Nitesh Rane, MP Dr Hemant Savara, MLA Rajendra Gavit and senior officials were present. 🙏 जय महाराष्ट्र Ganesh Naik Nitesh Rane Dr. Hemant Savara Mp Rajendra Gavit Official #Maharashtra #Palghar #InfrastructureDevelopment

Devendra Fadnavis

56,147 görüntüleme • 2 ay önce

Mumbai 3.0, India’s Next Investment Frontier, Takes Centre Stage at WEF 2026 At the World Economic Forum 2026, Hon’ble Chief Minister of Maharashtra Shri Devendra Fadnavis announced a focused push to attract global investments into Mumbai 3.0, a next-generation city being developed by the MMRDA, envisioned to be three times the size of Mumbai. Backed by transformative infrastructure including the Navi Mumbai International Airport, the Atal Setu, and integrated multimodal connectivity, over 675 sq km of new urban area is being opened up, forming one of India’s largest future-ready urban agglomerations. Also known as KSC New Town, Mumbai 3.0 is planned as a thematic global city focused on Ease of Living and Ease of Doing Business. It will comprise Edu City, Medi City, Sports City, Innovation City and GCC (Global Capability Centre) City, positioning the MMR as a global investment hotspot for new-age businesses. With a strong pipeline for employment generation, FDI inflows and sustainable growth, Mumbai 3.0 is set to power India’s next economic leap. Under the leadership of the Hon’ble Chief Minister and the guidance of Deputy Chief Minister and MMRDA Chairman Shri Eknath Shinde, we remain committed to transforming the Mumbai Metropolitan Region into a globally competitive economic powerhouse, while delivering world-class urban living for its citizens. #WEF2026 #MahaAtDavos #DevendraFadnavis #MMRDAAtDavos #Mumbai3_0 #NextGenCity #FutureOfUrbanIndia #BuildingTomorrow #ThirdMumbai #WorldClassInfrastructure #CityOfOpportunities #CityOfTheFuture #ReimaginingMMR #RebootingMumbai #ReshapingMMR #MMRDA50 Devendra Fadnavis CMO Maharashtra Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee World Economics MAHARASHTRA DGIPR Maha Mumbai Metro Operation Corporation Ltd

MMRDA

41,953 görüntüleme • 7 ay önce

Mumbai Moves Forward! The final link of the Santacruz–Chembur Link Road is now open, completing the integrated 10.30-km SCLR network between the Eastern Express Highway and the Western Express Highway. The 1.40-km Bharat Nagar Road (University Area)–Vakola Junction Elevated Corridor, built under SCLR Extension Phase II, marks the final and critical link in a network developed progressively since the original SCLR opened. With the Phase I extensions and the completion of Phase II, the SCLR network now provides end-to-end signal-free east–west connectivity across: EEH → Chembur → Tilak Nagar → Kapadia Nagar → Kurla → Kalina → BKC → Mumbai University → Vakola → WEH The newly opened elevated corridor establishes seamless two-way connectivity between BKC and the WEH. Traffic from BKC will merge directly with the SCLR cable-stayed bridge, while traffic from the WEH will move from the existing Vakola Flyover onto the new elevated corridor. The completed network will help motorists bypass Kalina, Vakola and Kalanagar, with travel time expected to reduce by approximately 35 minutes on key journeys. It will also strengthen access to BKC, Mumbai University, Mumbai International Airport, major commercial hubs and surrounding residential areas, while improving commuter convenience, road safety and overall travel efficiency, and helping reduce congestion, fuel consumption, operating costs and vehicular emissions. One network. One seamless corridor. A faster Mumbai. #MumbaiInMinutes #MumbaiMovesForward #MMRDA #ReimaginingMMR #SCLR #InfrastructureIndia Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Sunetra Ajit Pawar Dr. Sanjay Mukherjee

MMRDA

41,530 görüntüleme • 16 gün önce

Urban working. Suburban living. Mumbai in Minutes. That is the future unfolding across the Mumbai Metropolitan Region. This isn't just about building infrastructure. It is about transforming the way millions of people live, work and travel. Imagine living in Thane, Vasai, Virar or Navi Mumbai while reaching your workplace in Nariman Point or BKC in a fraction of the time it takes today. That is the transformation being enabled by India's second-largest Metro network, Asia's largest sea bridge, the Mumbai ring roads network, the integrated Paatal Lok Tunnel Network, the Mumbai–Ahmedabad Bullet Train corridor, and a host of next-generation mobility projects. In this special conversation hosted by Columbia Business School, Columbia University, New York, and Brookfield, one of the world's leading investment management firms, Dr. Sanjay Mukherjee, IAS, Metropolitan Commissioner, MMRDA, shares why this vision extends far beyond infrastructure. It is about creating a world-class Mumbai Metropolitan Region, where connectivity expands opportunity, every project improves quality of life, and urban working and suburban living become the defining rhythm of a future-ready metropolis. At the heart of this transformation lies Mumbai 3.0—a fourth-generation, greenfield city designed to attract the industries of tomorrow, from artificial intelligence and data sciences to semiconductors, while placing social infrastructure, sustainability and environmental responsibility at the centre of development from day one. As MMRDA helps reshape the MMR, it is also preparing concrete, science-led initiatives to address climate change and build a greener, more resilient and world-class metropolis for generations to come. The future is Maharashtra. Within Maharashtra, the future is MMR. Watch Part 2 of this conversation and discover how one of the world's fastest-transforming metropolitan regions is preparing for its next great leap. ▶️ Watch the full interview on YouTube via the link below. CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Brookfield Properties Ministry of Housing and Urban Affairs NITI Aayog FICCI PIB in Maharashtra 🇮🇳 PIBIndia #MMRDA #ReimaginingMMR #DrSanjayMukherjee #MumbaiInMinutes #RebootingMumbai #GlobalMMR #ViksitBharat #InfrastructureIndia

MMRDA

66,426 görüntüleme • 1 ay önce

A Century on Track. The Orange Line is rising. Mumbai’s Metro Line-12 – Orange Line Extension, being built by MMRDA, achieved another major construction milestone with the successful launch of its 100th U-girder near Dombivli MIDC Metro Station on Shilphata Road. The 23.57-km fully elevated corridor with 19 stations will deliver seamless, eco-friendly connectivity between Kalyan, Dombivli, Taloja and the Navi Mumbai International Airport. With this milestone, the project enters a faster execution phase, paving the way for quicker, cleaner and eco-friendly mobility between Thane and Navi Mumbai, while driving transit-oriented development across the Kalyan–Taloja belt. Running parallel to the Kalyan–Shilphata–Taloja corridor and integrating with the MSRDC Flyover for 7 km, the alignment will feature several engineering marvels including 100-metre clear spans near Kolegaon, critical Railway and ROB crossings, and high-rise station construction at 21–23 metres. Seamless interchanges will link commuters to Metro Line-5 at Kalyan, Metro Line-14 at Hedutane, and Navi Mumbai Metro Line-1 at Amandoot, with direct FOB integration to Central Railway at Kalyan Junction. The project is targeted for completion by May 2028. Progress so far: ✔️Survey and alignment for Kalyan–Manpada completed ✔️ First pile, pier cap and U-girder successfully cast and erected ✔️ Batching plant operational for full-scale construction ✔️Civil works and pier construction progressing along key stretches ✔️Land acquisition and R&R underway near Patripul and Amandoot Special spans: 54 m — APMC Kalyan Market | 56 m — Regency Anantam Chowk | 65 m (2 spans) — Central Railway ROB, Patripul | 75 m — Taloja ROB (steel superstructure) |100 m — Virar–Alibaug Multimodal Corridor near Kolegaon Building tomorrow’s MMR, one girder at a time. #MetroLine12 #OrangeLineExtension #MMRDA #MahaMumbaiMetro #OnTrack100 #Kalyan #Dombivli #Taloja #NaviMumbai #Thane #InfrastructureIndia #ReimaginingMMR #TransformingMMR #EngineeringExcellence #UGirderLaunch #ElevatedCorridor #SeamlessConnectivity #GreenMobility #FutureReadyMMR #MMRDA50 #ReimaginingMMR #TransformingMMR #MumbaiInMinutes #RebootingMumbai #ReshapingMMR #ProjectUpdates CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR

MMRDA

13,698 görüntüleme • 8 ay önce

The Mumbai Metropolitan Region is emerging as one of the world's most ambitious urban growth stories. Home to 25 million people and contributing 6% of India's GDP, MMR is laying the foundation for the future of urban India. At the heart of this transformation is MMRDA—India's largest regional development authority and among the top five globally—delivering 100+ projects, 337+ km of metro lines, 100+ km of major roads and a planned urban tunnel network of nearly 90 km. In this special conversation hosted by Columbia Business School and Brookfield, one of the world's leading investment management firms, Dr. Sanjay Mukherjee, IAS, Metropolitan Commissioner, MMRDA, shares how MMR is emerging as a global supercentre and advancing India's journey towards Viksit Bharat. Guided by three core principles: ✨ Rebooting Mumbai 🏗️ Reshaping MMR 🚆 Mumbai in Minutes Watch Part 1 of this conversation and discover how one of the world's fastest-transforming metropolitan regions is preparing for its next great leap. ▶️ Watch the full interview on YouTube via the link here: #ReimaginingMMR #MMRDA #RebootingMumbai #ReshapingMMR #MumbaiInMinutes #ViksitBharat #ColumbiaUniversity #GlobalMMR #FutureOfCities #UrbanTransformation CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Columbia University Columbia University_Biz Brookfield Brookfield Properties NITI Aayog MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 PIB India

MMRDA

20,471 görüntüleme • 2 ay önce

From Coastline to Connectivity, Shaping Mumbai’s Landscape Inspected the ongoing work of the 'Mumbai Coastal Road Project North' today, reshaping a faster, greener and better-connected city. Designed to provide seamless connectivity from Nariman Point and Marine Drive to the western suburbs, Bhayandar, Thane, and beyond, this landmark project aims to reduce traffic congestion, travel time, and pollution. This corridor will also be extended up to Virar and the Vadhavan Port, Palghar in the future. Travel time from Versova to Dahisar is expected to reduce from 120–140 minutes to just 15–20 minutes. Additionally, an elevated connector from the coastal road to the upcoming Goregaon-Mulund Link Road (GMLR) will further strengthen Mumbai's transport network. The Mumbai Coastal Road North (MCRN) Extension from Versova to Bhayandar features innovative engineering elements, including double elevated roads, roads on stilts in mangrove areas, 2 cable-stayed bridges, 4 basket-type bridges, twin underground tunnels, and 10 interchanges. Spread across seven packages A, B, C, D, E, F, and DBLR, the project covers 26.32 km of main road and 32.94 km of interchanges, connectors, and ramps. The project is expected to create employment opportunities, lower vehicle operating costs, and support regional growth, with an Economic Rate of Return (ERR) of 11%. Sustainability is central to the project, with a strong focus on carbon neutrality, while the CM War Room closely monitors progress to keep the project on schedule. The project is expected to reduce carbon emissions by nearly 48%, contributing significantly to a cleaner urban environment. Mangrove conservation remains a priority, with the Maharashtra Government actively expanding and protecting mangrove cover through plantations and dedicated parks. 'Mumbai Coastal Road Project North' is redefining the urban landscape with smoother connectivity, sustainability, and future-ready Mumbai. Minister Adv. Ashish Shelar, BJP Mumbai President MLA Ameet Satam, MLA Sanjay Upadhyay, MLA Prakash Surve ji, Mumbai Mayor Ritutai Tawde, Deputy Mayor Sanjay Ghadi and senior officials were present. Adv. Ashish Shelar - ॲड. आशिष शेलार Ameet Satam Sanjay Upadhyay Prakash Surve - प्रकाश सुर्वे Ritu Tawde sanjay ghadi-संजय घाडी #Maharashtra #Mumbai #NorthCoastalRoad

Devendra Fadnavis

14,951 görüntüleme • 2 ay önce

4 hours. Two massive trusses. One major step forward for Mumbai’s next high-speed road corridor. MMRDA has achieved a major construction milestone on the 13.9-km Elevated Eastern Freeway Extension (EFE), with the successful erection of the two Main Trusses of its Segment Launcher, each 59 metres long and weighing 160 tonnes, on the busy Eastern Express Highway. The entire complex operation was completed within a record 4-hour window, with the actual erection of both trusses taking just 1 hour. The operation was executed through meticulous planning, stringent safety measures and seamless coordination between MMRDA and the Mumbai Traffic Police. So, what happens next? With the Main Trusses now in place, the Segment Launcher will begin erecting 1,632 precast segments, each weighing approximately 90 MT, span by span. These will form the 25-metre-wide single-cell segment superstructure, accelerating viaduct construction and taking the project into its next major phase. And what does this mean for Mumbai? The EFE is a fully elevated, 6-lane high-speed corridor connecting Anand Nagar in Thane with Chheda Nagar in Ghatkopar, designed to create a faster, more reliable route while easing congestion on the Eastern Express Highway, one of Mumbai’s busiest transport corridors. Once completed, the EFE is expected to reduce travel time between South Mumbai and Thane to approximately 20–25 minutes, making everyday journeys faster while strengthening connectivity across the Mumbai Metropolitan Region. Watch 4 hours of precision unfold in minutes. ⏱️ #MMRDA #EasternFreewayExtension #EFE #MumbaiInMinutes #MMRDAMovesMumbai #MumbaiInfrastructure #Mumbai #Thane #ReimaginingMMR #RebootingMumbai #ReshapingMMR CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Maha Mumbai Metro Operation Corporation Ltd MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 PIB India

MMRDA

30,092 görüntüleme • 1 ay önce

The gateway to investment in the Mumbai Metropolitan Region is MMRDA. Under the leadership of Hon'ble Chief Minister Shri Devendra Fadnavis and Deputy Chief Minister and MMRDA Chairman Shri Eknath Shinde - एकनाथ शिंदे, MMRDA is charting an investment horizon of nearly USD 100 billion, shaping the growth story of India's fastest-growing urban agglomeration. We are the only parastatal in the world to have a direct Memorandum of Collaboration with the World Economic Forum. At MMRDA, every project is designed to be bankable. Robust fiscal discipline has enabled us to consistently meet our equity commitments and debt obligations on time, strengthening investor confidence in the institution. Today, we are building the country's second-largest metro network, have commissioned India's longest sea bridge, and will soon deliver a network of seven ring roads across Mumbai, creating the infrastructure backbone for the region's next era of growth. In this special conversation hosted by Columbia Business School and Brookfield, one of the world's leading investment management firms, Dr. Sanjay Mukherjee, IAS, Metropolitan Commissioner, MMRDA, shares how India's largest development authority is building the institutional credibility, financial discipline, and transformative infrastructure needed to power MMR's next phase of growth and position it among the world's most dynamic metropolitan regions. The future is being built today. The future is MMR. Watch Part 1 of this conversation and discover how one of the world's fastest-transforming metropolitan regions is preparing for its next great leap. ▶️ Watch the full interview on YouTube via the link below: #ReimaginingMMR #MMRDA #RebootingMumbai #ReshapingMMR #MumbaiInMinutes #ViksitBharat #ColumbiaBusinessSchool #GlobalMMR #FutureOfCities #UrbanTransformation CMO Maharashtra Dr. Sanjay Mukherjee Columbia University Columbia University_Biz Brookfield Brookfield Properties PIB in Maharashtra 🇮🇳 PIB India MAHARASHTRA DGIPR NITI Aayog MAHARASHTRA DGIPR Maha Mumbai Metro Operation Corporation Ltd

MMRDA

15,213 görüntüleme • 2 ay önce

Mumbai, the wait is almost over. A brand-new, safer, smarter, and smoother Monorail will soon be at your service. We’re proud to share that the Monorail has secured the mandatory safety certification for its new rolling stock and the CBTC-based signalling system from the Independent Safety Assessor, Bureau Veritas, a global leader in testing, inspection, and certification. This is a massive milestone and brings us one step closer to opening the upgraded Monorail for public use. The next step will be the appointment of a retired Commissioner of Metro Rail Safety official to carry out a comprehensive inspection of the entire 19.54 km Monorail corridor and to grant the final statutory clearance to resume passenger operations. This process is also expected to be completed soon, after which the new, improved Monorail will be back in action for Mumbai. The ISA certification was granted after the successful completion of several critical milestones, including: ✔️ Detailed inspection of the new rolling stock at the manufacturing facility ✔️ Rigorous testing across sections of the Monorail corridor over two months to assess operational readiness ✔️ Extensive static and dynamic testing to ensure full compliance with design specifications and the highest safety standards ✔️ Completion of oscillation trials ✔️ Installation and interface-level testing of the advanced CBTC-based signalling system The new 'Made In India' Monorail rakes come with 21 modern upgrades, including CCTV cameras inside every train, Divyang-friendly seats, mobile and laptop charging points, dynamic route maps, improved suspension for smoother rides, fire-safety compliant design, modern metro-style interiors, and real-time monitoring and surveillance systems. We remain committed to delivering a safer, smarter, and more reliable Monorail service to Mumbaikars very soon. #MumbaiMonorail #BackOnTrack #MonorailReturns #BetterThanBefore #SaferSmarterSmoother #UpgradedForYou #MadeInIndia #MMRDA #MahaMumbaiMetro #PublicTransport #MumbaiInMinutes CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Rubal Agarwal Maha Mumbai Metro Operation Corporation Ltd MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 Indian Tech & Infra Infra News India (INI)

MMRDA

27,707 görüntüleme • 6 ay önce

Sewri-Worli Elevated Connector: Transforming Mumbai’s Connectivity! Mumbai’s traffic dynamics are set to change with the Sewri-Worli Elevated Connector, a crucial part of MMRDA’s traffic dispersal system for Atal Setu. This 4.5 km, 4-lane elevated corridor will directly link Atal Setu to Bandra-Worli Sea Link and the Mumbai Coastal Road project, creating a seamless travel experience across the city. 🔹 Enhanced Connectivity: Navi Mumbai commuters heading to Central & South Mumbai *and western suburbs* will benefit from a signal-free, time-saving route. 🔹Traffic : Expected to add about 15-20% vehicular traffic from Bandra-worli and Mumbai Coastal road to Atal Setu, increasing the toll revenue on Atal Setu. 🔹 Engineering Feat: A double-decker Road Over Bridge (ROB) at Prabhadevi Station, crossing both Central & Western Railway lines, *will be constructed* using an advanced Push-Pull method for maximum safety. ✅ Current Progress: 60% work completed. Key Challenge: Assembling & erecting a 3000 MT heavy steel superstructure over railway tracks while ensuring commuter safety. This ambitious project is not just about infrastructure—it’s about connecting lives, reducing commute times, and making Mumbai’s transport network more efficient than ever! Dr. Sanjay Mukherjee #SewriWorliConnector #AtalSetu #MumbaiInfrastructure #SeamlessTravel #MMRDA #MumbaiTrafficSolutions #MMRDA50 #CelebrationOfDevelopment #RebootingMumbai #ReshapingMMR #MMRDA #AtalSetu #MTHL #Mumbai #MetroRegion #EfficientConnectivity #EcoFriendlyTransport #TransformingMumbai #MumbaiInMinutes

MMRDA

19,615 görüntüleme • 1 yıl önce

Many people still don't grasp just how quickly India is moving 🇮🇳 The new Delhi-Mumbai Industrial Corridor (DMIC) will be completed in the next few years. The $100 billion project started in 2007 and has seen significant Japanese investment since the start. Stretching approximately 1,500 kilometers between the capital city Delhi (metro pop. of 34M) and India's financial capital Mumbai (metro pop. of 21M, this initiative will enhance connectivity and stimulate economic growth by developing smart cities, industrial parks along a new Delhi–Mumbai Expressway and the new Western Dedicated Freight Corridor (railway). The 1350 km 8-lane wide (expandable to 12-lane) expressway connecting the two mega-cities will be completed next year and will reduce the travel time from 24h to 11h. The 1500 km Western Dedicated Freight Corridor (WDFC) will also be completed in 2025. The high-speed line will support freight trains reaching 1,500 m (4,900 ft) length pulled by electric locomotives running at speeds greater than 100 km/h (62 mph). The tracks will be entirely grade-separated and have a generous loading gauge of 3,660 mm width and 7,100 mm maximum height allowing for double-stacked shipping containers to be transported on flatcars. This allows for single trains to have a 400+-container capacity. The corridor will reduce the travel time for containers from 50 h, by the existing freight train, to 17 h while significantly increasing the transport capacity on the route as well as decreasing transport costs. The DMIC megaproject also incorporates 9 Mega Industrial zones of about 200-250 sq. km, 3 ports, 6 airports and a 4000 MW power plant. India is rapidly outpacing China in both demographic and economic growth. The 21st century won't be the Chinese century. It will be the Indian century.

Visegrád 24

207,110 görüntüleme • 1 yıl önce