Video yükleniyor...

Video Yüklenemedi

Ana Sayfaya Dön

Engineering excellence rising above every challenge. 🚧 The Foot Over Bridge connecting Brahmand Junction to Tikuji Ni Wadi Metro Station marks yet another major urban infrastructure milestone delivered by Mumbai Metropolitan Region Development Authority. Executed under extremely challenging site conditions above the busy Ghodbunder Road — with a Metro...

25,136 görüntüleme • 2 ay önce •via X (Twitter)

0 Yorum

Yorum bulunmuyor

Orijinal gönderinin yorumları burada görünecek

Benzer Videolar

🚇 Major Milestone for Metro Line 2B: 252 MT Span Lifted Over Central Railway Tracks in Just Two Hours Between 1 AM and 3 AM on June 14, MMRDA successfully completed the launch of the first composite steel span over the Central Railway corridor between Kurla and Vidyavihar stations on the CSMT–Panvel section. The 54.25-metre-long span, comprising four composite steel girders weighing a massive 252 metric tonnes, was erected within a tight two-hour railway block through meticulous planning and close coordination with Central Railway authorities. The operation involved tandem lifting using two 500 MT hydraulic cranes, backed by a standby crane, and was executed under stringent safety and quality protocols by a dedicated team of 30 engineers and technical staff, along with 100 skilled and unskilled personnel. All statutory approvals and block permissions were secured in advance. From precision fabrication and rigorous quality checks to flawless on-site execution, this achievement reflects MMRDA's commitment to engineering excellence, precision and safety in delivering world-class infrastructure for Mumbai. MMRDA extends its gratitude to Central Railway and all agencies whose coordination and support made this achievement possible. Building the future of mobility, one milestone at a time. #MetroLine2B #MumbaiMetro #MumbaiInMinutes #EngineeringExcellence #RebootingMumbai #ReshapingMMR #BuildingTheFuture CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Central Railway MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 PIB in Maharashtra 🇮🇳

MMRDA

26,640 görüntüleme • 1 ay önce

Major breakthrough for Metro Line 5 - Last Girder Erected at Kapurbawdi junction A result of continuous follow-ups regarding complex land acquisition, and coordinated action across agencies, MMRDA has successfully erected the last girder for Metro Line 5. This milestone reflects MMRDA’s commitment to resolving on-ground challenges and accelerating infrastructure delivery for the Mumbai Metropolitan Region. मेट्रो लाईन ५ वर महत्त्वपूर्ण प्रगतीचा टप्पा पार - कापूरबावडी जंक्शन येथे अंतिम गर्डर उभारणी पूर्ण. भूखंड संपादनासारख्या गुंतागुंतीच्या प्रक्रियेत सातत्यपूर्ण पाठपुरावा आणि विविध यंत्रणांमधील समन्वयाच्या जोरावर एमएमआरडीएने मेट्रो लाईन ५ साठी अंतिम गर्डर यशस्वीपणे उभारला आहे. हा महत्त्वपूर्ण टप्पा एमएमआरडीएच्या प्रत्यक्ष अडचणींवर मात करण्याच्या कटिबद्धतेचे आणि मुंबई महानगर प्रदेशासाठी पायाभूत सुविधा प्रकल्प वेगाने पूर्ण करण्याच्या प्रयत्नांचे प्रतीक आहे. #MumbaiInMinutes #MMRDA #MumbaiMetro #MetroLine5 #InfraMilestone #Girders #RebootingMumbai #MumbaiInMinutes #UrbanMobility #MumbaiInfrastructure #InfraUpdate #MMRDAMovesMumbai #MahaMumbaiMetro #Kapurbawdi #PublicInfrastructure #ReshapingMMR CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR Maha Mumbai Metro Operation Corporation Ltd PIB in Maharashtra 🇮🇳

MMRDA

64,673 görüntüleme • 3 ay önce

A Giant Leap for Mumbai Metro Line 4 - 56m, 450 ton steel span installed overnight Rome wasn’t built overnight — but MMR's progress sure can be! In just one night, MMRDA’s engineering teams installed a 56-meter-long, 450-ton steel span over the busy GMLR (Bhandup–Sonapur) Junction, advancing work on Mumbai Metro Line 4 (Wadala to Kasarvadavali) — now over 84.5% complete. Built with precision under challenging conditions of unseasonal rain, this two-girder steel marvel was lifted and placed seamlessly using 9 high-capacity cranes, 2 multi-axle pullers, and 100+ skilled personnel, ensuring the city never stopped moving. This overnight feat brings Mumbai one step closer to faster, safer, and smarter travel — a shining example of #EngineeringExcellence and the spirit behind #MumbaiInMinutes. We thank all the government authorities and agencies especially Traffic Police Authority, BMC & MSEDCL etc involved for their invaluable guidance and support, which played a crucial role in the successful and safe completion of this challenging work Building Mumbai’s future, one steel span at a time. 💪 #MMRDA #UrbanEngineering #InfrastructureThatInspires #MumbaiMetro #MMRDA50 #MahaMumbaiMetro #MetroLine4 #MumbaiInMinutes #RebootingMumbai #ReshapingMMR #MMRDAUpdates #InfrastructureThatInspires #TransformingMumbai #MetroMilestone #UrbanEngineering #SmartMobility #FutureReadyMumbai #BuildingTheFuture #EngineeringMarvel #CityOfProgress #MumbaiMoving #NextGenInfrastructure #MMRProgress #MegaProjectsOfIndia CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Maha Mumbai Metro Operation Corporation Ltd माझी Mumbai, आपली BMC Mumbai Traffic Police Maharashtra State Electricity Distribution Co. Ltd MAHARASHTRA DGIPR MAHA_UDD - नगर विकास विभाग, महाराष्ट्र Infra News India (INI)

MMRDA

40,011 görüntüleme • 8 ay önce

4 hours. Two massive trusses. One major step forward for Mumbai’s next high-speed road corridor. MMRDA has achieved a major construction milestone on the 13.9-km Elevated Eastern Freeway Extension (EFE), with the successful erection of the two Main Trusses of its Segment Launcher, each 59 metres long and weighing 160 tonnes, on the busy Eastern Express Highway. The entire complex operation was completed within a record 4-hour window, with the actual erection of both trusses taking just 1 hour. The operation was executed through meticulous planning, stringent safety measures and seamless coordination between MMRDA and the Mumbai Traffic Police. So, what happens next? With the Main Trusses now in place, the Segment Launcher will begin erecting 1,632 precast segments, each weighing approximately 90 MT, span by span. These will form the 25-metre-wide single-cell segment superstructure, accelerating viaduct construction and taking the project into its next major phase. And what does this mean for Mumbai? The EFE is a fully elevated, 6-lane high-speed corridor connecting Anand Nagar in Thane with Chheda Nagar in Ghatkopar, designed to create a faster, more reliable route while easing congestion on the Eastern Express Highway, one of Mumbai’s busiest transport corridors. Once completed, the EFE is expected to reduce travel time between South Mumbai and Thane to approximately 20–25 minutes, making everyday journeys faster while strengthening connectivity across the Mumbai Metropolitan Region. Watch 4 hours of precision unfold in minutes. ⏱️ #MMRDA #EasternFreewayExtension #EFE #MumbaiInMinutes #MMRDAMovesMumbai #MumbaiInfrastructure #Mumbai #Thane #ReimaginingMMR #RebootingMumbai #ReshapingMMR CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Maha Mumbai Metro Operation Corporation Ltd MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 PIB India

MMRDA

27,098 görüntüleme • 3 gün önce

The gateway to investment in the Mumbai Metropolitan Region is MMRDA. Under the leadership of Hon'ble Chief Minister Shri Devendra Fadnavis and Deputy Chief Minister and MMRDA Chairman Shri Eknath Shinde - एकनाथ शिंदे, MMRDA is charting an investment horizon of nearly USD 100 billion, shaping the growth story of India's fastest-growing urban agglomeration. We are the only parastatal in the world to have a direct Memorandum of Collaboration with the World Economic Forum. At MMRDA, every project is designed to be bankable. Robust fiscal discipline has enabled us to consistently meet our equity commitments and debt obligations on time, strengthening investor confidence in the institution. Today, we are building the country's second-largest metro network, have commissioned India's longest sea bridge, and will soon deliver a network of seven ring roads across Mumbai, creating the infrastructure backbone for the region's next era of growth. In this special conversation hosted by Columbia Business School and Brookfield, one of the world's leading investment management firms, Dr. Sanjay Mukherjee, IAS, Metropolitan Commissioner, MMRDA, shares how India's largest development authority is building the institutional credibility, financial discipline, and transformative infrastructure needed to power MMR's next phase of growth and position it among the world's most dynamic metropolitan regions. The future is being built today. The future is MMR. Watch Part 1 of this conversation and discover how one of the world's fastest-transforming metropolitan regions is preparing for its next great leap. ▶️ Watch the full interview on YouTube via the link below: #ReimaginingMMR #MMRDA #RebootingMumbai #ReshapingMMR #MumbaiInMinutes #ViksitBharat #ColumbiaBusinessSchool #GlobalMMR #FutureOfCities #UrbanTransformation CMO Maharashtra Dr. Sanjay Mukherjee Columbia University Columbia University_Biz Brookfield Brookfield Properties PIB in Maharashtra 🇮🇳 PIB India MAHARASHTRA DGIPR NITI Aayog MAHARASHTRA DGIPR Maha Mumbai Metro Operation Corporation Ltd

MMRDA

15,213 görüntüleme • 1 ay önce

Major Project Update: Thane Coastal Road hits fast forward In just eight months since construction began, Thane Coastal Road-1 has crossed a major milestone, with over 50% of the foundation work for the elevated viaduct now complete and pier cap and I-girder erection progressing rapidly. 👉 The 13.45 km, six-lane, access-controlled greenfield corridor is being built using cutting-edge engineering. For the first time in India, a greenfield road project is using a single-pile, single-pier system with monopile foundations on land. 👉 Designed as a strategic freight corridor, the project will decongest Ghodbunder Road and improve connectivity between NH-160 (Mumbai–Nashik Highway) and Gaimukh along the Thane Creek coastline, with major stretches on viaducts and bridges to safeguard the sensitive mangrove ecosystem. 👉 At Gaimukh, the road will directly connect with the upcoming Gaimukh–Fountain Hotel Tunnel, enabling seamless Thane–Bhayander connectivity. Together, these projects will significantly decongest Ghodbunder Road, transform urban mobility in Thane, and strengthen freight movement towards Wadhawan Port, JNPT, South Maharashtra, and Karnataka. 👉 The corridor will also integrate with key future infrastructure projects including the Thane Ring Metro, Thane Coastal Road-2, the Saket–Amane Elevated Corridor, and the Kasarvadavali–Kharbhav Road, cementing its role as a critical backbone of the region’s next-generation transport network. #ThaneCoastalRoad #MMRDA #InfrastructureIndia #ReimaginingMMR #TransformingMMR #UrbanMobility #BuildingTheFuture #MumbaiMetropolitanRegion #MegaProjects #Maharashtra #TransportInfrastructure #FastForward CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR PIB India Infra News India (INI) Indian Tech & Infra Thane Municipal Corporation - ठाणे महानगरपालिका

MMRDA

26,177 görüntüleme • 5 ay önce

Mumbai's Shunya is rising. Centuries ago, Aryabhata introduced the world to Shunya, a simple yet revolutionary idea that transformed mathematics, science and our understanding of the universe. Today, inspired by that timeless legacy, Mumbai is building a landmark unlike any other. Rising above the Vakola Nallah, the Shunya Bridge is steadily taking shape. A key part of Mumbai Metro Line 2B, this iconic structure will serve as both a critical transport link and a symbol of engineering excellence. With the iconic zero-shaped pylon now complete, construction has advanced to the bridge's back span, where 11 of the 12 precast segments have already been erected and cast-in-situ works are progressing steadily. The next milestone will be the bridge's defining 80-metre main span, the critical link that will complete the iconic structure and bring this vision to life. Every segment launched. Every weld perfected. Every milestone achieved brings Mumbai's newest landmark one step closer to reality. A tribute to India's scientific legacy. A landmark for generations to come. A symbol of how timeless ideas continue to inspire modern engineering. Connecting not just places, but the past, present and future. Mumbai's Shunya is rising. #MMRDA #ShunyaBridge #EngineeringExcellence #Metro2B #MumbaiInMinutes #ReimaginingMMR #MumbaiInfrastructure #IndiaBuilds CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR PIB India Ministry of Housing and Urban Affairs

MMRDA

33,105 görüntüleme • 1 ay önce

Mumbai 3.0, India’s Next Investment Frontier, Takes Centre Stage at WEF 2026 At the World Economic Forum 2026, Hon’ble Chief Minister of Maharashtra Shri Devendra Fadnavis announced a focused push to attract global investments into Mumbai 3.0, a next-generation city being developed by the MMRDA, envisioned to be three times the size of Mumbai. Backed by transformative infrastructure including the Navi Mumbai International Airport, the Atal Setu, and integrated multimodal connectivity, over 675 sq km of new urban area is being opened up, forming one of India’s largest future-ready urban agglomerations. Also known as KSC New Town, Mumbai 3.0 is planned as a thematic global city focused on Ease of Living and Ease of Doing Business. It will comprise Edu City, Medi City, Sports City, Innovation City and GCC (Global Capability Centre) City, positioning the MMR as a global investment hotspot for new-age businesses. With a strong pipeline for employment generation, FDI inflows and sustainable growth, Mumbai 3.0 is set to power India’s next economic leap. Under the leadership of the Hon’ble Chief Minister and the guidance of Deputy Chief Minister and MMRDA Chairman Shri Eknath Shinde, we remain committed to transforming the Mumbai Metropolitan Region into a globally competitive economic powerhouse, while delivering world-class urban living for its citizens. #WEF2026 #MahaAtDavos #DevendraFadnavis #MMRDAAtDavos #Mumbai3_0 #NextGenCity #FutureOfUrbanIndia #BuildingTomorrow #ThirdMumbai #WorldClassInfrastructure #CityOfOpportunities #CityOfTheFuture #ReimaginingMMR #RebootingMumbai #ReshapingMMR #MMRDA50 Devendra Fadnavis CMO Maharashtra Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee World Economics MAHARASHTRA DGIPR Maha Mumbai Metro Operation Corporation Ltd

MMRDA

41,953 görüntüleme • 6 ay önce

A Century on Track. The Orange Line is rising. Mumbai’s Metro Line-12 – Orange Line Extension, being built by MMRDA, achieved another major construction milestone with the successful launch of its 100th U-girder near Dombivli MIDC Metro Station on Shilphata Road. The 23.57-km fully elevated corridor with 19 stations will deliver seamless, eco-friendly connectivity between Kalyan, Dombivli, Taloja and the Navi Mumbai International Airport. With this milestone, the project enters a faster execution phase, paving the way for quicker, cleaner and eco-friendly mobility between Thane and Navi Mumbai, while driving transit-oriented development across the Kalyan–Taloja belt. Running parallel to the Kalyan–Shilphata–Taloja corridor and integrating with the MSRDC Flyover for 7 km, the alignment will feature several engineering marvels including 100-metre clear spans near Kolegaon, critical Railway and ROB crossings, and high-rise station construction at 21–23 metres. Seamless interchanges will link commuters to Metro Line-5 at Kalyan, Metro Line-14 at Hedutane, and Navi Mumbai Metro Line-1 at Amandoot, with direct FOB integration to Central Railway at Kalyan Junction. The project is targeted for completion by May 2028. Progress so far: ✔️Survey and alignment for Kalyan–Manpada completed ✔️ First pile, pier cap and U-girder successfully cast and erected ✔️ Batching plant operational for full-scale construction ✔️Civil works and pier construction progressing along key stretches ✔️Land acquisition and R&R underway near Patripul and Amandoot Special spans: 54 m — APMC Kalyan Market | 56 m — Regency Anantam Chowk | 65 m (2 spans) — Central Railway ROB, Patripul | 75 m — Taloja ROB (steel superstructure) |100 m — Virar–Alibaug Multimodal Corridor near Kolegaon Building tomorrow’s MMR, one girder at a time. #MetroLine12 #OrangeLineExtension #MMRDA #MahaMumbaiMetro #OnTrack100 #Kalyan #Dombivli #Taloja #NaviMumbai #Thane #InfrastructureIndia #ReimaginingMMR #TransformingMMR #EngineeringExcellence #UGirderLaunch #ElevatedCorridor #SeamlessConnectivity #GreenMobility #FutureReadyMMR #MMRDA50 #ReimaginingMMR #TransformingMMR #MumbaiInMinutes #RebootingMumbai #ReshapingMMR #ProjectUpdates CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR

MMRDA

13,698 görüntüleme • 7 ay önce

The Kasheli Depot, the operational backbone of Mumbai Metro Line 5, is steadily taking shape with 23% overall physical progress achieved as of June 2026. Spread across approximately 27 hectares near Kasheli Toll Plaza, the depot is being developed to support the long-term operations, maintenance and stabling requirements of the 32 km Thane–Bhiwandi–Kalyan–Ulhasnagar Metro corridor. Designed to accommodate around 30 trainsets, the facility will include inspection bays, workshop lines, a test track, a Depot Control Centre, administrative facilities, staff quarters, utility infrastructure and advanced maintenance systems. Given the site's challenging marine clay conditions, #MMRDA has adopted advanced ground improvement techniques in consultation with #IITBombay to ensure long-term structural stability. At the same time, temporary inspection, testing and commissioning facilities are being developed to support the phased rollout and early operational readiness of #MumbaiMetro Line 5. As construction progresses, the Kasheli Depot is set to become the technical and operational hub that will power safe, reliable and efficient metro services across Thane, Bhiwandi, Kalyan and Ulhasnagar. Hon'ble Chief Minister Shri Devendra Fadnavis said, "The Kasheli Depot reflects Maharashtra's commitment to building modern and reliable public transport infrastructure. Metro Line 5 will strengthen connectivity across Thane, Bhiwandi, Kalyan and Ulhasnagar while advancing our vision of a developed, well-connected Maharashtra." Hon'ble Deputy Chief Minister and Chairman, MMRDA, Shri Eknath Shinde - एकनाथ शिंदे said, "The Kasheli Depot will be central to the safe and efficient operation of Metro Line 5. Its steady progress brings the Mumbai Metropolitan Region closer to faster, reliable, and high-capacity public transport connectivity." #ReimaginingMMR #MMRDA #KasheliDepot #MetroLine5 #UrbanMobility #MahaMumbaiMetro #Infrastructure #MumbaiMetro #TransformingMMR #Infrastructure #MumbaiMetro CMO Maharashtra Dr. Sanjay Mukherjee MAHARASHTRA DGIPR PIB India PIB in Maharashtra 🇮🇳

MMRDA

12,723 görüntüleme • 6 gün önce

Sewri-Worli Elevated Connector: Transforming Mumbai’s Connectivity! Mumbai’s traffic dynamics are set to change with the Sewri-Worli Elevated Connector, a crucial part of MMRDA’s traffic dispersal system for Atal Setu. This 4.5 km, 4-lane elevated corridor will directly link Atal Setu to Bandra-Worli Sea Link and the Mumbai Coastal Road project, creating a seamless travel experience across the city. 🔹 Enhanced Connectivity: Navi Mumbai commuters heading to Central & South Mumbai *and western suburbs* will benefit from a signal-free, time-saving route. 🔹Traffic : Expected to add about 15-20% vehicular traffic from Bandra-worli and Mumbai Coastal road to Atal Setu, increasing the toll revenue on Atal Setu. 🔹 Engineering Feat: A double-decker Road Over Bridge (ROB) at Prabhadevi Station, crossing both Central & Western Railway lines, *will be constructed* using an advanced Push-Pull method for maximum safety. ✅ Current Progress: 60% work completed. Key Challenge: Assembling & erecting a 3000 MT heavy steel superstructure over railway tracks while ensuring commuter safety. This ambitious project is not just about infrastructure—it’s about connecting lives, reducing commute times, and making Mumbai’s transport network more efficient than ever! Dr. Sanjay Mukherjee #SewriWorliConnector #AtalSetu #MumbaiInfrastructure #SeamlessTravel #MMRDA #MumbaiTrafficSolutions #MMRDA50 #CelebrationOfDevelopment #RebootingMumbai #ReshapingMMR #MMRDA #AtalSetu #MTHL #Mumbai #MetroRegion #EfficientConnectivity #EcoFriendlyTransport #TransformingMumbai #MumbaiInMinutes

MMRDA

19,615 görüntüleme • 1 yıl önce

Urban working. Suburban living. Mumbai in Minutes. That is the future unfolding across the Mumbai Metropolitan Region. This isn't just about building infrastructure. It is about transforming the way millions of people live, work and travel. Imagine living in Thane, Vasai, Virar or Navi Mumbai while reaching your workplace in Nariman Point or BKC in a fraction of the time it takes today. That is the transformation being enabled by India's second-largest Metro network, Asia's largest sea bridge, the Mumbai ring roads network, the integrated Paatal Lok Tunnel Network, the Mumbai–Ahmedabad Bullet Train corridor, and a host of next-generation mobility projects. In this special conversation hosted by Columbia Business School, Columbia University, New York, and Brookfield, one of the world's leading investment management firms, Dr. Sanjay Mukherjee, IAS, Metropolitan Commissioner, MMRDA, shares why this vision extends far beyond infrastructure. It is about creating a world-class Mumbai Metropolitan Region, where connectivity expands opportunity, every project improves quality of life, and urban working and suburban living become the defining rhythm of a future-ready metropolis. At the heart of this transformation lies Mumbai 3.0—a fourth-generation, greenfield city designed to attract the industries of tomorrow, from artificial intelligence and data sciences to semiconductors, while placing social infrastructure, sustainability and environmental responsibility at the centre of development from day one. As MMRDA helps reshape the MMR, it is also preparing concrete, science-led initiatives to address climate change and build a greener, more resilient and world-class metropolis for generations to come. The future is Maharashtra. Within Maharashtra, the future is MMR. Watch Part 2 of this conversation and discover how one of the world's fastest-transforming metropolitan regions is preparing for its next great leap. ▶️ Watch the full interview on YouTube via the link below. CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Brookfield Properties Ministry of Housing and Urban Affairs NITI Aayog FICCI PIB in Maharashtra 🇮🇳 PIBIndia #MMRDA #ReimaginingMMR #DrSanjayMukherjee #MumbaiInMinutes #RebootingMumbai #GlobalMMR #ViksitBharat #InfrastructureIndia

MMRDA

65,829 görüntüleme • 12 gün önce

A huge mobility leap for the Mumbai Metropolitan Region. India’s largest and longest urban road tunnel, the Thane–Borivali Twin Tunnel Project, has just crossed a historic milestone. MMRDA has successfully completed the Thane-side portal excavation and lowered the 13.34-metre single-shield Tunnel Boring Machine cutterhead, the largest ever deployed in India for an urban infrastructure project. This milestone signals the start of the actual tunnelling phase of this pathbreaking project. The 11.8-kilometre underground twin tunnel will seamlessly connect Thane’s Ghodbunder Road with the Western Express Highway in Borivali, cutting travel time from 60–90 minutes to just 15 minutes, and redefining how lakhs of Mumbaikars move. Passing beneath the eco-sensitive Sanjay Gandhi National Park, the tunnels are being built using the most advanced TBM technology to ensure safe, efficient and eco-friendly construction with minimal ground disturbance. Each tunnel will feature three lanes, including a dedicated emergency lane, with cross-passages every 300 metres. The tunnels will be equipped with advanced ventilation systems, modern firefighting equipment, smoke detectors and illuminated LED signboards. Once completed, this landmark project will drastically reduce travel time, ease congestion, lower emissions and deliver a faster, cleaner and smarter commute for citizens. The successful lowering of the TBM cutterhead is not just an engineering achievement. It is proof that Mumbai is ready to take on the most complex underground mobility challenges, head-on. Through projects like the Thane–Borivali Twin Tunnel, MMRDA is reimagining and redefining mobility in the MMR. #MMRDA #TransformingMMR #ReimaginingMMR #TwinTunnelProject #HistoricMilestone #LargestTunnel #MMRDA50 #LargestTBM #ThaneBorivaliTunnel #TunnelBoringMachine #TunnelSafety #MumbaiMatters #UrbanDevelopment #MumbaiInMinutes #ReshapingMMR #RebootingMumbai #MumbaiInfrastructure #UrbanMobility #SmartTransport CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee PIB India MAHARASHTRA DGIPR

MMRDA

14,733 görüntüleme • 7 ay önce

Mumbai, the wait is almost over. A brand-new, safer, smarter, and smoother Monorail will soon be at your service. We’re proud to share that the Monorail has secured the mandatory safety certification for its new rolling stock and the CBTC-based signalling system from the Independent Safety Assessor, Bureau Veritas, a global leader in testing, inspection, and certification. This is a massive milestone and brings us one step closer to opening the upgraded Monorail for public use. The next step will be the appointment of a retired Commissioner of Metro Rail Safety official to carry out a comprehensive inspection of the entire 19.54 km Monorail corridor and to grant the final statutory clearance to resume passenger operations. This process is also expected to be completed soon, after which the new, improved Monorail will be back in action for Mumbai. The ISA certification was granted after the successful completion of several critical milestones, including: ✔️ Detailed inspection of the new rolling stock at the manufacturing facility ✔️ Rigorous testing across sections of the Monorail corridor over two months to assess operational readiness ✔️ Extensive static and dynamic testing to ensure full compliance with design specifications and the highest safety standards ✔️ Completion of oscillation trials ✔️ Installation and interface-level testing of the advanced CBTC-based signalling system The new 'Made In India' Monorail rakes come with 21 modern upgrades, including CCTV cameras inside every train, Divyang-friendly seats, mobile and laptop charging points, dynamic route maps, improved suspension for smoother rides, fire-safety compliant design, modern metro-style interiors, and real-time monitoring and surveillance systems. We remain committed to delivering a safer, smarter, and more reliable Monorail service to Mumbaikars very soon. #MumbaiMonorail #BackOnTrack #MonorailReturns #BetterThanBefore #SaferSmarterSmoother #UpgradedForYou #MadeInIndia #MMRDA #MahaMumbaiMetro #PublicTransport #MumbaiInMinutes CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee Rubal Agarwal Maha Mumbai Metro Operation Corporation Ltd MAHARASHTRA DGIPR PIB in Maharashtra 🇮🇳 Indian Tech & Infra Infra News India (INI)

MMRDA

27,707 görüntüleme • 5 ay önce

Big milestone for Mumbai’s Underground Mobility Project: Orange Gate–Marine Drive Tunnel Begins Main Drive The Orange Gate–Marine Drive Road Tunnel, one of India’s most complex urban road tunnelling projects, has reached another historic milestone with the main tunnelling drive now officially underway. This is a pivotal moment for Mumbai’s underground mobility network. Purpose-built for Mumbai’s challenging coastal geology, the Tunnel Boring Machine — India’s largest slurry shield TBM for an urban road tunnel — achieved a crucial breakthrough recently, and has since advanced rapidly, excavating an impressive 70 metres within a few days. Hon’ble Chief Minister Shri Devendra Fadnavis and Hon’ble Deputy Chief Minister & MMRDA Chairman Shri Eknath Shinde had launched the TBM on December 3, 2025. The project involves the construction of twin tunnels spanning over 7 km. The first tunnel, currently under construction, extends 3.45 km, reaching depths of up to 52 metres, while passing beneath the Central and Western Railway corridors and Mumbai Metro Line 3 with exceptional safety and engineering precision. Once complete, the project will reduce travel time between Orange Gate and Marine Drive to just 5 minutes, enabling seamless East-West connectivity, direct integration with the Coastal Road and Atal Setu, and significantly reducing congestion, fuel consumption and emissions. Following the launch, the project has achieved several key milestones, including the lowering of the backup system unit of the TBM and connecting it to the TBM shield, before successful completion of the initial tunnelling drive. It has now commenced the main drive operations. Progressing rapidly December 3, 2025: ✔️ TBM launched December, 2025- January 2026: ✔️ Backup system unit lowered and connected to the TBM shield ✔️ Hydraulic and electrical connections completed ✔️ Flowmeters, densitometers, pressure sensors calibrated ✔️ Probe drill unit installed and tested January 8, 2026: ✔️ Initial drive begins; temporary rings erected. January 26, 2026: ✔️ Permanent rings erection begins January 31, 2026: ✔️ Initial drive completed February 26, 2026: ✔️ Transition to main drive completed February 28, 2026: ✔️ Main drive operations commence. TBM Mining Progress (March 26, 2026): ✔️ 70 m excavated out of 3,720 m #MumbaiInMinutes #MMRDA #ReimaginingMMR #UrbanRoadTunnel #OrangeGateTunnel #DiggingDeep #OrangeGateToMarineDrive #UrbanTunnel #UndergroundMobility #MegaProject #TransformingMMR #MumbaiInMinutes #UrbanInnovation #InfrastructureForFuture #RebootingMumbai #ReshapingMMR #SmartMobility Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे MAHARASHTRA DGIPR Dr. Sanjay Mukherjee

MMRDA

26,702 görüntüleme • 3 ay önce

Redefining Connectivity: Mumbai’s Journey Towards Integrated Mobility Delighted to inaugurate, flag off, and unveil the stone plaque of 'Metro Line 9: Dahisar (East) to Kashigaon (Phase-1)', ‘Metro Line 2(B) Deshbhakt N. G. Acharya Udyan - Diamond Garden to Maharashtra Nagar, Mandale (Phase-1), and e-Bhoomipujan of the Automated Rapid Transit System (Pod Taxi) Project for Bandra-Kurla Complex, and the launch of 'Tunnel Boring Machine - Nayak' for the 'Thane-Borivali Underground Tunnel Project' in Mumbai, marking a significant step towards seamless connectivity and transformative urban mobility. Metro services have commenced today on the 4.7 km corridor from Dahisar East to Kashigaon, with four stations along the route, enhancing connectivity and making travel between Mumbai and Mira-Bhayandar faster and more convenient. This project, with an investment of approximately ₹6607 crore, will reduce the current travel time from 1-2 hours to nearly 30 minutes. In the upcoming phases, this corridor will be integrated with Metro Line 3, enabling seamless travel from Mira-Bhayandar to Colaba. With over 100 kilometres of metro lines now operational, Mumbai has emerged as the second-largest metro network in the country after Delhi. In the coming years, the network will expand further with the completion of several ongoing projects, strengthening connectivity across the city. The first phase of Metro Line 2B, spanning 5.6 km with five stations, is now operational from today. Once the rest of the phases are fully completed, this transformative project will seamlessly connect the East-West and North-South corridors, enabling smoother and more efficient travel across the city. Notably, this will be the first metro line to connect with the Harbour Line, marking the beginning of a new chapter in Mumbai’s integrated urban transport network. The e-Bhoomipujan of the innovative ‘Pod Taxi’ project was undertaken in the BKC area, marking a significant step towards strengthening last-mile connectivity. This automated system will enable commuters to reach within 100–150 metres of their destinations, enhancing convenience and efficiency. The Thane-Borivali Twin Tunnel Project is a landmark initiative that will significantly decongest Mumbai and Thane cities. Spanning 11.84 km, including a 10.25 km twin tunnel stretch, this transformative corridor is designed for efficiency and safety, featuring two traffic lanes and one emergency lane in each tunnel. The tunnels are being constructed in a safe, efficient, and eco-friendly manner, keeping in mind the ecological sensitivity of the Sanjay Gandhi National Park. DCM Eknath Shinde ji, DCM Sunetratai Pawar, Minister Mangal Prabhat Lodha ji, Minister Adv. Ashish Shelar, Minister Pratap Sarnaik, MP Naresh Mhaske, Mumbai Mayor Ritutai Tawde, MLC Pravin Darekar, MLC Niranjan Davkhare, MLA Sanjay Kelkar, Thane Mayor Sharmilatai Pimpalolkar-Gaikwad, MLA Mangesh Kudalkar, MLA Tukaram Kate and other dignitaries were present. Eknath Shinde - एकनाथ शिंदे Sunetra Ajit Pawar Mangal Prabhat Lodha Adv. Ashish Shelar - ॲड. आशिष शेलार Pratap Baburao Sarnaik Ritu Tawde Niranjan Davkhare Sanjay Kelkar Mangesh Kudalkar - मंगेश कुडाळकर Tukaram Kate MMRDA Maha Mumbai Metro Operation Corporation Ltd #Maharashtra #MumbaiInMinutes #MMRDAMovesMumbai

Devendra Fadnavis

16,998 görüntüleme • 3 ay önce

MMRDA Begins Resurfacing Works on Atal Setu for Enhanced Durability & Riding Comfort The Mumbai Metropolitan Region Development Authority (MMRDA) has initiated comprehensive resurfacing and pavement restoration works on the Atal Setu, ensuring long-term strength and superior riding comfort for commuters. To avoid complete closure of the bridge, the work is being carried out in phases. The third and fourth lanes will be resurfaced first, and once completed, the remaining two lanes will be taken up. After observing pavement distress in certain localised stretches on the Navi Mumbai–bound carriageway, starting at the 10.4 km mark, mainly on the outer heavy-vehicle lanes, MMRDA conducted a detailed technical review. Temporary rectification using mastic asphalt was carried out during the monsoon to maintain smooth traffic flow and ensure commuter safety. Now that the monsoon has subsided, full-fledged resurfacing operations have commenced. The works are being executed under the expert guidance of IIT Bombay, covering every stage — from material selection and mix design to plant-level and on-site quality control. Since the project is still under the defect liability period, the entire cost will be borne by the contractor. MMRDA remains committed to maintaining world-class standards of quality, safety, and durability on the Atal Setu — ensuring a safe, seamless, and smooth driving experience on India’s longest sea bridge. We thank all commuters for their cooperation and regret the inconvenience caused during the resurfacing works. #TransformingMMR #RebootingMumbai #ReshapingMMR #MumbaiInMinutes #MMRDA #MMRDA50 #ViksitMumbai4ViksitBharat #FutureReadyMumbai #RebootReshapeReconnect #MumbaiInfrastructure #InvestInMMR #MMRProgress #BuildingTheFuture #SmartInfrastructure #UrbanTransformation #VisionMMR Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee PIB in Maharashtra 🇮🇳

MMRDA

540,967 görüntüleme • 8 ay önce