Загрузка видео...
Не удалось загрузить видео
The Port Maduravoyal Double Decker Corridor is finally progressing well!
19,501 просмотров • 7 дней назад •via X (Twitter)
Комментарии: 5

Rubala7 дней назад
This stretch should be widened and added with proper rain water drains.. will be a massive upgrade to west Chennai 👌

Bala Subramanian7 дней назад
Agree. Two things can be done. They can remove baricades so that the road is wider where the work is done. Second is they can extend Union road along Cooum to link to the entry near Koyambedu. That will significantly ease traffic on the main road.

Sasikumar7 дней назад
Thank God the new govt didn't stop it.

Vignesh7 дней назад
Why is the pillar height so small?

SK6 дней назад
Is this that 20y old shelved project?


