Skip navigation
Brickwork first or slab first? Don’t get it wrong.
0:00

Brickwork first or slab first? Don’t get it wrong.

Brickwork first or slab first? Don’t get it wrong. In an RCC frame structure, always cast the slab first, then do brickwork. In a load-bearing structure, brickwork comes first, slab later. Wrong sequence leads to cracks, structural damage, and costly repairs. [SEO keywords: RCC frame structure, load bearing structure, slab casting sequence, brickwork construction, building construction tips, civil engineering basics]

Comments

Comments from the original post on Instagram

No comments yet