Video wird geladen...

Video konnte nicht geladen werden

Zur Startseite

KENYA IS UNDER CONSTRUCTION; President Ruto talked about Funyula affirdable housing & its TRUE almost 50% complete directly employing more that 250 Kenyans.

12,373 Aufrufe • vor 9 Monaten •via X (Twitter)

0 Kommentare

Keine Kommentare verfügbar

Kommentare vom Original-Post werden hier angezeigt

Ähnliche Videos

UNDER THE WATCHFUL EYES OF PRESIDENT TINUBU, CHIEF OF ARMY STAFF DELIVERS ON 1,000 ARMY HOUSING UNITS AT PRESIDENT BOLA AHMED TINUBU BARRACKS PHASE2 ABUJA. The inspection began with a warning that the road was slippery, the terrain undulating and very hilly and that mud would be our companion. Major General Adetoro who led us on the inspection tour of the project in Asokoro forgot to tell us that we are about to witness was an unprecedented project ever done by any President. But President Tinubu did it. As our cars tore through the graded road , the sheer amount of earth work that was cleared to make way for the housing project is impressive. Sitting in a value, embedded in the surrounding hills, sat the 1,000 housing units of the Bola Tinubu Barracks Phase II housing project. Capacity for 6,000 residents, housing for different cadre, over 5,000 Skilled and unskilled workers, barely 9 months with a delivery date of December 2026. *On 24 December 2025, the Army Chief performed the groundbreaking for Phase II of the Bola Ahmed Tinubu Barracks*. The project is distinct from Phase I, commissioned by President Bola Ahmed Tinubu, GCFR, on 23 January 2025 and designed to accommodate 614 personnel. Phase II is a new barracks development, projected to house about 1,000 personnel and their families. It is the largest single housing intervention of its kind in the capital under the current Army leadership and a direct response to a long-standing accommodation deficit. *COAS Shaibu has described the project as a shift from short-term repairs to durable housing.* At the flag-off, he thanked the President for funding and political support, and linked the barracks to operational readiness. Decent, secure accommodation, he argued, strengthens morale, family stability and unit cohesion. As operations evolve and troops return from the field, the new barracks is intended to receive them with dignity rather than uncertainty. *1.000 HOUSING UNITS* The housing drive is wider than one site. General Shaibu has ordered the completion of ongoing residential projects nationwide, approved two 30-family blocks in each Army division as an interim measure, and continued renovation of existing barracks. Welfare, in his formulation, also includes healthcare, education, insurance, family support and post-service housing. Phase II is therefore not an isolated construction site; it is a visible pillar of a broader “*Soldier First” agenda*. *For the Nigerian Army, barracks are infrastructure as well as welfare*. A force that is properly housed is better placed to maintain discipline, readiness and cohesion. Phase II of the Bola Ahmed Tinubu Barracks is an investment in that infrastructure — and in the families who stand behind every deployment. The project’s meaning is captured in a single line that now defines the effort: building homes for those who defend the nation. *Under Lieutenant General *Waidi Shaibu, that line is being written in brick and mortar in Abuja. APC Nigeria President Bola Ahmed Tinubu Media Centre Apc_UKyouth

Sunday Dare,CON, Ph.D

28,854 Aufrufe • vor 2 Tagen

They told us Rigathi Gachagua had to go because he spoke about shares in government. They told us that language was dangerous. They told us it was tribal. They told us it was a crime against the republic. Now Oburu Odinga stands comfortably in public and talks about “our share in government.” No outrage. No impeachment threats. No sermons about national unity. Suddenly, shares is not a crime it’s strategy. That hypocrisy stinks. Gachagua did not invent tribal arithmetic in Kenya. He only said out loud what Ruto and ODM whisper in boardrooms and practice daily. He said loyalty matters. He said sacrifice deserves recognition. For that honesty, he was crucified. Meanwhile, as Kenyans choke under corruption, collapsing hospitals, broken schools, unbearable taxes, police brutality, joblessness, and a dying economy the political elite are not talking solutions. They are counting shares. They are dividing the country like loot after a robbery. And now you want me Paul Ouma Neko to hate Rigathi Gachagua? To fight Kikuyus? To become a useful tribal idiot so William Ruto can sleep peacefully at State House? Absolutely not. Ruto has turned Kenya into a marketplace of betrayal. He uses communities, dumps them, then hires others to attack the abandoned ones. ODM, once the voice of resistance, has become a rental opposition loud during campaigns, silent in government, greedy at the table. Today it’s “Luo share.” Yesterday it was “Kikuyu turn.” Tomorrow it will be another community. But the suffering Kenyan remains constant. Rigathi Gachagua’s real crime was not tribalism. His crime was refusing to lie. He exposed the system and the system punished him. To hell with tribal arithmetic. To hell with political shares. To hell with leaders who reduce citizens to voting blocks and ethnic bargaining chips. Kenya does not need shares. Kenya needs justice. Kenya needs leadership. Kenya needs accountability. Stop gaslighting the masses. Stop weaponizing tribes to protect a failed presidency. Stop pretending outrage only when it suits you. The problem is not Rigathi Gachagua. The problem is William Ruto and a political class that feeds on division while the country bleeds. Kenyans, wake up. Refuse to be rented. Refuse to be divided. Refuse to hate each other so thieves can rule longer. Enough is enough.

𝙋𝘼𝙐𝙇 𝐍𝐄𝐊𝐎

12,986 Aufrufe • vor 8 Monaten

🇺🇦🇷🇺Ukrainian SBU kamikaze drones strike two Russian military support ships under construction and S-400 air defense elements at Kerch’s Zaliv shipyard in occupied Crimea. 🇺🇦🎯 The Security Service of Ukraine’s kamikaze drones struck two Russian military support ships under construction at the “Zaliv” shipyard in occupied Kerch, as well as elements of the S-400 air defense system that were defending the Kerch Strait 🗣️ According to the SBU, the targets included Project 15310 “cable-laying” ships “Volga” and “Vyatka”, as well as the cargo-passenger ferry “Petropavlovsk”, whose construction was reportedly 96% complete. As a result of the strikes, strong fires broke out on the ships. 🚢 Project 15310 “Volga” and “Vyatka” are military special ships built for the Russian Ministry of Defense. Construction of both began in 2015. “Vyatka” was launched in 2020, and “Volga” in 2021. Both ships are still under construction at the “Zaliv” shipyard in occupied Kerch. 🔹 The 140-meter, 10,000+ ton ships are intended for the deployment of Russia’s underwater surveillance network — “Harmony”. ⛴️ “Petropavlovsk” is a CNF22 project cargo-passenger ferry being built at the “Zaliv” shipyard in occupied Kerch. The 120-meter ship, whose construction began in 2020, can accommodate 150 passengers and 28 trucks, or 78 passenger cars. Construction was almost complete…. The estimated cost of the project is approximately 4.5 billion rubles (about $57 million). Video is generated by grok AI

NSTRIKE

48,166 Aufrufe • vor 3 Monaten