Loading video...

Video Failed to Load

Go Home

Mosque built between Platforms 2 and 3 at Muzaffarpur Junction has become a major obstacle for railway operations. Trains move very close to the structure, raising serious safety concerns. Railway land must be kept free from encroachments

153,775 views • 2 months ago •via X (Twitter)

0 Comments

No comments available

Comments from the original post will appear here

Related Videos

On Sunday, March 22, 2026, a major crisis unfolded at Kalyan Railway Station in Maharashtra when a 35-year-old man climbed a high-tension overhead equipment (OHE) pole, paralyzing one of Mumbai’s busiest rail corridors. The Act: Around 2:00 PM, the man, suspected to be of unsound mind or intoxicated, scaled an electric pole that supplies power to platforms 1, 1A, and 2. Response: To prevent his electrocution, railway officials immediately suspended power on the "Down" line between Thakurli and Ambivli. Rescue Attempt: Emergency teams, including the Railway Protection Force (RPF), Government Railway Police (GRP), and the fire brigade, rushed to the scene. They attempted to persuade him to descend, but he continued moving across the high-voltage structure. Impact on Services The power shutdown lasted for approximately 1.5 hours, from 2:04 PM to 3:16 PM, causing massive delays. Stranded Commuters: Thousands of passengers were left waiting on platforms and inside stationary trains during the peak period. Train Delays: At least two long-distance mail/express trains and three suburban local trains were directly detained, while countless others across the network faced ripple-effect delays. Outcome and Safety Concerns Despite the power cut, the situation ended tragically when the man came into contact with a live wire (reportedly causing 25,000-volt "earthing") and fell onto the tracks. He sustained critical burn injuries, with some reports indicating burns over 90% of his body. He was transported to a government hospital for treatment in an auto-rickshaw due to a lack of immediate ambulance availability at the site. According to reports from the Government Railway Police (GRP): Initial Survival: He was rushed to a government hospital immediately after falling from the pole. Extent of Injuries: He suffered severe burns, with some reports stating they covered up to 90% of his body due to the high-voltage electrocution. Medical Status: As of late March 2026, he was still undergoing treatment for his life-threatening injuries. The incident caused a significant stir not just for the disruption, but also because of the lack of an immediate ambulance at the station, requiring him to be taken for medical help in an auto-rickshaw.

Imtiaz Mahmood

45,767 views • 3 months ago

Reviewed Key Rail Projects during the Parliamentary Standing Committee on Railways' study visit to Bengaluru. 1. Whitefield-Kengeri Suburban Rail Project: The 35-km Whitefield-Kengeri suburban rail (Parijatha line) will not be scrapped. The Modi Government-approved DPR for the 149.348-km Bengaluru Suburban Rail Project remains intact. 2. Panathur Railway Underpass (RUB): K-RIDE has already commissioned one vent way of the Panathur Railway Underpass (RUB), and the other will be commissioned by January 2025. 3. Carmelaram Rail Overbridge (ROB): The construction of the railway portion of the Carmelaram Rail Overbridge (ROB) is in progress. However, the approach work has been halted due to delays in land acquisition by the BBMP. 4. New Trains to Kempegowda International Airport: Requested a feasibility study for the introduction of new trains to Kempegowda International Airport from Bengaluru City, especially Whitefield. 5. Bengaluru Cantonment-Whitefield Quadrupling: The quadrupling of the Bengaluru Cantonment to Whitefield section will be completed by June 2025. 6. Doubling Projects: The doubling of the Hosur-Salem line via Yesvantpur station and the Baiyyappanahalli-Hosur line will be completed by August 2025. 7. Status of the Circular Rail Network: a. Oddarahalli-Devanahalli Segment: The survey is complete, and the DPR was submitted to the Railway Board on 23.09.2024 for ₹1638.24 Cr. The Railway Board has requested the complete DPR by February 2025. b. Remaining 6 Segments (Devanahalli-Malur-Heelalige-Hejjala-Solur-Nidavanda-Oddarahalli): The survey work is ongoing. 8. Bengaluru-Mumbai High-speed train: Proposed the introduction of a high-speed train between Bengaluru to Mumbai. 9. MEMU Trains Between Kengeri and Whitefield: Proposed the introduction of additional MEMU trains between Kengeri and Whitefield. 10. Namo Bharat Rapid Rail: Proposed the introduction of Namo Bharat Rapid Rail between Bengaluru-Tumakuru and Bengaluru-Mysuru.

P C Mohan

64,483 views • 1 year ago

Seriously, what a sour grape. I've spent the summer in Djibouti, and my observations and conversations with locals contradict everything you've said. While in Djibouti, I stopped at Ali Sabieh station, a minor station along the Addis Ababa-Djibouti railway that serves as a flagship project of China's Belt and Road Initiative and links landlocked Ethiopia with coastal Djibouti. It is Africa's first electrified trans-boundary railway. (Video 1, Picture 2) Manager of the Ali Sabieh passenger station, 32-year-old Souleiman Youssouf Ahmed, told me that the railway has greatly improved the safety and convenience of travel between Djibouti and Ethiopia. (Picture 3) According to Souleiman, Djiboutians flock to the Ethiopian city of Dire Dawa throughout the summer to escape the stifling heat. Minibuses were the only option from Dire Dawa to Ali Sabieh before the railway construction. While only designed to hold ten people, the minibus was frequently crammed with twenty. The minibus shared the road with the freight trucks; accidents were common. "The train cuts travel time by two hours while also providing passengers with the added bonuses of comfort and security. At its peak in the summer, the train has carried as many as 950 passengers in a single day," said Souleiman. Fatouma Houssein Daher, a Djiboutian girl who frequently takes the train to Ethiopia, expressed her appreciation for the railway, saying that it represents the friendship between China and Africa. "Taking the train to Ethiopia is a low-cost and comfortable option. It's lovely that the Chinese have helped us create our railway," she said. She added that she didn't understand why Western nations consistently disparage the railway that has made life easier for Djiboutians. Since it was put into operation in January 2018, the railway has seen 1,824 passenger trains pass through carrying nearly 530,900 people and 6,133 cargo trains with about 7,328,500 tonnes of goods. It has also cut the transportation time for goods from more than three days to less than 20 hours and reduced the cost by at least one third, substantially facilitating imports and exports from Ethiopia, a landlocked country in the Horn of Africa. So far, the Ethiopia-Djibouti railway has created 55,000 jobs in Ethiopia and Djibouti and provided training opportunities for more than 3,000 professionals, laying a solid foundation for the development of the railway industry in the two countries.

Eivor

19,217 views • 2 years ago