The new Hurstbridge Line tunnel which has been under construction for the last few months as apart of the North East Link/M80 works is now the second longest tunnel on the Melbourne Rail network outside of the CBD 🚇
18,519 次观看 • 1 年前 •via X (Twitter)
11 条评论

Video randomly from the MTM LinkedIn page of all places

Anyway only two more weeks to go for this shutdown. Hurstbridge Line will have been operating in sections for nearly 9 weeks once these works to build the new tunnel (or alternative naming). I actually think this is one of the longest rail shutdowns we’ve had for a while?

Actually nowhere near the longest, I forgot the whole Union Station clusterfuck which shutdown the Lilydale and Belgrave lines for more than 3 months lol

Could wind turbines become a key renewable energy solution in urban areas? 🌬️🌆 Until now, the large size of traditional wind turbines has hindered their adoption in cities. However, a new generation of urban wind turbines is now making strides 👀

I'm so against calling this thing a tunnel

Not actually a tunnel yet, they've only installed the concrete slab track and side walls - the roof still needs to be installed over the top.

I had no idea this was happening

Hunnel?

How sad they did not connect this to a rail tunnel built with the road tunnel to the north?

For the disruptions that this has caused, it looks pretty neat

Yay a second Metro Tunnel