Loading video...

Video Failed to Load

Go Home

Across the factory, teams advanced major Terran R structures, from stage 2 integration and shipment to propulsion, thrust structure, interstage, and stage 1 qualification hardware. ✓ Shipped stage 2 from Long Beach to NASA Stennis ✓ Installed outer engine LOX and fuel feedlines on the thrust structure ✓ Advancing...

13,802 views • 2 months ago •via X (Twitter)

0 Comments

No comments available

Comments from the original post will appear here

Related Videos