Video yükleniyor...

Video Yüklenemedi

Ana Sayfaya Dön

This is the current situation in parklands where developers have constructed above the river and diverted the river to the county drainage system, causing massive flooding on the road, As President Ruto promised to reclaim all riparian land very soon this problem will be a thing of the past .

295,342 görüntüleme • 1 yıl önce •via X (Twitter)

10 Yorum

Dr.Bismark Umbili (PHD) profil fotoğrafı
Dr.Bismark Umbili (PHD)1 yıl önce

Was the county government of Nairobi on holiday when He did the construction. U create a problem then come back as a hero

cars by mtemi profil fotoğrafı
cars by mtemi1 yıl önce

You come out in the middle of the night to start blaming other people for your mess. Instead of coming out with the response team to solve the problem.

Gilbert OG🇰🇪 profil fotoğrafı
Gilbert OG🇰🇪1 yıl önce

Where was the inspectorate department?

Ndung'u wa Wachira profil fotoğrafı
Ndung'u wa Wachira1 yıl önce

His development must have been approved and inspected during construction. So why not ensure drainage is sorted then. ?

Edd Arsenal profil fotoğrafı
Edd Arsenal1 yıl önce

@JerotichSeii has been speaking about this,what have you guys done? Instead you have let the developers bully them. Your team is incompetent and corrupt wait for many more complaints in future. Shame on you

Nairobi Scents profil fotoğrafı
Nairobi Scents1 yıl önce

County government shifting the blame to developers

D profil fotoğrafı
D1 yıl önce

All know it’s the somali construction cartel and they not stopping at all! The development continues, excavation ongoing nearby at junction of Masari /2nd, construction ongoing at Highridge, 2nd , 6th parklands & on riparian land on 1st parklands & that too on top of rivers!

Raging Fire 🔥 profil fotoğrafı
Raging Fire 🔥1 yıl önce

😂😂😂 before the rains where were you? Who approved the plans? When do you start reclaiming the riparian land

Ahmedkadar profil fotoğrafı
Ahmedkadar1 yıl önce

This is just reactionary. Did it have to rain for the county govt to discover that ‘developers encroached and blocked’ drainage, bwana Katibu Mkuu? Prevention is better than cure.

Muhsin Hussein Ali profil fotoğrafı
Muhsin Hussein Ali1 yıl önce

napenda vile mmerusha ball kwa ule jamaa wa kutenga na sio kutenda! hii imeisha hivo!

Benzer Videolar

Arterial drainage maintenance works on the River Morningstar at Athlacca, Co. Limerick. These works were completed by the Office of Public Works (OPW) during the period November 2025 to January 2026. I visited the site last week when the machines had already left the site. However, I have been provided with photos showing the works underway. Significant areas of riparian woodland have been removed, and alluvial woodland was also cleared from islands within the river. There is evidence of substantial silt mobilisation and in-stream disturbance. The riverbanks have been destabilised as a result of the removal of trees and other vegetation. Although silt fences are now present, they did not prevent fine sediment and wet soil from entering the channel during the work. Machines tracked instream during the salmonid close season. This damage will affect the river for years to come, and a permanent loss of riparian woodland has occurred. The removal of woodland set back from the riverbank extends well beyond what would be considered to be river maintenance works. The River Morningstar is an important salmonid nursery and spawning tributary of the River Maigue. The lower reaches of the River Maigue form part of the Lower River Shannon Special Area of Conservation (SAC) and the River Shannon and River Fergus Estuaries Special Protection Area (SPA). Works like these are completed under the Arterial Drainage Act (1945). They are supposed to protect against flooding, but in reality, they have the opposite effect. By draining water off farmland too quickly, river works like this increase flood risk in downstream urban areas. This work was completed to protect wet farmland in a natural floodplain. We do need flood mitigation measures - but they need to be effective, sustainable, and based on evidence. In most cases that means slowing the flow of water through natural flood management techniques and restoring floodplains and wetlands to absorb excess water rather than pushing it downstream. We need to reform the Arterial Drainage Act (1945) and recognise the vital role that floodplains, alluvial woodlands and wetlands play in flood management and mitigation. Instead of fighting against nature, we should be working with it to ensure communities are truly protected in the long term. A healthy, functioning river catchment benefits everyone - not just wildlife, but the people who live alongside it too.