Загрузка видео...

Не удалось загрузить видео

На главную

TMC Government opposes any and every infrastructural development and Orange Line of Kolkata Metro is the clearest example. After HC ruling on Chingrighata case filed by me, WB govt used taxpayer money to challenge Orange Line construction in Supreme Court. Compare that with Maharashtra where Devendra Fadnavis BJP govt...

13,880 просмотров • 4 месяцев назад •via X (Twitter)

Комментарии: 0

Нет доступных комментариев

Здесь появятся комментарии из оригинального поста

Похожие видео

A Century on Track. The Orange Line is rising. Mumbai’s Metro Line-12 – Orange Line Extension, being built by MMRDA, achieved another major construction milestone with the successful launch of its 100th U-girder near Dombivli MIDC Metro Station on Shilphata Road. The 23.57-km fully elevated corridor with 19 stations will deliver seamless, eco-friendly connectivity between Kalyan, Dombivli, Taloja and the Navi Mumbai International Airport. With this milestone, the project enters a faster execution phase, paving the way for quicker, cleaner and eco-friendly mobility between Thane and Navi Mumbai, while driving transit-oriented development across the Kalyan–Taloja belt. Running parallel to the Kalyan–Shilphata–Taloja corridor and integrating with the MSRDC Flyover for 7 km, the alignment will feature several engineering marvels including 100-metre clear spans near Kolegaon, critical Railway and ROB crossings, and high-rise station construction at 21–23 metres. Seamless interchanges will link commuters to Metro Line-5 at Kalyan, Metro Line-14 at Hedutane, and Navi Mumbai Metro Line-1 at Amandoot, with direct FOB integration to Central Railway at Kalyan Junction. The project is targeted for completion by May 2028. Progress so far: ✔️Survey and alignment for Kalyan–Manpada completed ✔️ First pile, pier cap and U-girder successfully cast and erected ✔️ Batching plant operational for full-scale construction ✔️Civil works and pier construction progressing along key stretches ✔️Land acquisition and R&R underway near Patripul and Amandoot Special spans: 54 m — APMC Kalyan Market | 56 m — Regency Anantam Chowk | 65 m (2 spans) — Central Railway ROB, Patripul | 75 m — Taloja ROB (steel superstructure) |100 m — Virar–Alibaug Multimodal Corridor near Kolegaon Building tomorrow’s MMR, one girder at a time. #MetroLine12 #OrangeLineExtension #MMRDA #MahaMumbaiMetro #OnTrack100 #Kalyan #Dombivli #Taloja #NaviMumbai #Thane #InfrastructureIndia #ReimaginingMMR #TransformingMMR #EngineeringExcellence #UGirderLaunch #ElevatedCorridor #SeamlessConnectivity #GreenMobility #FutureReadyMMR #MMRDA50 #ReimaginingMMR #TransformingMMR #MumbaiInMinutes #RebootingMumbai #ReshapingMMR #ProjectUpdates CMO Maharashtra Devendra Fadnavis Eknath Shinde - एकनाथ शिंदे Dr. Sanjay Mukherjee MAHARASHTRA DGIPR

MMRDA

13,698 просмотров • 7 месяцев назад

War Room in Action: Reviewed Housing, Metro, and Infrastructure Projects! Chaired the CMO War Room Meeting at Mantralay, Mumbai today, reviewing the progress of infrastructure projects. Instructed officials to accelerate the completion of all projects by making use of technology, and also highlighted that any new challenges must be reported to the War Room immediately so they can be addressed quickly, ensuring timely and effective execution of all projects. Reviewed progress on the following projects: ✅ BDD Chawl ✅ Metro Line 4 (Wadala–Kasarvadavali) ✅ Metro Line 5 (Thane–Bhiwandi–Kalyan) ✅ Metro Line 6 (Swami Samarth Nagar–Vikhroli) ✅ Metro Line 2B (DN Nagar–Mandale) ✅ Metro Line 7A (Andheri–CSMIA Terminal 2) ✅ Metro Line 9 (Dahisar (E)–Mira-Bhayander) ✅ Orange Gate–Marine Drive Tunnel ✅ Borivali–Thane Twin Tunnel ✅ Uttan–Virar Sea Link ✅ Sewri–Worli Elevated Corridor ✅ Pune Metro ✅ Dahisar–Bhayander Link Road ✅ Goregaon–Magathane DP Road ✅ Goregaon–Mulund Link Road ✅ Coastal Road (Northern Extension) ✅ Virar–Alibaug Multi-Modal Corridor ✅ Dharavi Redevelopment Project ✅ Jalna–Nanded Highway ✅ Pune Ring Road ✅ Bandra–Versova Sea Link ✅ Chhatrapati Sambhaji Nagar City Water Supply Project ✅ Kudus–Aarey Connectivity ✅ Kudus–Babhaleshwar PowerKasarvadavali Project ✅ Shikrapur–Babhaleshwar Power Project ✅ Vadhavan Port Project Concerned officials were present. #Maharashtra #Mumbai

Devendra Fadnavis

118,321 просмотров • 11 месяцев назад