正在加载视频...

视频加载失败

Contractors have returned to the Ozuitem road site. This project remains an ongoing construction effort and has not yet been commissioned. Despite this, certain busybody propagandists—such as Kalu Aja Kalu Aja and Noble Igwe Noble Igwe—continue to spread misinformation and stir unnecessary controversy, running around like headless chickens. In...

24,197 次观看 • 8 个月前 •via X (Twitter)

0 条评论

暂无评论

原始帖子的评论将显示在这里

相关视频

Omo, see how an expressway was constructed in such a strategic part of the city/state. This is not Ikorodu, Badagry, Epe, or Aj City. This is the Lekki–Ajah section of the Lekki–Epe Expressway, one of the most prominent and visible corridors in Lagos, where about 97% of both local and international visitors are likely to pass. When people see roads like this, it can make them judge the government harshly and see it as unserious or unworthy of trust. Even if this road is temporary pending the commencement of the Green Line, the government should urgently call the attention of the contractors to fix it properly and use the opportunity to construct standard drainage. The Green Line is not yet under construction, so the road can still be overhauled later. But it is not good to leave it in this condition. Honestly, I miss Madam Engr Mide Adeyoye. Just like the LAMATA woman, she is a seasoned engineer. If she were still in office, I doubt these contractors would attempt this kind of work because she personally supervised projects. Just look at the section of the road completed before she left,it is very solid. She also constructed Pen Cinema and was planning to use the same design for the VGC Bridge before she left. Government should please help us by appointing round pegs in round holes. It ultimately brings praise to the government itself. Please, sir, let the contractors return to site and fix this road before it gets worse. Many residents rely on this corridor every day. Please help us sir. Babajide Sanwo-Olu Obafemi Hamzat Damilola Sonayon James Seyi Tinubu ENIOLA BADMUS I am Dayo Amusa Lagos Min of the Environment and Water Resources The Lagos State Govt LASEPA Oluwaseun Osiyemi Tokunbo Wahab Lagos State Ministry of Works and Infrastructure Funke Akindele 📷: Failing section of the Lekki–Ajah section of the Lekki–Epe Expressway due to substandard work by the contractors.

Mide.O 🩷

14,666 次观看 • 3 个月前