Loading video...
Video Failed to Load
Neutron testing continues at our Space Structures Complex in Middle River with the interstage on the test stand ready for its qualification campaign. We're running a series of static load tests and applying ~1,000 tonnes of force to simulate flight loads on the way to orbit.
153,988 views • 3 months ago •via X (Twitter)
0 Comments
No comments available
Comments from the original post will appear here

