正在加载视频...
视频加载失败
Trial run conducted on newly completed Katni Grade Separator UP Line.
11 条评论

Dear Sir, Please sanction Railway Division for Kazipet Junction and More Platforms

#ALP_Exam_Karwao nikamme tu apna kaam kar le vola tha December tak sara process complete ho jayega abhi tak 2nd CBT tujhse nhi ho par kya nikamma kewal reel banata hai kuch kaam kar le

The Katni Grade Separator UP Line is a part of a 14 km-long railway bridge project in Madhya Pradesh. It aims to improve rail connectivity with a total length of 21 km for both up and down lines, as per project details.

O juthe gatiya admi ye yaha aake dekh panipat side passanger ka haal salo sram krlo tum itne gatiya pan p aagye ho kya koi passanger train time se nhi chalti upar staion master kahthe ji karn ah krlo

Rail flyovers is a welcome step. Rather all available fixes to traffic bottlenecks should be prioritised and given Speed n Capacity increase KPIs to Rly officials. Ballastless tracks on viaducts improve availability (23.5 vs 20 hours of ballasted) of tracks and LCC savings.

UP-05 forged wheels: the ultimate performance upgrade for your Tesla. Available Now

सर जी जयपुर पुणे साप्ताहिक ट्रेन को रेगुलर करो और उसको पुणे से पहले चिंचवड़ स्टेशन आता है वहाँ स्टॉप पर दो, बहुत सुविधा हो जाएगी लोगों को ट्रेन no, 12940,12939

Trial run done on Katni Grade Separator UP Line 🚂

What happened to kashmir?

सर भारतीय रेलवे में ऑन बोर्ड एसी मैकेनिक को सेट क्यों उपलब्ध नहीं करवाया जाता है जबकि उनका ड्यूटी 40 से 50 घंटा लगातार चलते रहता है 👏👏

Awaiting for Kashmir
