Loading video...
Video Failed to Load
Cycling through the flight controls on a Block 50 before the FLCS BIT, which is already underway halfway through when the leading edge flaps (LEFs) deploy. That's the jet testing the LEFs as part of the sequence with all the other control surfaces.
11,860 views • 3 months ago •via X (Twitter)
0 Comments
No comments available
Comments from the original post will appear here


