Did you know you know Bayonne has a wind turbine?
@wakeupnj3.8万 位关注者
35,894 次观看
32 条评论
评论来自 X (Twitter) 上的原帖

@Kennyfree57
Yes — the core of the story is true, and your observation matches the public record. The Bayonne turbine (the 260-foot Leitner-Poma unit at Oak and Fifth Streets) was installed in 2012. It worked for stretches early on, then suffered repeated major failures: a generator bearing that lasted only three years instead of the expected 20, a rotor-brake problem in 2016, and another generator failure that took it offline in March 2020. City officials have said it spent more time idle than running. As of the last detailed local reporting (2023), it still had not been returned to reliable service. Officials also confirmed they could not start or stop it locally; the controls and monitoring were handled remotely by the manufacturer (software in Maryland, a switch in Italy). That part of the post is accurate. No later news I found announces a lasting repair that put it back into consistent operation. If you drive past it regularly and the blades are not turning, that lines up with the documented history of long downtime and expensive, delayed fixes. The turbine became a well-known local example of high maintenance costs and limited local control rather than a reliable producer.
10 个赞

@chazoots_
Part of the green new energy scam
8 个赞

@Volleyky22
Green new scam being propagated and amplified by @GovSherrillNJ . Criminal @POTUS @VP @AGToddBlanche @StephenM @AAGDhillon
4 个赞

@sjmins
“The Bayonne wind turbine project cost about $5.6 million total. Federal ARRA stimulus funds covered roughly $4.7 million. The state of New Jersey contributed approximately $823,000–$866,000 via a BPU Clean Energy Program rebate.”
3 个赞

@jacksfriend25
I did not know. The year 2012 says all I need to know. 🤦🏻♀️
3 个赞

@Eddie46973324
The communist Democrats power company . Half of those turbines never work
3 个赞

@Ron11366
I seem to recall the transmission broke early on and can't be repaired ☹️
3 个赞

@sjmins
@grok What has been the total cost to the city of Bayonne for the windmill installed in 2012, and how much did the state of NJ contribute?
2 个赞

@jjgrlfrnd48
I can see it from my house. Installed by a previous mayor (I believe Mark Smith) near a residential neighborhood
1 个赞

@Liberalies1
Windmills require 100’s of gallons of oil per year to keep them from catching on fire and collapsing
1 个赞

@Flintlock63
wtf
1 个赞

@slumdogcovfefe
just travelled across the country twice. half the turbines i saw were motionless.
1 个赞

@jojimbo_
You can see more than one wind-turbine if you drive down Kennedy or 440 to the bridge. It's not any more of an eyesore than the industrial section of Bayonne you see this one in.
1 个赞

@Carlogero_ricca
Good! At least it won’t kill any birds
1 个赞

@Marko626341
There's no scam quite like a "wind energy" scam!!!
1 个赞

@Real1JMT
I used to see the NJ wind turbine on my daily commute, and wondered why it was not turning, ever. What a waste.
1 个赞

@TheKingofRock7
And they want them in the ocean lol.
1 个赞

@Alconaut05L
Yep it looks like Mercedes logo from Staten Island ferry 🤣 never saw it turning
1 个赞

@Mikesatthelake
AFTER TRUMPS WINDMILL DEAL. THIS IS WHAT'S IMPORTANT. CRAWL BACK UNDER A ROCK......

@JJ_OJr
Meanwhile, we have a affordable housing crisis 🤷🏻









