Загрузка видео...

Не удалось загрузить видео

На главную

$IREN owns and develops large-scale, power-dense data center campuses in energy-rich regions for AI cloud, GPU clusters and build-to-suit data centers. Today’s 800MW Australia announcement reinforces the thesis that IREN can turn massive power capacity into AI infrastructure revenue faster than the market expected.

164,255 просмотров • 1 месяц назад •via X (Twitter)

Комментарии: 0

Нет доступных комментариев

Здесь появятся комментарии из оригинального поста

Похожие видео

$IREN BELOW $100 is STEAL !!! ✅ Chamath recently said that building 1 GW of AI data center capacity today can cost around $100 billion. Whether the number ends up being $80B, $100B, or somewhere in between isn’t the main takeaway. The takeaway is this: Power-ready AI infrastructure has become one of the most valuable assets on the planet. Now look at what IREN already controls: Sweetwater, Texas — 2.0 GW Childress, Texas — 750 MW Oklahoma — 1.6 GW South Australia — 800 MW Spain (Nostrum) — 490 MW Prince George, Mackenzie & Canal Flats — Existing AI cloud infrastructure Total portfolio: 5.8 GW of secured power capacity. What excites me most is what should be energized by 2026: ⚡ Sweetwater Phase 1 (~1.4 GW) ⚡ Childress (750 MW) ⚡ Prince George & Mackenzie continuing to scale AI cloud operations That’s already ~2.1+ GW of energized AI infrastructure either operating or coming online. Using Chamath’s framework: 2 GW = ~$200 billion of replacement value Yet IREN trades around a $18-20 billion market cap Even if Chamath is off by 50%, you’re still looking at a valuation gap that is hard to ignore. The market is pricing IREN like a miner. The bull case is that it’s becoming a large-scale AI infrastructure platform. By math alone, if ~2 GW is energized and available for AI workloads by 2026, a $100B+ market cap doesn’t seem crazy. That would imply a stock price potentially in the $150-$250 range, based solely on the value of the energized AI infrastructure—not even giving full credit to the remaining 3.7+ GW in the portfolio. 🤯🤯🤯 This is why I believe the market is dramatically underestimating what IREN is building. ✅ Gigawatts of power ✅ Strategic land positions ✅ Grid access ✅ Permits & approvals ✅ AI-ready infrastructure

investing

78,823 просмотров • 22 дней назад