正在加载视频...

视频加载失败

Inspector Failed My Final Inspection😯👷

221,006 次观看 • 4 个月前 •via X (Twitter)

35 条评论

mcfly85 的头像
mcfly854 个月前

those straps are the least of your problems in this build

Second Sight 的头像
Second Sight4 个月前

You have build 200 stairs wrong

FUGIO1787WEAREONE 的头像
FUGIO1787WEAREONE4 个月前

Thank god you didn’t build anything for me, family, or friends.

Sameer Munawar 的头像
Sameer Munawar4 个月前

Every hole in those straps needs a nail manufacturer spec, no shortcuts on stairs. Inspector did the job right. Fill 'em all next time.

4ev0er9 的头像
4ev0er94 个月前

Ummmmm seriously 🤔?the stringer should butt up against the header. And rest into a hanging bucket..

MickM1911 的头像
MickM19114 个月前

The size of that knot in the stringer is also questionable

DawktorX 的头像
DawktorX4 个月前

200 bad decks. That hole is there for a reason lol

Not So Wild Anymore Bill 的头像
Not So Wild Anymore Bill4 个月前

I would hypothesize that adding nails there is bound to split the wood and possibly detract from the overall joint strength. I've had my fair share of run-ins with inspectors that only count fasteners.

Randall T... 的头像
Randall T...4 个月前

4 Problems here: No nails in some holes. Knot and dark striations compromise integrity. Used hacksaw to cut wood? Pakistani account.

Nick Werner 的头像
Nick Werner4 个月前

Will it work, yeah. Will it pass, no. The difference is liability, the manufacturer states every hole gets filled. If he passes a build with one missing, then the inspector assumes liability.

James Delgado 的头像
James Delgado4 个月前

If an inspector says it needs a nail to pass his inspection… put a fucking nail there and quit your bitching.

Frizzman DeFryguy 的头像
Frizzman DeFryguy4 个月前

as a deck builder of over 30 yrs, thats a def shit job and deserved to fail. that is not how steps are constructed

Nigel Hutton 的头像
Nigel Hutton4 个月前

Yeah not the right strap, Needs a Ledger and a hanger

ΙΙঝীهقⱭ 的头像
ΙΙঝীهقⱭ4 个月前

You know full well all nail holes in a hanger, need a nail to pass.

Russ 的头像
Russ4 个月前

When there is disagreement, pull the code, look at the manufacturer’s instructions. If plans were drawn and sealed by a licensed engineer there should be details showing installation as well. If all requirements are followed then inspection should pass.

PNW LSR 的头像
PNW LSR4 个月前

Obviously you didn't use every hole as specified by manufacturer and if you weren't such an ass, the inspector would have said put a nail in it, send me a picture, and ill pass it. Just like every inspector I've dealt with. Respect goes a long way.

Victor 的头像
Victor4 个月前

I'd just nail a 2x8 to the beam over the straps as a hanger. That should satisfy the inspector.

Jack 的头像
Jack4 个月前

Not the way I'd do it.

Nine Iron 的头像
Nine Iron4 个月前

Those stringers could almost be upside down. Top of the stringer should be resting on the header or platform. Looking at how the top was cut it should have framed directly into the header with a bucket at a minimum

Brad Arnold 的头像
Brad Arnold4 个月前

Inspector has no engineering skills apparently, bc those straps aren't going to break, or move as they are.

Nathan 的头像
Nathan4 个月前

Put a nail in it then

GHOST__194 的头像
GHOST__1944 个月前

Just put the nail in. Stop complaining

crispy 的头像
crispy4 个月前

Surprised you haven't killed someone yet.

tom hagen 的头像
tom hagen4 个月前

Shitty detail to start with.

hzhsjhdvbsh 的头像
hzhsjhdvbsh4 个月前

Stringer should be resting on top of solid framework, you are relying on these straps to hold the weight of the stairs with nails instead of screws which will waggle loose with movement.

IM12DV8 的头像
IM12DV84 个月前

No... because you are hanging weight carrying pieces from the support vs resting them on them. You're whole config is super stupid.

WeSpottedThem14Points 的头像
WeSpottedThem14Points4 个月前

He's built so many then why is he confused? The stringers are cut wrong.

I agree with me 的头像
I agree with me4 个月前

I don’t build decks and am not an engineer, but isn’t all the weight of those steps resist on those straps? Shouldn’t there be a support under those stringers that transfers the weight into 4x4 or 6x6 columns? This just looks way too shady for my untrained eye.

facts matter, lies shatter 🇳🇱 🇺🇸 的头像
facts matter, lies shatter 🇳🇱 🇺🇸4 个月前

It's called redundancy. Don't cheap out on nails. It also triggers OCD. Also the wood looks split. I'm siding with the inspector.

@devonboy3410 🏴󠁧󠁢󠁥󠁮󠁧󠁿🏴󠁧 的头像
@devonboy3410 🏴󠁧󠁢󠁥󠁮󠁧󠁿🏴󠁧4 个月前

Taking shortcuts on the safety specs is fine with this builder. I wouldn’t employ you with an “I don’t give a fuck” attitude. Yes, it’s only one nail, so why didn’t you do it? It’s 30 seconds of work.

Jon Demo 的头像
Jon Demo4 个月前

And that nail has a chance of splitting the wood

Nick 的头像
Nick4 个月前

Just put the fucking nail in there buddy

Kmorrill🟦⬜️🟩 的头像
Kmorrill🟦⬜️🟩4 个月前

How you do anything, is how you do everything.

Jelly Bean Jerry 的头像
Jelly Bean Jerry4 个月前

Its 2026. At this point everyone knows that things attached to your house has to be built by the book. Hes acting like they JUST made these rules.

sallad tattoos 的头像
sallad tattoos4 个月前

why hole if no nail

相关视频