Загрузка видео...

Не удалось загрузить видео

На главную

This is why COMPLETE corridor segregation is required in #Mumbai. CSMT-bound 12126 Pune-Mumbai Pragati Express crosses over to enter the Up Through line at Vikhroli as the sixth line on which it is travelling ends abruptly at Vidyavihar and the train needs to continue its journey ahead to Dadar...

59,618 просмотров • 11 месяцев назад •via X (Twitter)

Комментарии: 0

Нет доступных комментариев

Здесь появятся комментарии из оригинального поста

Похожие видео

#WATCH | Mumbai: Regarding his meeting with MNS leaders, Dr Swapnil Dhanraj Nila, Chief Public Relations Officer (CPRO) of Central Railway, says, Today at Central Railway, a meeting was held with MNS representatives. During the meeting, the railway presented three main factual points. First, regarding the shifting of the Dadar-Ratnagiri train: the train was moved from Dadar to Ratnagiri in 2021. When train operations resumed post-COVID-19, the train was shifted to Diva from Dadar, and they were also told about the operational reasons, which include that, when this train crosses Diva station, it accesses the 5th and 6th lines, which coincides with the evening peak of suburban services. The train requires approximately 11–12 minutes to pass through the crossover, which significantly impacts the punctuality of suburban trains on both sides. This bottleneck at the Divagate was a major factor affecting punctuality in the Mumbai Division. Consequently, a cautious decision was made in 2021 to run the service from Diva to Ratnagiri instead of Daradar." He adds, "Information was also provided regarding the Dadar-Gorakhpur train. Previously, this train operated from Lokmanya Tilak Terminus (LTT). When LTT was converted into an LHB-based coaching depot, the service was shifted to Dadar. To accommodate this at Dadar, the number of coaches had to be reduced from 22 to 17... There have been no other changes to its operation, frequency, or stoppages; the only difference is that the train, which previously ran 'on demand,' has now been made a regular service. Additionally, it was shared that last week, 14 trains were regularised, 7 of which serve various cities in Maharashtra. Over the last 3–4 years, no trains have been cancelled in this region. Furthermore, several services to Madgaon have been introduced or improved: a regular service from CSMT to Madgaon started on June 28, 2023; a bi-weekly special from Bandra Terminus was introduced in 2024; and the frequency of the LTT-Madgaon train was increased from weekly to 4 times a week in November 2022. Currently, 21 trains run daily to the Konkan region from Mumbai, and another 25 trains pass from other stations... Over the past year, the central railway also operated 302 Ganpati special trains for the Konkan region, 52 summer specials and 26 Holi specials..." (24.03)

ANI

28,037 просмотров • 3 месяцев назад

Progress in Motion: Trial Run of Mumbai Metro Line 9! Flagged off the 'Trial run of Phase-1 of Mumbai Metro Route-9, from Kashigaon to Dahisar (East)' of the Mumbai Metropolitan Region Development Authority at Mira Bhayandar, Thane. The section of Metro Line 9 from Kashigaon to Dahisar (East) will be opened to the public after the technical testing is completed. The metro is a very good option for reducing traffic on the Western Express Highway and making travel easier for Mumbaikars. We are planning to provide smooth and direct connectivity from Netaji Subhash Chandra Bose Ground to Bandra along the Western Express Highway, and work is underway in different phases to achieve this. For the first time in the Mumbai Metropolitan Region, a double-decker bridge has been built in this section, where both the flyover and the metro line will be seen on the parallel structure. Soon, people will be able to travel by metro all the way to Virar. As more metro lines get connected, passengers will get a complete end-to-end travel solution. Planning is also underway to connect the metro with the bullet train station that is being developed at Vadhavan. DCM Eknath Shinde ji, DCM Ajitdada Pawar, Minister Pratap Sarnaik, MLC Niranjan Davkhare and other dignitaries were present. Eknath Shinde - एकनाथ शिंदे Ajit Pawar Pratap Baburao Sarnaik Niranjan Davkhare MMRDA Maha Mumbai Metro Operation Corporation Ltd #Maharashtra #Mumbai #MumbaiMetro

Devendra Fadnavis

12,353 просмотров • 1 год назад