正在加载视频...

视频加载失败

The whole structure should be demolished, and the engineer responsible should be held accountable for putting people’s lives at risk and wasting the country’s resources. Absolutely disgraceful.

34,740 次观看 • 1 个月前 •via X (Twitter)

23 条评论

christian Mu 的头像
christian Mu1 个月前

country’s resources ? Material and hardware was bought or donated by the government? 😂

Frank Kigenza 的头像
Frank Kigenza1 个月前

Quite fascinating how we’re swift and spot on whilst calling out misconduct, alleged crimes or gross negligence against private individuals and businesses, but so #Obsequious when reacting to the embezzlement & mismanagement of #Taxpayer money when exposed by the Auditor General or the Public Accounts Committee (PAC). #Focus ✌🏽

MUGISHA 的头像
MUGISHA1 个月前

Engineer wa nyawe yakoze 1 floor, ibindi bice abafundi barabyubaka 😂😂😂

Mkenya tu🇰🇪🇨🇦 的头像
Mkenya tu🇰🇪🇨🇦1 个月前

Engineers bo mu 🇷🇼 batekereza nkabakiliya..ngo rundamoooo ibyuma byinshi inyubako irakomera😂😂 . Issues might have happened 1. column slenderness issue 2.overloading of the slab 3.Concrete failure.. 4.Non load bearing walls Muduhe akazi Sha😂

thando 的头像
thando1 个月前

I know someone cheaper 😂😂😂

MURAMIRA Innocent 的头像
MURAMIRA Innocent1 个月前

Engineers are to blame in regard to this construction

Sir. Uracyaryamye 的头像
Sir. Uracyaryamye1 个月前

Absolutely

🕸️🕷️ 的头像
🕸️🕷️1 个月前

NZI UMWENJENIYERI WAMAKE😭😭😭😭😭

Mkenya tu🇰🇪🇨🇦 的头像
Mkenya tu🇰🇪🇨🇦1 个月前

Indeed yur an architect not an engineer!! The decision of demolishing should not be the solution... Erega nizihagaze ntizizewe njya mbibona ibishushanyo umujyi wakigali wapprova😂, zihagaze kubwa betting😂 Mu 🇷🇼, Ubwubatsi Turi hasi, turiyemera, dutabarwa mubutaka bukomeye

Sir. Uracyaryamye 的头像
Sir. Uracyaryamye1 个月前

It doesn't take engineer or architect to realize this shit failed terribly. Ubutaka bukomeye icyo bufasha inyubako ni ukudatebera. Structure idakomeye n'ubundi zasenyuka.

Mkenya tu🇰🇪🇨🇦 的头像
Mkenya tu🇰🇪🇨🇦1 个月前

Kandi IYO nyubako nta signs of foundation failure yerekanye cg ngo yike igice... Coz in construction engineering.. Differential settlement is the only failure yemerewe gubomora ukayishyira hasi. So yitse icyarimwe it can be improved.. Izindi failure nkizo zabaye the same thing.

TUBYUMVE 的头像
TUBYUMVE1 个月前

Uku gushaka kutwemeza ni igisebo. Ese Engeneer ntaterwa ishema n inzu yubatse imeze neza? Inzu ijya kugera hariya nta muntu n umwe urabona ikosa?

01 的头像
011 个月前

Start with the inspection team mu karere as well as the approving bodies..

Sir. Uracyaryamye 的头像
Sir. Uracyaryamye1 个月前

I would blame them if they approved structural details that could not support the entire weight of the building. But if the engineer built a different structure from what was approved, then he should be held accountable.

01 的头像
011 个月前

Site engineer goes through the approval procedures at each construction sequence. Who approved this?? You remember the case: ‘housing estate of Dubai’

𝐌𝐂 𝐑𝐖𝐀𝐌𝐀𝐒𝐈𝐌𝐁𝐈 的头像
𝐌𝐂 𝐑𝐖𝐀𝐌𝐀𝐒𝐈𝐌𝐁𝐈1 个月前

Ekisakitiri 🔥🔥

Jeanclaude wigicumbi 的头像
Jeanclaude wigicumbi1 个月前

Iherereye he

Toshokaan 的头像
Toshokaan1 个月前

Tf is this? 😂😂

Sir. Uracyaryamye 的头像
Sir. Uracyaryamye1 个月前

Disaster

Toshokaan 的头像
Toshokaan1 个月前

The engineer should be arrested

Mkenya tu🇰🇪🇨🇦 的头像
Mkenya tu🇰🇪🇨🇦1 个月前

Ikindi Kandi, nkaba engineers baratangira kwivugishwa ngo umukilia avugako ashaka uwamake😂 Bro nigute uha icyangombwa kuri structural calculations without a detailed drawings?? Nkabakora mukarere nabaswa babura experience..uzarebe drawings zabashinwa nabandi uzabona difference

AGRONOMME 🇷🇼 的头像
AGRONOMME 🇷🇼1 个月前

Leta yagorwa 😌

SP 的头像
SP1 个月前

Client: “Mpereze permit na drawings nifitiye umufundi wanjye🤒”

相关视频